Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
34470
Service:
DTV
Call Sign:
KGO-TV
Channel:
12 (High VHF)
File Number:
0000026889
FRN:
0003471331
Date Submitted:
05/21/2021

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

KGO TELEVISION, INC.

Doing Business As: KGO TELEVISION, INC.

77 WEST 66TH STREET, 16TH FLR

ATTN: JOHN W. ZUCKER, ESQ.

NEW YORK, NY 10023

United States

+1 (212) 456-7387 john.w.zucker@abc.com Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

The Preparer is same as the reimbursement contact.

 

 

 

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan KGO is being moved from channel 7 to channel 12. The plan is to bring up the new aux antenna on channel 7 and operate via the aux during the swap of the main antenna. We will then transition to channel 12 on the new main antenna. See Plan attached.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Auxiliary Transmitter

Back to Top

Add Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use Backup
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Platinum I
Year 2008
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 16.6 kW

Auxiliary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Auxiliary (Backup)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model VAXTE-24R37.
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 19.2 kW
Justification for New Transmitter The existing aux transmitter is a channel 7 specific solid state transmitter that can't be re-tuned

Auxiliary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 50 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 1500.0 square feet
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Auxiliary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Primary Transmitter

Back to Top

Add Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Platinum I
Year 2008
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 16.6 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model VAXTE-24R37.
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 19.2 kW
Justification for New Transmitter Current Transmitter is a channel 7 specific solid state transmitter and cannot be re-tuned

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 50 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 1500.0 square feet
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Abatement

Asbestos Removal

Electrical

General Electrical work

Paint

Paint

KGO Site Survey

Gates Air Basic Site Survey

FireStop

Fire safety Requirement

Seismic

Earthquake Safety Code

Transmitter De-Install

Remove (2) Platinum Transmitters model PTCD40P4

Hygienist

Worker Safety

Demo

HVAC Ductwork removal

Project Managment

P&O, General Conditions, Onsite Supervision

Ductwork Scaffold

HVAC Ductwork Removal

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Auxiliary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Auxiliary (Backup)
Description of Use Backup antenna
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Class A
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Other
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type Custom
ERP: 72.0 kW
Manufacturer
Model THV-5A7-C170
Year 2008

Auxiliary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Auxiliary (Backup)
Description of Use Backup Antenna
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Types Class Class A
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 70.0 kW
Manufacturer
Model TLS-V8/VP-R C160
Year 2019
Justification for New Antenna Needed to support new channel assignment.

Auxiliary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna?
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Auxiliary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Core Drill Holes

(3)

RF Testing Of Line

Testing cost of the new line

Fill Holes

(1) Floor and Wall

Removal of existing antenna

Estimated cost to remove current aux antenna

Custom Pipe Mount

Fabrication

New Aux antenna installation

Installation cost for new antenna

Antenna Equipment Rental

Temporary Antenna Rental

Primary Antenna

Back to Top

Add Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this antenna currently shared with any other stations? No
Is this antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Class A
Mounting Top Mount
Antenna position in stack Top
Polarization Circular
Type Other
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type Tesla Coil Full CP
ERP: 23.8 kW
Manufacturer
Model TCL-6A7(S)
Year 2008

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Types Class Class A
Mounting Top Mount
Antenna position in stack Top
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 23.8 kW
Manufacturer
Model THV-6A12/CP-R 4C160
Year 2019
Justification for New Antenna The current antenna is a channel 7 tuned antenna and will not work for the post transition channel (12).

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna?
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna?
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

RF Test Complex

RF Test

Switch Gear

Switch Gear associated with channel 12

Core Drill Holes

(2)

Demo

Old Antenna

Fill Holes

In floor and walls

Install

New Antenna

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Auxiliary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use Backup antenna
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 8 3/16 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 800 feet per run

Auxiliary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Auxiliary (Backup)
Description of Use Backup Antenna feed
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 3 1/8 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1000 feet per run
Justification for New Transmission Line The Aux antenna needs to move, and new transmission line is required for the new location.

Auxiliary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Demo Old Aux Line

Remove old Aux Line

Aux Line Install

Aux Antenna line installation

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1100 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1300 feet per run
Justification for New Transmission Line The current main line will not accommodate the output power levels of the post transition transmitter.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Main Line Install

Installation of new line for main antenna

Demo Old Main Line

Remove Old Main Line

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? Candelabra
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1001289
Coordinates (NAD83) Latitude (NAD83) 37° 45' 19.0" N-
Longitude (NAD83) 122° 27' 10.0" W-
Overall Structure Height 976.69 feet
Support Structure Height 779.85 feet
Ground Elevation Above Mean Sea Level (AMSL) 833.98 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner SUTRO TOWER INC
Date Constructed 03/27/1998

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
71586 KCNS DTV
70032 KSOL FM
6380 KOIT FM
65484 KOSF FM
35500 KQED DTV
25452 KPIX-TV DTV
65526 KRON-TV DTV
58912 KPJK DTV
51429 KFSF-DT DTV
59964 KISQ FM
43095 KMTP-TV DTV
35703 KTVU DTV

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for tower with candelabra
Tower Reinforcements Please select whether tower reinforcements are needed: Major Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Candelabra
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Tower Mapping

Tower Mapping

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 500
Explanation Project management for shared tower location
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment Yes
ASR Modification Yes
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements Yes
Additional Field Engineering Service Yes
Number of Days 20
Justification This is a shared location that requires coordination.

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Legal Fees Multi Station Project Ctrl

Project cost

Medical Facilites DTV Notices

Medical Notices

Neighborhood RF Survey

Surrounding neighborhood RF Studies

Permit Public Relations

Public Relations

Project Management

Sutro Tower

Alternate Site Study

Engineering, antenna, designs, Architectural, budgeting, etc

RF Exposure Reports

RF Exposure Reports

Update Architechtural Plans

Plans with new TL locations

Sutro Legal Fees

Legal Fees at Sutro

Architectural Plans

Sutro Architectural plans, building mapping

Building Permits

Estimated cost for building permits

Field Testing and Engineering

Testing at Sutro

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning Yes
Non-zoning permits Yes
BLM or NFS Coordination Yes
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

KFOG-FM Equipment

Equipment

Disposal

Remove old HW, fill concrete hole, patch roof, etc

Fork Lift Rental

Fork Lift

KFOG-FM Relocation

Relocation

KFOG-FM Testing

Testing

Post Assignmnet Antenna Studies

Application data, vertical sketches for structural engineering

Preliminary TL Parts List

Reconfiguration of combiners

Sales Tax

Local Sale Tax

Special Inspection

Welding & Bolts

VSWR Monitoring

Tower worker antenna lockout, Replaces Symphony

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,847,417.30 $1,964,783.76 N/A $1,955,759.54 N/A
Total for all systems $6,877,946.14 $10,017,834.97 N/A $6,751,412.94 N/A
Primary Transmitter VAXTE-24R37. $1,148,917.30 $1,207,812.65 $1,198,768.43
Ductwork Scaffold $75,244.72 $75,244.72 Reallocation to include Profit and Overhead, General Conditions, and Supervision for Wadleigh Group - See Cover letter for Invoice #20140894 $75,244.72 N/A
Project Managment $50,000.00 $50,000.00 Reallocation of Profit and Overhead, General Conditions, and Supervision for Wadleigh Group - See Cover letter for Invoice #20140894 $48,477.78 N/A
Demo $24,180.33 $24,180.33 Reallocation to include Profit and Overhead, General Conditions, and Supervision for Wadleigh Group - See Cover letter for Invoice #20140894 $24,180.33 N/A
Hygienist $2,272.32 $2,272.32 Reallocation to include Profit and Overhead, General Conditions, and Supervision for Wadleigh Group - See Cover letter for Invoice #20140894 $2,272.32 N/A
Transmitter De-Install $28,404.00 $28,404.00 Reallocation to include Profit and Overhead, General Conditions, and Supervision for Wadleigh Group - See Cover letter for Invoice #20140894 $28,404.00 N/A
Seismic $0.00 $0.00 N/A N/A N/A
FireStop $0.00 $0.00 N/A N/A N/A
Other -- Building Addition Size: 1500.0 $0.00 $0.00 N/A N/A N/A
Paint $4,162.61 $4,162.61 Reallocation to include Profit and Overhead, General Conditions, and Supervision for Wadleigh Group - See Cover letter for Invoice #20140894 $4,162.61 N/A
Abatement $10,765.12 $10,765.12 Reallocation to include Profit and Overhead, General Conditions, and Supervision for Wadleigh Group - See Cover letter for Invoice #20140894 $10,765.12 N/A
High VHF - Air Cooled Solid State Transmitter 16.6 . 20.7 kW $526,000.00 $534,181.32 See KGO VAXTE-24 Final Main PDF Actual Cost with Change orders Q-80093 ,Q-81019 $534,181.32 N/A
Electrical $247,886.20 $247,886.20 Reallocation to include Profit and Overhead, General Conditions, and Supervision for Wadleigh Group - See Cover letter for Invoice #20140894 $247,846.20 N/A
KGO Site Survey $7,502.00 $7,502.00 See: KGO Site Survey_Gates N/A N/A
50 Ton system $172,500.00 $223,214.03 Reallocation to include Profit and Overhead, General Conditions, and Supervision for Wadleigh Group - See Cover letter for Invoice #20140894 $223,234.03 Reduced HVAC load from 50T to 25T due to efficiencies.
Auxiliary Transmitter VAXTE-24R37. $698,500.00 $756,971.11 $756,991.11
Other -- Building Addition Size: 1500.0 $0.00 $0.00 N/A N/A N/A
50 Ton system $172,500.00 $223,214.02 Reallocation to include Profit and Overhead, General Conditions, and Supervision for Wadleigh Group - See Cover letter for Invoice #20140894 $223,234.02 Reduced HVAC load from 50T to 25T due to efficiencies.
High VHF - Air Cooled Solid State Transmitter 16.6 . 20.7 kW $526,000.00 $533,757.09 See KGO VAXTE-24 Final ALT PDF Actual Cost with Change orders Q-80092,Q-80914 $533,757.09 See KGO-TV Cover Letter for Invoice JW30004385 6-1 with quotes Q-74425 and , Q-74426 in response to RFAS File Number: 0000026889 - Invoice Repayment Request: KGO-TV, Facility ID: 34470

Components

Actual Information Description File Name
Ductwork Scaffold

Component Description:
Refer to progress payment#2 Wall Coring
Amount:
$7,700.00

Component Description:
Refer to progress payment#2 4 inch rubber base
Amount:
$4,313.86

Component Description:
Refer to progress payment#2 Structural Grout
Amount:
$6,816.96

Component Description:
See Item #4 of Invoice - Interior Partitions.
Amount:
$15,458.88

Component Description:
Line Item #9 of Invoice
Amount:
$14,202.00

Component Description:
Final Payment VCT
Amount:
$479.32

Component Description:
See Item #5 of Invoice - Hardware Supplies
Amount:
$7,811.10

Component Description:
Refer to progress payment #2 Rig and Hoist
Amount:
$4,260.60

Component Description:
Refer to progress payment#2 Roofing
Amount:
$14,202.00
Project Managment

Component Description:
Services thru 3/29/2019
Amount:
$8,583.96

Component Description:
Service from Feb 1st 2019 to March 1st 2019
Amount:
$595.92

Component Description:
Percent Complete 62.98
Amount:
$2,707.28

Component Description:
Percent Complete 57.14
Amount:
$1,955.44

Component Description:
Service from June 29, 2019 to July 26, 2019
Amount:
$4,626.20

Component Description:
Percent Complete 52.92
Amount:
$2,707.98

Component Description:
Percent Complete 70.45
Amount:
$2,550.24

Component Description:
32.79 Percent of total contract plus T&E
Amount:
$16,933.97

Component Description:
14.29 percent of total contract
Amount:
$6,601.98

Component Description:
Percent Complete 64.93
Amount:
$900.90

Component Description:
Expense Reimbursement
Amount:
$313.91
Demo

Component Description:
See Item#1 of invoice
Amount:
$24,180.33
Hygienist

Component Description:
See Item #3 of Invoice
Amount:
$2,272.32
Transmitter De-Install

Component Description:
Removal of Transmitter B Line #11
Amount:
$14,202.00

Component Description:
Removal of Transmitter A Line #10
Amount:
$14,202.00
Seismic Information not provided.
FireStop Information not provided.
Other -- Building Addition Size: 1500.0 Information not provided.
Paint

Component Description:
See Item #6 of Invoice
Amount:
$4,162.61
Abatement

Component Description:
See Item #2 of Invoice
Amount:
$10,765.12
High VHF - Air Cooled Solid State Transmitter 16.6 . 20.7 kW

Component Description:
Final Payment Line #20 Main Transmitter Mask Filter
Amount:
$10,524.07

Component Description:
Change Order# Q-80093
Amount:
($6,352.96)

Component Description:
Final Payment for line #10 Main Transmitter
Amount:
$63,817.57

Component Description:
Actual Freight Line#80
Amount:
$14,985.95

Component Description:
Final Payment Line #30 Main Transmitter Installation and Proof
Amount:
$6,920.09

Component Description:
Change Order # Q-81019
Amount:
$6,870.54

Component Description:
70% Down Payment, Installation and Proof for Main Transmitter
Amount:
$16,146.86

Component Description:
15% Down Payment Main Mask Filter
Amount:
$10,524.06

Component Description:
15% Down Payment Main Transmitter VAXTE - 24R37
Amount:
$63,817.56

Component Description:
70% down Payment, Mask Filter System for Main Transmitter
Amount:
$49,112.29

Component Description:
70% Down Payment, Transmitter VAXTE-24R37, Main
Amount:
$297,815.29
Electrical

Component Description:
Refer to progress payment #2 Electrical
Amount:
$70,408.55

Component Description:
Refer to progress payment #2 Change order #1 dated Jan 14, 2020
Amount:
$13,151.05

Component Description:
See Item #7 of Invoice - 60% of Electrical
Amount:
$140,466.75

Component Description:
Electrical
Amount:
$23,819.85

Component Description:
N/A
Amount:
N/A
KGO Site Survey Information not provided.
50 Ton system

Component Description:
Refer to progress payment #2 Change order dated Nov 12, 2019
Amount:
$12,220.00

Component Description:
Refer to progress payment#2 Total Cost 211014.03 divided by 2 equals 105507.02
Amount:
$105,507.02

Component Description:
Line Item #8 of Invoice 40% of total cost 168,580.50 divided by 2 equal 84,290.25
Amount:
$84,290.25

Component Description:
Refer to Final payment. Total cost 42433.52 divided by 2 equals 21216.76
Amount:
$21,216.76
Other -- Building Addition Size: 1500.0 Information not provided.
50 Ton system

Component Description:
Line Item #8 of Invoice 40% of total cost 168,580.50 divided by 2 equal 84,290.25
Amount:
$84,290.25

Component Description:
Refer to progress payment #2 Change order dated Nov 12, 2019
Amount:
$12,220.00

Component Description:
Refer to Final payment. Total cost 42433.52 divided by 2 equals 21216.76
Amount:
$21,216.76

Component Description:
Refer to progress payment#2 Total Cost 211014.03 divided by 2 equals 105507.01
Amount:
$105,507.01
High VHF - Air Cooled Solid State Transmitter 16.6 . 20.7 kW

Component Description:
15% Down Payment Back - up Transmitter VAXTE - 24R37
Amount:
$61,851.12

Component Description:
Change Order # Q-80914
Amount:
$6,870.54

Component Description:
Actual Freight Line # 90
Amount:
$14,561.74

Component Description:
Final Payment Line #50 Back Up Transmitter Mask Filter
Amount:
$10,524.06

Component Description:
Final Payment Line #40 Back Up Transmitter
Amount:
$61,851.12

Component Description:
Change Order # Q-80092
Amount:
$6,756.66

Component Description:
Final Payment Line #60 Back Up Transmitter Installation and Proof
Amount:
$6,920.08

Component Description:
70% Down Payment, Mask Filter System for Back Up Transmitter
Amount:
$16,146.86

Component Description:
15% Down Payment Back - up Mask Filter
Amount:
$10,524.06

Component Description:
70% Down Payment, Transmitter VAXTE-24R37, Backup
Amount:
$288,638.56

Component Description:
70% Down Payment, Installation and Proof for Back up Transmitter
Amount:
$49,112.29

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,504,328.84 $1,606,904.84 N/A $1,449,813.73 N/A
Total for all systems $6,877,946.14 $10,017,834.97 N/A $6,751,412.94 N/A
Primary Antenna THV-6A12/CP-R 4C160 $1,023,461.02 $1,019,611.02 $932,354.33
Fill Holes $12,335.00 $12,335.00 Overall FCC Criteria Cost Analysis PDF. Sutro Tower Repacking Estimate pkg PDF N/A N/A
Core Drill Holes $20,642.00 $20,642.00 KGO Cost Justification Per Sutro Est Dated Feb 26 2020, May 12 2020.pdf $20,641.65 N/A
Switch Gear $40,000.00 $40,000.00 New switch gear associated with moving to channel 12 N/A N/A
RF Test Complex $9,908.01 $9,908.01 KGO Cost Justification Per Sutro Est Dated Feb 26 2020, May 12 2020.pdf $9,908.01 N/A
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) $12,300.00 $8,780.00 N/A $0.00 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 Overall FCC Criteria Cost Analysis PDF. Sutro Tower Repacking Estimate pkg PDF N/A N/A
High VHF - Lower Power, Top Mount, Class A, basic slot antenna, 24 kW input, elliptically or circularly polarized $399,234.00 $399,234.00 Current Channel 7 specific antenna cannot be retuned to channel 12 Overall FCC Criteria Cost Analysis PDF. Sutro Tower Repacking Estimate pkg PDF $380,044.65 N/A
High VHF - Lower Power Top Mount Class A basic slot antenna elliptically or circularly polarized $0.00 $0.00 N/A N/A N/A
Install $357,500.78 $357,500.78 Overall FCC Criteria Cost Analysis PDF. Sutro Tower Repacking Estimate pkg PDF Revised Per ERI Quote 2/28/2019 $357,117.97 N/A
Demo $164,811.23 $164,811.23 Overall FCC Criteria Cost Analysis PDF. Sutro Tower Repacking Estimate pkg PDF Revised per ERI Quote 2/28/2019 $164,642.05 N/A
Auxiliary Antenna TLS-V8/VP-R C160 $480,867.82 $587,293.82 $517,459.40
Antenna Equipment Rental $120,000.00 $120,000.00 KGO incurred $120,000 costs to rent an auxiliary antenna on a temporary basis while it completed its transition from channel 7 to channel 12 (“Aux Rental Costs”). See attached Nexstar agreement with Invoices. $120,000.00 N/A
Custom Pipe Mount $43,160.00 $43,160.00 Sutro Tower Repacking Estimate pkg PDF Revised per ERI Quote 2/28/2019 $43,072.66 N/A
Removal of existing antenna $78,506.68 $78,506.68 Overall FCC Criteria Cost Analysis PDF. Sutro Tower Repacking Estimate pkg PDF Revised per ERI Quote 2/28/2019 $78,411.80 See Invoice #8714 (June 2019) page 32 and 33 for Explanation of cost changes Dated March 7th, 2019 from Eric Dausman, VP and COO of Sutro Tower Inc
Fill Holes $1,236.00 $1,236.00 Sutro Tower Repacking Estimate pkg PDF N/A N/A
RF Testing Of Line $3,060.00 $3,060.00 N/A N/A N/A
Core Drill Holes $7,463.00 $7,463.00 Sutro Tower Repacking Estimate pkg PDF N/A N/A
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $0.00 N/A N/A N/A
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) $12,300.00 $4,046.00 per Dielectric Quote # 170304 ESM-N (3-27-2018) $3,641.40 N/A
Sweep test of existing antenna $6,730.00 $3,060.00 N/A N/A N/A
High-VHF, Low Power, Class A basic slot antenna . side mount, elliptically or circularly polarized $27,900.00 $151,510.00 Per Sutro Estimate $97,346.35 N/A
High VHF - Lower Power, Side Mount, Class A, basic slot antenna, 70 kW input, directional,, elliptically or circularly polarized $0.00 $0.00 N/A N/A N/A
New Aux antenna installation $175,252.14 $175,252.14 Sutro Tower Repacking Estimate pkg PDF Revised per ERI Quote 2/28/2019 $174,987.19 N/A

Components

Actual Information Description File Name
Fill Holes Information not provided.
Core Drill Holes

Component Description:
Item#17
Amount:
$5,668.50

Component Description:
See Line Item#17
Amount:
$7,644.50

Component Description:
See item#17
Amount:
$1,970.60

Component Description:
Item#17
Amount:
$1,810.00

Component Description:
Line #17
Amount:
$3,548.05
Switch Gear Information not provided.
RF Test Complex

Component Description:
Line Item #10
Amount:
$5,628.24

Component Description:
Line Item #10
Amount:
$4,279.77
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) Information not provided.
Sweep test of existing antenna Information not provided.
High VHF - Lower Power, Top Mount, Class A, basic slot antenna, 24 kW input, elliptically or circularly polarized

Component Description:
See Line #7 Invoice# 8957
Amount:
$156,901.05

Component Description:
Line Item #7
Amount:
$47,572.34

Component Description:
see line# 7, Invoice 8517A
Amount:
$156,901.05

Component Description:
Line Item#7
Amount:
$18,670.21
High VHF - Lower Power Top Mount Class A basic slot antenna elliptically or circularly polarized Information not provided.
Install

Component Description:
Line Item #12
Amount:
$179.28

Component Description:
Line Item #12
Amount:
$268.92

Component Description:
Line Item #12
Amount:
$14,580.81

Component Description:
Line Item #12
Amount:
$268.92

Component Description:
Payment Due 60 Days After Mobilization
Amount:
$65,824.92

Component Description:
Sutro Line #12
Amount:
$102,142.47

Component Description:
Line Item #12
Amount:
$3,435.92

Component Description:
See Line# 12 Page 13 Progress payment Oct 23 2018 to ERI
Amount:
$33,177.07

Component Description:
Line Item#12
Amount:
$179.28

Component Description:
Sutro Line #12
Amount:
$68,094.98

Component Description:
Line #12 progress payment Jan 2019
Amount:
$33,177.07

Component Description:
See Line #12 Invoice# 8957
Amount:
$35,788.33
Demo

Component Description:
Line Item #11
Amount:
$86.17

Component Description:
Line Item #11
Amount:
$129.25

Component Description:
Line Item #11
Amount:
$1,651.52

Component Description:
Line Item #11
Amount:
$129.25

Component Description:
Payment due 60 Days after Mobilization
Amount:
$31,639.05

Component Description:
See Line #11 Invoice# 8957
Amount:
$17,469.10

Component Description:
Sutro Line #11
Amount:
$49,095.24

Component Description:
See Line# 11 Page 13 Progress payment Oct 23 2018 to ERI
Amount:
$15,813.07

Component Description:
Line Item#11
Amount:
$86.17

Component Description:
Sutro Line #11
Amount:
$32,730.16

Component Description:
Line #11 progress payment Jan 2019
Amount:
$15,813.07
Antenna Equipment Rental

Component Description:
Rental Payment Feb 2020
Amount:
$20,000.00

Component Description:
Rental Payment Dec 2019
Amount:
$20,000.00

Component Description:
Rental Payment March 2020
Amount:
$20,000.00

Component Description:
Rental Payment Nov 2019
Amount:
$20,000.00

Component Description:
Rental Payment April 2020
Amount:
$20,000.00

Component Description:
Rental Payment Jan 2020
Amount:
$20,000.00
Custom Pipe Mount

Component Description:
Line Item #43
Amount:
$33.81

Component Description:
See Line#43 Progress payment #2 to ERI At the time contract is signed
Amount:
$4,435.51

Component Description:
Line Item #43
Amount:
$22.54

Component Description:
Line Item #43
Amount:
$33.81

Component Description:
Line #43 progress payment Jan 2019
Amount:
$4,204.24

Component Description:
Line Item #43
Amount:
$432.08

Component Description:
See Line# 43 Page 13 Progress payment Oct 23 2018 to ERI
Amount:
$4,204.24

Component Description:
Payment Due 60 Days After Mobilization
Amount:
$8,277.22

Component Description:
Line Item#43
Amount:
$22.54

Component Description:
Sutro Line #43
Amount:
$8,562.67

Component Description:
Sutro Line #43
Amount:
$12,844.00
Removal of existing antenna

Component Description:
See Line #15 Invoice# 8957
Amount:
$8,589.31

Component Description:
Line Item #15
Amount:
$41.03

Component Description:
Line Item #15
Amount:
$61.55

Component Description:
Line Item #15
Amount:
$61.55

Component Description:
Line Item #15
Amount:
$786.56

Component Description:
Payment Due 60 Days After Mobilization
Amount:
$15,068.30

Component Description:
See Line# 15 Page 13 Progress payment Oct 23 2018 to ERI
Amount:
$7,396.30

Component Description:
Line Item#15
Amount:
$41.03

Component Description:
Sutro Line #15
Amount:
$15,587.95

Component Description:
Sutro Line #15
Amount:
$23,381.92

Component Description:
Line #15 progress payment Jan 2019
Amount:
$7,396.30
Fill Holes Information not provided.
RF Testing Of Line Information not provided.
Core Drill Holes Information not provided.
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) Information not provided.
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed)

Component Description:
Line Item #42 Dielectric Invoice MAN01025 (Line# 3)
Amount:
$1,820.70

Component Description:
45% invoice Line Item #3
Amount:
$1,820.70
Sweep test of existing antenna Information not provided.
High-VHF, Low Power, Class A basic slot antenna . side mount, elliptically or circularly polarized

Component Description:
Line Item #42 Dielectric Invoice MAN01025 (Line# 5)
Amount:
$4,640.85

Component Description:
Line Item #42 Dielectric Invoice MAN01025 (Line# 1)
Amount:
$34,006.50

Component Description:
Line Item#42
Amount:
$7,443.45

Component Description:
Line Item#42
Amount:
$583.60

Component Description:
Line Item #42
Amount:
$343.91

Component Description:
See Line Item #42
Amount:
$1,951.88

Component Description:
45% invoice Line Item #5
Amount:
$4,640.85

Component Description:
45% invoice Line Item #1
Amount:
$34,006.50

Component Description:
Line Item #42
Amount:
$9,728.81
High VHF - Lower Power, Side Mount, Class A, basic slot antenna, 70 kW input, directional,, elliptically or circularly polarized Information not provided.
New Aux antenna installation

Component Description:
See Line#47 Progress payment #2 to ERI At the time contract is signed
Amount:
$18,041.20

Component Description:
Line Item #47
Amount:
$89.07

Component Description:
Line Item #47
Amount:
$133.61

Component Description:
Line Item #47
Amount:
$4,789.73

Component Description:
Line Item #47
Amount:
$133.61

Component Description:
Sutro Line #47
Amount:
$33,834.56

Component Description:
Payment Due 60 Days After Mobilization
Amount:
$32,706.64

Component Description:
Line Item #47
Amount:
$1,707.22

Component Description:
Line #47 progress payment Jan 2019
Amount:
$16,355.32

Component Description:
See Line# 47 Page 13 Progress payment Oct 23 2018 to ERI
Amount:
$16,355.32

Component Description:
Sutro Line #47
Amount:
$50,751.84

Component Description:
Line Item#47
Amount:
$89.07

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $993,983.00 $1,062,248.00 N/A $503,020.11 N/A
Total for all systems $6,877,946.14 $10,017,834.97 N/A $6,751,412.94 N/A
Primary Transmission Line $710,534.00 $763,350.00 $476,870.26
Rigid Transmission Line - copper, 6 1/8" $262,600.00 $315,416.00 The current main line will not accommodate the output power levels of the post transition transmitter. See Sutro Tower Repacking Estimate Pkg PDF $237,706.26 N/A
Demo Old Main Line $149,311.00 $149,311.00 Overall FCC Criteria Cost Analysis PDF. Sutro Tower Repacking Estimate pkg PDF N/A N/A
Main Line Install $298,623.00 $298,623.00 Overall FCC Criteria Cost Analysis PDF. Sutro Tower Repacking Estimate pkg PDF $239,164.00 N/A
Auxiliary Transmission Line $283,449.00 $298,898.00 $26,149.85
Rigid Transmission Line - copper, 3 1/8" $104,000.00 $119,449.00 Overall FCC Criteria Cost Analysis PDF. Sutro Tower Repacking Estimate pkg PDF $19,773.85 N/A
Aux Line Install $119,449.00 $119,449.00 Overall FCC Criteria Cost Analysis PDF. Sutro Tower Repacking Estimate pkg PDF Note: Not new installation. Reconnection of old KGO Main Line as Aux Line. $6,376.00 N/A
Demo Old Aux Line $60,000.00 $60,000.00 Overall FCC Criteria Cost Analysis PDF. Sutro Tower Repacking Estimate pkg PDF N/A N/A

Components

Actual Information Description File Name
Rigid Transmission Line - copper, 6 1/8"

Component Description:
See Line #8 Invoice# 8957
Amount:
$83.37

Component Description:
Line Item#8
Amount:
$2,140.75

Component Description:
Line Item#8
Amount:
$642.53

Component Description:
Item#8
Amount:
$6,926.53

Component Description:
Line Item #8
Amount:
$2,818.15

Component Description:
see line# 8, invoice 8469A
Amount:
$7,056.00

Component Description:
See Line Item#8
Amount:
$91,550.25

Component Description:
Line #8
Amount:
$1,654.33

Component Description:
see line# 8, invoice 8420A
Amount:
$24,076.61

Component Description:
see line# 8, invoice 8420A, 1-15-19
Amount:
$24,076.61

Component Description:
See Line #8
Amount:
$9,207.49

Component Description:
See Line#8
Amount:
$91,550.25
Demo Old Main Line Information not provided.
Main Line Install

Component Description:
Line Item #14
Amount:
$15,553.86

Component Description:
See Line #14 Invoice# 8957
Amount:
$24,891.36

Component Description:
Line Item #14
Amount:
$5,605.88

Component Description:
Line Item#14
Amount:
$210.20

Component Description:
Line Item#14
Amount:
$5,789.25

Component Description:
See line Item# 14
Amount:
$984.00

Component Description:
Line Item#14
Amount:
$3,207.60

Component Description:
Item#14
Amount:
$56,565.27

Component Description:
Line #14 progress payment Jan 2019
Amount:
$15,089.63

Component Description:
see line# 14, invoice 8469A
Amount:
$24,856.25

Component Description:
Line #14
Amount:
($1,430.78)

Component Description:
Line#14
Amount:
$26,084.04

Component Description:
See Line #14
Amount:
$1,770.70

Component Description:
see line# 14, Invoice 8517A
Amount:
$21,429.41

Component Description:
Item#14
Amount:
$188.10

Component Description:
see line# 14, invoice 8420A
Amount:
$18,558.50

Component Description:
Line #14
Amount:
$18,667.89

Component Description:
see line# 14, invoice 8420A, 1-15-19
Amount:
$18,558.50

Component Description:
Line Item#14
Amount:
$1,142.84
Rigid Transmission Line - copper, 3 1/8"

Component Description:
See Line#44
Amount:
$19,773.85
Aux Line Install

Component Description:
Item#48A
Amount:
$6,376.00
Demo Old Aux Line Information not provided.

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $882,713.00 $3,726,927.35 N/A $1,735,865.82 N/A
Total for all systems $6,877,946.14 $10,017,834.97 N/A $6,751,412.94 N/A
Primary Tower TOWER $882,713.00 $3,726,927.35 $1,735,865.82
Major tower reinforcement/modifications $421,000.00 $2,483,527.00 KGO Cost Justification Per Sutro Est Dated Feb 26 2020, May 12 2020.pdf Sutro Line Item # 59D and 60 $667,103.33 N/A
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $1,198,205.35 KGO Cost Justification Per Sutro Est Dated Feb 26 2020, May 12 2020.pdf Sutro line Item 58 and 59A, B and C $1,023,507.40 N/A
Tower Mapping $20,713.00 $20,713.00 Overall FCC Criteria Cost Analysis PDF. Sutro Tower Repacking Estimate pkg PDF. $20,684.98 N/A
Structural engineering tower load study for a documented tower with candelabra $20,000.00 $24,482.00 Overall FCC Criteria Cost Analysis PDF. 1/6 cost Sutro Tower Repacking Estimate pkg PDF $24,570.11 Travel Expense Overage $88.11 See file Invoice #7956 with supporting Docs

Components

Actual Information Description File Name
Major tower reinforcement/modifications

Component Description:
Line Item#59D
Amount:
$171.42

Component Description:
Upfront payment with signing agreement Line Item #59D
Amount:
$97,054.28

Component Description:
Line Item #59D
Amount:
$64.28

Component Description:
Line Item#59D
Amount:
$21,666.49

Component Description:
Line Item#59D
Amount:
$2,317.42

Component Description:
2nd Payment before Mobilization: Due 1/2/2020 Line Item #59D
Amount:
$92,857.14

Component Description:
Line Item#59D
Amount:
$3,726.81

Component Description:
Line Item #59D
Amount:
$42.85

Component Description:
Line Item #59D
Amount:
$143,876.27

Component Description:
Line Item #59D
Amount:
$5,825.41

Component Description:
Line Item #59D
Amount:
$3,029.22

Component Description:
Line Item #59D
Amount:
$37,272.17

Component Description:
Line Item #59D
Amount:
$5,480.07

Component Description:
Revised 8116, See Line#60
Amount:
$26,308.33

Component Description:
Line Item#59D
Amount:
$468.57

Component Description:
See Line#60
Amount:
$3,324.16

Component Description:
Line Item #59D
Amount:
$60.00

Component Description:
3rd Payment before Mobilization: Due 2/1/2020 4th Payment before Mobilization: Due 4/1/2020 Line Item #59D
Amount:
$185,714.28

Component Description:
Line #60
Amount:
$5,986.67

Component Description:
see line#60
Amount:
$18,323.33

Component Description:
see line#60
Amount:
$13,534.16
Complex Tower (includes, for example, those with candelabras and/or stacked antennas)

Component Description:
Line Item#59C
Amount:
$34.39

Component Description:
Line#59B Payment Due 60 Days After Mobilization
Amount:
$7,761.35

Component Description:
Line#59C Payment Due 60 Days After Mobilization
Amount:
$12,628.15

Component Description:
See Line#59B/59.2 Progress payment #2 to ERI At the time contract is signed
Amount:
$12,043.50

Component Description:
See Line#59A/59.1 Progress payment #2 to ERI At the time contract is signed
Amount:
$18,421.87

Component Description:
See Line#59C/59.3 Progress payment #2 to ERI At the time contract is signed
Amount:
$19,595.46

Component Description:
Sutro Line #58
Amount:
$34,609.75

Component Description:
see line# 58, invoice 8469A
Amount:
$11,725.05

Component Description:
Line Item #58
Amount:
$195.00

Component Description:
Line Item #59A
Amount:
$172.42

Component Description:
Line Item #59A
Amount:
$93.25

Component Description:
Line Item #59B
Amount:
$21.13

Component Description:
Line Item #59C
Amount:
$34.39

Component Description:
Line Item#58
Amount:
$8,482.62

Component Description:
Line Item#59B
Amount:
$31.70

Component Description:
Line Item#59
Amount:
$52,697.29

Component Description:
Line Item#59A
Amount:
$139.88

Component Description:
Line Item#59C
Amount:
$51.59

Component Description:
Line Item#58
Amount:
$3,923.12

Component Description:
Line Item #58
Amount:
$4,196.27

Component Description:
Line Item #59
Amount:
$5,015.66

Component Description:
Line Item #59E
Amount:
$82.00

Component Description:
Line Item #59B
Amount:
$405.14

Component Description:
Line Item#58
Amount:
$15,424.55

Component Description:
Line Item #59
Amount:
$23,072.29

Component Description:
Line Item #59A
Amount:
$2,693.90

Component Description:
Line Item #59C
Amount:
$667.47

Component Description:
Sutro Line #59
Amount:
$65,491.11

Component Description:
Line Item #59C
Amount:
$659.16

Component Description:
See Line#59 Page 14 Progress payment Oct 23 2018 to ERI
Amount:
$42,169.21

Component Description:
Line Item #59A
Amount:
$139.88

Component Description:
Line Item #59C
Amount:
$51.59

Component Description:
Line Item #59B
Amount:
$31.70

Component Description:
Line Item #59
Amount:
$258.63

Component Description:
Sutro Line #59B
Amount:
$12,043.51

Component Description:
see line# 58, invoice 8420A, 1-15-19
Amount:
$4,887.33

Component Description:
See Line #58
Amount:
$5,876.05

Component Description:
Sutro Line #59C
Amount:
$13,063.65

Component Description:
Line Item #59A
Amount:
$5,237.02

Component Description:
See line# 58 Duplicate
Amount:
N/A

Component Description:
Line Item#59A
Amount:
$93.25

Component Description:
Line #58 Simpson Mark Up Adjustment
Amount:
($1,576.49)

Component Description:
See Line#59A Page 14 Progress payment Oct 23 2018 to ERI
Amount:
$20,247.33

Component Description:
Revised 8116, See Line#58
Amount:
$16,439.50

Component Description:
see line#58
Amount:
$1,124.35

Component Description:
see line# 58, Invoice 8517A
Amount:
$7,596.37

Component Description:
See Line Item#58
Amount:
$14,932.01

Component Description:
Line#59A Payment Due 60 Days After Mobilization
Amount:
$34,240.25

Component Description:
Line Item #59
Amount:
$37,301.67

Component Description:
See Line #59
Amount:
$45,044.40

Component Description:
Item#58
Amount:
$5,223.33

Component Description:
See Item#58
Amount:
$3,721.20

Component Description:
Line Item#59B
Amount:
$21.13

Component Description:
Line Item #58
Amount:
$7,744.71

Component Description:
Line #58
Amount:
$1,337.00

Component Description:
See Line#58
Amount:
$33,020.77

Component Description:
Sutro Line #59A
Amount:
$35,421.06

Component Description:
Line Item#58
Amount:
$15,424.55

Component Description:
see line#58
Amount:
$15,037.22

Component Description:
Line Item #59
Amount:
$8,648.44

Component Description:
see line#54
Amount:
$8,439.89

Component Description:
Line#58
Amount:
$2,453.13

Component Description:
see invoice line #58
Amount:
$3,788.50

Component Description:
see line #58
Amount:
$2,114.05

Component Description:
Sutro Line #59A
Amount:
$53,131.59

Component Description:
Line #58
Amount:
$4,186.66

Component Description:
Line Item #58
Amount:
$4,182.82

Component Description:
Line #58
Amount:
$8,907.82

Component Description:
Line #59A progress payment Jan 2019
Amount:
$20,247.33

Component Description:
Sutro Line #59
Amount:
$98,236.66

Component Description:
Line#59 Payment Due 60 Days After Mobilization
Amount:
$63,307.85

Component Description:
see line# 58, invoice 8420A
Amount:
$4,887.33

Component Description:
Line Item #58
Amount:
$138.12

Component Description:
Line Item#59
Amount:
$172.42

Component Description:
Line Item#58
Amount:
$616.87

Component Description:
See Line#59 Progress payment #2 to ERI At the time contract is signed
Amount:
$13,898.21

Component Description:
Line Item #58
Amount:
$146.25

Component Description:
Line #59 progress payment Jan 2019
Amount:
$42,169.22

Component Description:
Sutro Line #59C
Amount:
$19,595.47

Component Description:
Sutro Line #59B
Amount:
$8,029.01
Tower Mapping

Component Description:
Item#5
Amount:
$2,670.83

Component Description:
Adj. to spectrum repack invoice 8372A
Amount:
($21.67)

Component Description:
Sutro Line #5
Amount:
$1,481.09

Component Description:
see line #5
Amount:
$118.82

Component Description:
Line#5
Amount:
$268.67

Component Description:
see line# 5, Invoice 8517A
Amount:
$2,888.88

Component Description:
Item#5
Amount:
$4,184.71

Component Description:
Line Item#5
Amount:
$113.67

Component Description:
See Line Item#5
Amount:
$1,416.66

Component Description:
see item#5
Amount:
$3,081.56

Component Description:
See line#5
Amount:
$4,329.35

Component Description:
Revised 8116, See Line#5
Amount:
$152.41
Structural engineering tower load study for a documented tower with candelabra

Component Description:
Overage T&E $88.47
Amount:
$24,570.11

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $817,022.00 $828,426.02 N/A $508,710.87 N/A
Total for all systems $6,877,946.14 $10,017,834.97 N/A $6,751,412.94 N/A
Outside Professional Services $817,022.00 $828,426.02 $508,710.87
Field Testing and Engineering $75,000.00 $75,000.00 Overall FCC Criteria Cost Analysis PDF. 1/6 cost Sutro Tower Repacking Estimate pkg PDF $2,403.14 N/A
Building Permits $195,000.00 $195,000.00 Overall FCC Criteria Cost Analysis PDF. 1/6 cost Sutro Tower Repacking Estimate pkg PDF $191,375.16 N/A
Sutro Legal Fees $8,333.00 $8,333.00 06-29-17 Overall FCC Criteria Cost Analysis PDF. 1/6 cost Sutro Tower Repacking Estimate pkg PDF $6,157.39 N/A
Update Architechtural Plans $4,671.00 $4,671.00 Overall FCC Criteria Cost Analysis PDF. 1/6 cost Sutro Tower Repacking Estimate pkg PDF N/A N/A
RF Exposure Reports $3,500.00 $3,500.00 Local RF exposure reports at Sutro N/A N/A
Alternate Site Study $58,619.00 $58,619.00 Overall FCC Criteria Cost Analysis PDF. 1/6 cost Sutro Tower Repacking Estimate pkg PDF $71,450.53 Checking
Permit Public Relations $19,108.00 $19,108.00 Overall FCC Criteria Cost Analysis PDF. 1/6 cost Sutro Tower Repacking Estimate pkg PDF $12,211.05 N/A
Neighborhood RF Survey $3,333.00 $3,333.00 Overall FCC Criteria Cost Analysis PDF 1/6 cost $471.42 N/A
Medical Facilites DTV Notices $7,668.00 $7,668.00 DTVNotification Quote ABC Stations 1/3 cost N/A N/A
Legal Fees Multi Station Project Ctrl $30,600.00 $30,600.00 Overall FCC Criteria Cost Analysis PDF. 1/7 cost Sutro Tower Repacking Estimate pkg PDF $30,590.41 See Invoice for details
Additional Field Engineering Service, 20 Days $20,000.00 $20,000.00 06-29-17 Overall FCC Criteria Cost Analysis PDF N/A N/A
RF Exposure Measurements $21,050.00 $3,333.00 06-29-17 Overall FCC Criteria Cost Analysis PDF 1/6 cost N/A N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $75,000.00 N/A N/A N/A
ASR modification (prepare FCC Form 854) $2,105.00 $0.00 N/A N/A N/A
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet $10,520.00 $0.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A N/A N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $0.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application $4,210.00 $4,000.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A $3,381.62 N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,500.00 Quote N/A N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 06-29-17 Overall FCC Criteria Cost Analysis PDF N/A N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application $2,105.00 $11,000.00 Estimate based upon invoices received from CTJC $7,440.00 See explanation in response to Fund Administrator email dated Dec. 16, 2019
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $2,887.50 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,360.00 N/A $6,982.50 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 06-29-17 Overall FCC Criteria Cost Analysis PDF N/A N/A
Project management of the transition $79,000.00 $99,286.00 KGO Cost Justification Per Sutro Est Dated Feb 26 2020, May 12 2020.pdf N/A N/A
Project Management $91,500.00 $91,500.00 Overall FCC Criteria Cost Analysis PDF. 1/6 cost Sutro Tower Repacking Estimate pkg PDF $91,150.37 N/A
Architectural Plans $60,000.00 $60,000.00 KGO Cost Justification Per Sutro Est Dated Feb 26 2020, May 12 2020.pdf See Line Item 54 $54,694.68 N/A
Prepare and or review reimbursement form $2,630.00 $30,365.02 See:KGO Legal Services Estimate to complete the repacking See: KGO Legal Services Invoice for repacking covering period through June 3 See: KGO Legal Services Invoice for repacking covering period through June 2020 $27,515.10 N/A

Components

Actual Information Description File Name
Field Testing and Engineering

Component Description:
Line Item #46
Amount:
$2,403.14
Building Permits

Component Description:
Line Item #56
Amount:
$3,971.00

Component Description:
Line Item#56
Amount:
$19,207.92

Component Description:
Line Item#56
Amount:
$5,844.12

Component Description:
Line Item#56
Amount:
$26,769.63

Component Description:
Line Item #56
Amount:
$3,973.57

Component Description:
Line Item #56
Amount:
$3,420.67

Component Description:
Line Item#56
Amount:
$8,688.85

Component Description:
Line Item #56
Amount:
$2,622.33

Component Description:
Line Item #56
Amount:
$3,654.06

Component Description:
Line #56
Amount:
$2,054.30

Component Description:
SFDBI Building Permit
Amount:
$27,964.00

Component Description:
Line #56
Amount:
$5,171.32

Component Description:
Line Item#56
Amount:
$3,829.31

Component Description:
See Line#56
Amount:
$197.83

Component Description:
See Line #56
Amount:
$11,378.44

Component Description:
Item#56
Amount:
$966.15

Component Description:
See Line Item#56
Amount:
$523.29

Component Description:
See Line Item#56
Amount:
$67.68

Component Description:
Line Item#56
Amount:
$812.09

Component Description:
see line# 56, Invoice 8517A
Amount:
$704.66

Component Description:
Item#56
Amount:
$7,529.19

Component Description:
see line#56
Amount:
$4,666.93

Component Description:
Revised 8116, See Line#56
Amount:
$705.37

Component Description:
Line #56
Amount:
$2,174.70

Component Description:
Line Item #56
Amount:
$9,527.24

Component Description:
Line #56
Amount:
$1,685.06

Component Description:
Line#56
Amount:
$9,761.92

Component Description:
Line Item #56
Amount:
$10,478.17

Component Description:
Line # 56
Amount:
$12,260.62

Component Description:
See item#56
Amount:
$357.43

Component Description:
see line# 56, invoice 8469A
Amount:
$407.31
Sutro Legal Fees

Component Description:
Cooper White and Cooper Expense under alternate site study
Amount:
$6,157.39
Update Architechtural Plans Information not provided.
RF Exposure Reports Information not provided.
Alternate Site Study

Component Description:
see line# 2, invoice 8469A
Amount:
$12,916.66

Component Description:
Line Item #2
Amount:
$58,533.87
Permit Public Relations

Component Description:
Line Item #57
Amount:
$225.00

Component Description:
Line Item #57
Amount:
$632.14

Component Description:
Line Item#57
Amount:
$364.28

Component Description:
Line Item#57
Amount:
$771.42

Component Description:
Line Item#57
Amount:
$696.42

Component Description:
Line Item #57
Amount:
$1,392.85

Component Description:
Line Item #57
Amount:
$64.28

Component Description:
Line Item#57
Amount:
$139.28

Component Description:
Item#57
Amount:
$512.50

Component Description:
Line #57
Amount:
$375.00

Component Description:
Line#57
Amount:
$396.42

Component Description:
see line#57
Amount:
$712.50

Component Description:
Line Item #57
Amount:
$557.14

Component Description:
Line #57
Amount:
$212.50

Component Description:
see line# 57, invoice 8469A
Amount:
$312.50

Component Description:
see line# 57, invoice 8420A, 1-15-19
Amount:
$337.50

Component Description:
see line# 57, Invoice 8517A
Amount:
$525.00

Component Description:
see line# 57, invoice 8420A
Amount:
$337.50

Component Description:
See line# 57
Amount:
$439.28

Component Description:
See Line#57
Amount:
$516.49

Component Description:
Line Item#57
Amount:
$237.50

Component Description:
Item#57
Amount:
$387.50

Component Description:
Line #57
Amount:
$942.85

Component Description:
See Item#57
Amount:
$62.50

Component Description:
Line #57
Amount:
$137.50

Component Description:
Line Item #57
Amount:
$107.14

Component Description:
Sutro Line #57
Amount:
$150.00

Component Description:
Line Item#57
Amount:
$267.85

Component Description:
See Line Item#57
Amount:
$137.50

Component Description:
see line# 57
Amount:
$62.50

Component Description:
See Line Item#57
Amount:
$225.00

Component Description:
See Line #57
Amount:
$310.71
Neighborhood RF Survey

Component Description:
Line Item# 137
Amount:
$471.42
Medical Facilites DTV Notices Information not provided.
Legal Fees Multi Station Project Ctrl

Component Description:
Line Item# 139
Amount:
$1,073.22

Component Description:
Line Item #139
Amount:
$148.20

Component Description:
Line Item#139
Amount:
$44.78

Component Description:
Line Item#139
Amount:
$367.24

Component Description:
Line Item #139
Amount:
$1,260.24

Component Description:
Line Item #139
Amount:
$214.97

Component Description:
Line Item#139
Amount:
$217.68

Component Description:
See Item#139
Amount:
$1,587.60

Component Description:
Item#139
Amount:
$655.57

Component Description:
Revised 8116, See Line#139
Amount:
$283.49

Component Description:
see line#139
Amount:
$2,001.96

Component Description:
See Line#139
Amount:
$100.54

Component Description:
see line item #139
Amount:
$12,651.94

Component Description:
Line #139
Amount:
$280.04

Component Description:
Line #139
Amount:
$551.47

Component Description:
see line# 139, Invoice 8517A
Amount:
$1,276.56

Component Description:
See Line Item#139
Amount:
$1,519.20

Component Description:
see line# 139, invoice 8420A
Amount:
$238.05

Component Description:
see line# 139, invoice 8420A, 1-15-19
Amount:
$238.05

Component Description:
Line Item#139
Amount:
$367.17

Component Description:
See Line Item#139
Amount:
$934.48

Component Description:
see line# 139, invoice 8469A
Amount:
$274.07

Component Description:
Sutro Line #139
Amount:
$509.43

Component Description:
see line#139
Amount:
$2,281.73

Component Description:
Line#139
Amount:
$143.31

Component Description:
Item#139
Amount:
$634.20

Component Description:
Line #139
Amount:
$537.94

Component Description:
Line #139
Amount:
$435.33
Additional Field Engineering Service, 20 Days Information not provided.
RF Exposure Measurements Information not provided.
Comprehensive coverage verification via field study, if needed Information not provided.
ASR modification (prepare FCC Form 854) Information not provided.
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees - Negotiation of lease and other matters for shared locations Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
Legal Expense Resubmitted for Invoice Rejected on March 2nd, 2018
Amount:
$550.76

Component Description:
Legal Expense Resubmitted for Rejected Invoice on March 2nd, 2018
Amount:
$2,830.86
Prepare request for Special Temporary Authorization Information not provided.
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application

Component Description:
Jan26 to Feb22 2019 Aux Antenna Study
Amount:
$3,120.00

Component Description:
Jan28 to Feb9 2018 Aux Antenna Study
Amount:
$1,440.00

Component Description:
March24 to April5 2018 Aux Antenna Study
Amount:
$1,440.00

Component Description:
Feb23 to March22 2019 Aux Antenna Study
Amount:
$960.00

Component Description:
July1 to July13 2018 Aux Antenna Study
Amount:
$480.00

Component Description:
TV Aux Antenna Application for Ch12
Amount:
$480.00
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Item 2 see invoice details
Amount:
$2,887.50
Perform engineering study for new channel assignment and antenna development

Component Description:
Item 1 see invoice for details
Amount:
$6,982.50
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Project management of the transition Information not provided.
Project Management

Component Description:
Line Item #129
Amount:
$7,344.78

Component Description:
Line Item#129
Amount:
$4,280.68

Component Description:
Line Item#129
Amount:
$5,043.53

Component Description:
Line Item#129
Amount:
$7,881.91

Component Description:
Line Item #129
Amount:
$6,651.00

Component Description:
see line#129
Amount:
$738.22

Component Description:
Line Item#129
Amount:
$4,248.72

Component Description:
Line Item #129
Amount:
$4,376.44

Component Description:
Item#129
Amount:
$956.25

Component Description:
See Item#129
Amount:
$1,709.37

Component Description:
Line Item #129
Amount:
$4,189.44

Component Description:
Line#129
Amount:
$1,033.56

Component Description:
See Line#129
Amount:
$146.87

Component Description:
Line #129
Amount:
$583.33

Component Description:
see line# 129, invoice 8469A
Amount:
$1,188.75

Component Description:
Line #129
Amount:
$1,183.92

Component Description:
Item#129
Amount:
$944.58

Component Description:
See Line Item#129
Amount:
$759.37

Component Description:
see line #129
Amount:
$889.58

Component Description:
Line #129
Amount:
$1,162.50

Component Description:
see line# 129, invoice 8420A, 1-15-19
Amount:
$1,203.74

Component Description:
see line# 129, Invoice 8517A
Amount:
$938.74

Component Description:
see line item #129
Amount:
$5,315.62

Component Description:
Line Item #129
Amount:
$8,053.96

Component Description:
Line #129
Amount:
$1,396.42

Component Description:
Revised 8116, See Line#129
Amount:
$125.00

Component Description:
Line #129
Amount:
$1,180.35

Component Description:
Line Item #129
Amount:
$6,321.74

Component Description:
See Line #129
Amount:
$3,344.92

Component Description:
see line# 129, invoice 8420A
Amount:
$1,203.74

Component Description:
Sutro Line #129
Amount:
$2,051.38

Component Description:
Line Item#129
Amount:
$293.75

Component Description:
See Line Item#129
Amount:
$812.07

Component Description:
Line Item#129
Amount:
$4,799.88
Architectural Plans

Component Description:
See Line #54
Amount:
$5,780.19

Component Description:
Line Item #54A
Amount:
$1,705.88

Component Description:
Line Item#54
Amount:
$340.56

Component Description:
Line Item#54 Excludes $39.61 non- reimbursable T&E
Amount:
$209.60

Component Description:
Line Item #54A
Amount:
$1,442.40

Component Description:
Line Item #54A
Amount:
$1,522.23

Component Description:
see line# 54, invoice 8420A, 1-15-19
Amount:
$501.17

Component Description:
Line#54
Amount:
$7,103.48

Component Description:
Line #54
Amount:
$561.64

Component Description:
Line #54
Amount:
$1,332.28

Component Description:
Please reject component
Amount:
N/A

Component Description:
See Line Item#54
Amount:
$854.73

Component Description:
Line #54
Amount:
$10,460.42

Component Description:
Sutro Line #54
Amount:
$6,107.75

Component Description:
see line# 54, invoice 8420A
Amount:
$501.17

Component Description:
See Line Item#54
Amount:
$1,053.41

Component Description:
see line# 54, invoice 8469A
Amount:
$612.05

Component Description:
Revised 8116, See Line#54
Amount:
$2,255.97

Component Description:
Item#54
Amount:
$1,744.63

Component Description:
See Line#54
Amount:
$10,067.49

Component Description:
Line Item#54
Amount:
$1,038.80
Prepare and or review reimbursement form

Component Description:
Review for resubmission FCC notice
Amount:
$2,299.97

Component Description:
Services for May 30, 2019 Resubmission to exclude non reimbursable item.
Amount:
$116.02

Component Description:
Legal Expense
Amount:
$3,239.78

Component Description:
Legal Expense
Amount:
$2,238.39

Component Description:
Legall Expense
Amount:
$294.95

Component Description:
Legal Expense
Amount:
$1,237.86

Component Description:
Legal Expense
Amount:
$314.73

Component Description:
Legal Expense
Amount:
$742.44

Component Description:
Legal Expense
Amount:
$1,060.29

Component Description:
Legal Expense
Amount:
$353.43

Component Description:
Resubmission of KGO 399
Amount:
$982.88

Component Description:
Legal Expense
Amount:
$1,414.15

Component Description:
Legal related to form 399 Resubmitted for Invoice rejected on March 2nd, 2018
Amount:
$3,695.85

Component Description:
Legal Expense Resubmitted for Invoice rejected on March 2nd 2018
Amount:
$1,825.99

Component Description:
Legal Expense
Amount:
$294.52

Component Description:
Legal Expense
Amount:
$1,218.07

Component Description:
Resubmission of KGO 399
Amount:
$235.62

Component Description:
Resubmission of KGO 399
Amount:
$684.44

Component Description:
Legal Expense
Amount:
$1,531.96

Component Description:
Legal related to form 399 Resubmitted for invoice rejected on March 2nd, 2018
Amount:
$2,063.79

Component Description:
Legal Expense
Amount:
$1,964.49

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $832,482.00 $828,545.00 N/A $598,242.87 N/A
Total for all systems $6,877,946.14 $10,017,834.97 N/A $6,751,412.94 N/A
Other Expenses $832,482.00 $828,545.00 $598,242.87
Fork Lift Rental $25,636.00 $25,636.00 Overall FCC Criteria Cost Analysis PDF. 1/6 cost Sutro Tower Repacking Estimate pkg PDF $20,876.55 N/A
VSWR Monitoring $271,225.00 $271,225.00 KGO Cost Justification Per Sutro Est Dated Feb 26 2020, May 12 2020.pdf See Line Item 131 $251,951.22 N/A
Special Inspection $5,000.00 $5,000.00 Overall FCC Criteria Cost Analysis PDF. 1/3 cost Sutro Tower Repacking Estimate pkg PDF N/A N/A
Sales Tax $240,541.00 $240,541.00 Local Sales Tax and Two Transmitters Overall FCC Criteria Cost Analysis PDF. 1/6 cost. Two transmitters are KGO only Sutro Tower Repacking Estimate pkg PDF $116,285.87 N/A
Preliminary TL Parts List $4,250.00 $4,250.00 Overall FCC Criteria Cost Analysis PDF. 1/6 cost Sutro Tower Repacking Estimate pkg PDF $6,712.84 Peter Eckmann Consultants Invoice 1625
Post Assignmnet Antenna Studies $15,563.00 $15,563.00 Overall FCC Criteria Cost Analysis PDF. 1/6 cost Sutro Tower Repacking Estimate pkg PDF $5,099.14 N/A
KFOG-FM Testing $8,333.00 $8,333.00 Overall FCC Criteria Cost Analysis PDF. 1/3 cost Sutro Tower Repacking Estimate pkg PDF $336.10 N/A
KFOG-FM Relocation $112,000.00 $112,000.00 KGO Cost Justification Per Sutro Est Dated Feb 26 2020, May 12 2020.pdf See Line Item 64 $110,305.95 N/A
Disposal $8,333.00 $8,333.00 Overall FCC Criteria Cost Analysis PDF. 1/3 cost Sutro Tower Repacking Estimate pkg PDF $0.00 N/A
KFOG-FM Equipment $31,000.00 $31,000.00 KGO Cost Justification Per Sutro Est Dated Feb 26 2020, May 12 2020.pdf See Line Item 63 $28,142.33 N/A
MVPD Notification of Channel Change $8,136.00 $8,136.00 Actual Costs Incurred $8,136.00 N/A
Develop and air announcement of upcoming channel change $10,000.00 $10,000.00 On Air time to promote channel changes N/A N/A
Equipment Storage $10,000.00 $10,000.00 Transmitter storage for 30 months at 300/month $0.00 N/A
Equipment Delivery and Handling Charges $52,833.00 $52,833.00 Overall FCC Criteria Cost Analysis PDF. 1/6 cost Sutro Tower Repacking Estimate pkg PDF $30,159.95 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $16,442.00 $16,442.00 Overall FCC Criteria Cost Analysis PDF. 1/6 cost Sutro Tower Repacking Estimate pkg PDF $12,568.92 N/A
BLM or NFS Coordination $0.00 $0.00 N/A N/A N/A
Non-zoning permits $0.00 $0.00 N/A N/A N/A
Local Zoning $0.00 $0.00 N/A N/A N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $190.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 N/A N/A N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,070.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $7,668.00 See DTVNotification Quote ABC Stations $7,668.00 N/A

Components

Actual Information Description File Name
Fork Lift Rental

Component Description:
Sutro Line #125
Amount:
$858.33

Component Description:
Line Item #125
Amount:
$780.52

Component Description:
Line Item#125
Amount:
$757.78

Component Description:
Line Item#125
Amount:
$757.78

Component Description:
Line Item#125
Amount:
$757.78

Component Description:
Line Item #125
Amount:
$757.78

Component Description:
Line Item#125
Amount:
$757.78

Component Description:
Line Item #125
Amount:
$780.52

Component Description:
Item#125
Amount:
$858.33

Component Description:
Item#125
Amount:
$858.33

Component Description:
See Item#125
Amount:
$858.33

Component Description:
Line Item 125
Amount:
$780.52

Component Description:
Line #125
Amount:
$757.78

Component Description:
Line #125
Amount:
$757.78

Component Description:
See Line #125
Amount:
$757.78

Component Description:
Line #125
Amount:
$858.33

Component Description:
see line# 125, invoice 8420A, 1-15-19
Amount:
$858.33

Component Description:
see line# 125, invoice 8469A
Amount:
$858.33

Component Description:
Line#125
Amount:
$757.78

Component Description:
Line #125
Amount:
$858.33

Component Description:
See Line Item#125
Amount:
$858.33

Component Description:
see line# 125, Invoice 8517A
Amount:
$858.33

Component Description:
see line# 125, invoice 8420A
Amount:
$858.33

Component Description:
Line Item #125
Amount:
$757.78

Component Description:
Line Item #125
Amount:
$757.78

Component Description:
See Line Item#125
Amount:
$858.33

Component Description:
Line Item#125
Amount:
$757.78
VSWR Monitoring

Component Description:
Line Item# 131. Exclude travel protection $73.72 divide by 6 or 12.29
Amount:
$9,714.51

Component Description:
Line #131 excluding non reimbursable expense $35.88 from Peter Eckman Invoice #1741
Amount:
$4,205.98

Component Description:
Line Item #131
Amount:
$9,057.92

Component Description:
Line Item#131
Amount:
$1,762.03

Component Description:
Line Item#131
Amount:
$19,035.80

Component Description:
Line Item#131
Amount:
$4,005.14

Component Description:
Line Item #131
Amount:
$20,383.40

Component Description:
Line Item#131
Amount:
$8,184.93

Component Description:
Line Item #131
Amount:
$15,562.30

Component Description:
Line Item #131
Amount:
$8,763.09

Component Description:
Item#131
Amount:
$1,464.16

Component Description:
Line #131
Amount:
$34,714.49

Component Description:
Line#131
Amount:
$10,092.46

Component Description:
See Line #131
Amount:
$11,567.52

Component Description:
see line# 131, invoice 8469A
Amount:
$2,091.66

Component Description:
Item#131
Amount:
$1,822.11

Component Description:
See Line Item#131
Amount:
$1,960.00

Component Description:
see line# 131, Invoice 8517A
Amount:
$4,183.54

Component Description:
Line Item#131
Amount:
$55,395.09

Component Description:
see line# 131, invoice 8420A
Amount:
$1,569.09

Component Description:
Line Item #131
Amount:
$4,852.14

Component Description:
Line #131
Amount:
$2,937.55

Component Description:
see Item#131
Amount:
$2,264.68

Component Description:
Line #131
Amount:
$16,361.63

Component Description:
see line# 131, invoice 8420A, 1-15-19
Amount:
$1,569.09
Special Inspection Information not provided.
Sales Tax

Component Description:
Line#141
Amount:
$17,816.52

Component Description:
Line Item#141
Amount:
$1,100.95

Component Description:
Line Item #141
Amount:
($33,276.96)

Component Description:
Gates Air Invoice Main And Back Up Transmitters Sales Tax at 8.5%
Amount:
$84,341.79

Component Description:
Line Item #141
Amount:
$59.44

Component Description:
Item#141
Amount:
$19,159.54

Component Description:
Line Item#141
Amount:
$4,231.19

Component Description:
see line# 141, invoice 8420A, 1-15-19
Amount:
$9,576.21

Component Description:
see Item#141
Amount:
$1,019.07

Component Description:
See Line#141
Amount:
$9,462.55

Component Description:
Line Item# 141
Amount:
$2,320.62

Component Description:
see line# 141, invoice 8420A
Amount:
$9,576.21

Component Description:
Line #141
Amount:
$474.95
Preliminary TL Parts List

Component Description:
See line#4
Amount:
$4,249.74

Component Description:
see line#4
Amount:
$2,463.10
Post Assignmnet Antenna Studies

Component Description:
See Line #3
Amount:
$229.16

Component Description:
Line Item#3
Amount:
$20.83

Component Description:
Line Item#3
Amount:
$62.50

Component Description:
Item removed
Amount:
N/A

Component Description:
Item #3
Amount:
$91.66

Component Description:
see line# 3, invoice 8420A
Amount:
$233.33

Component Description:
see line# 3, invoice 8469A
Amount:
$570.83

Component Description:
Line Item#3
Amount:
$3,890.83

Component Description:
see line# 3, invoice 8420A, 1-15-19
Amount:
$233.33
KFOG-FM Testing

Component Description:
Line Item #65
Amount:
$336.10
KFOG-FM Relocation

Component Description:
Line Item #64
Amount:
$55.81

Component Description:
Line Item #64
Amount:
$37.20

Component Description:
Line Item#64
Amount:
$6,907.39

Component Description:
Line Item#64
Amount:
$55.81

Component Description:
Line Item #64A
Amount:
$27.33

Component Description:
Line Item#64
Amount:
$18,208.85

Component Description:
Line Item #64
Amount:
$1,596.57

Component Description:
Sutro Line #64
Amount:
$14,132.41

Component Description:
Line Item #64
Amount:
$713.09

Component Description:
Sutro Line #64
Amount:
$21,198.61

Component Description:
LIne#64
Amount:
$13,661.28

Component Description:
Line Item#64
Amount:
$37.20

Component Description:
Line #64 progress payment Jan 2019
Amount:
$6,853.19

Component Description:
Line Item #64
Amount:
$12,475.79

Component Description:
See Line# 64 Page 14 Progress payment Oct 23 2018 to ERI
Amount:
$6,853.19

Component Description:
See Line#64 Progress payment #2 to ERI At the time contract is signed
Amount:
$7,492.23
Disposal Information not provided.
KFOG-FM Equipment

Component Description:
Line Item#63
Amount:
$8,854.99

Component Description:
Line #63
Amount:
$7,698.90

Component Description:
Line #63
Amount:
$9,072.00

Component Description:
See Line Item#63
Amount:
$2,054.93

Component Description:
Line Item #63
Amount:
$275.83

Component Description:
Item#63
Amount:
$185.68
MVPD Notification of Channel Change

Component Description:
Notification #1 Notice Post Marked date 12/19/2019 - for MVPDs
Amount:
$4,068.00

Component Description:
Notification #2 Notice Post Marked date 3/5/2020 - for MVPDs
Amount:
$4,068.00
Develop and air announcement of upcoming channel change Information not provided.
Equipment Storage Information not provided.
Equipment Delivery and Handling Charges

Component Description:
45% Dielectric With order invoice for Auxiliary antenna MAN00472 Line 4
Amount:
$7,022.25

Component Description:
45% Dielectric prior to shipment, invoice for Auxiliary antenna MAN01025 Line 4
Amount:
$7,022.25

Component Description:
Line Item #127
Amount:
$2,891.23

Component Description:
Line Item#127
Amount:
$1,022.48

Component Description:
Line Item#127
Amount:
$1,223.61

Component Description:
Line Item#127
Amount:
$1,876.31

Component Description:
Line Item #127
Amount:
$270.19

Component Description:
Line Item #127
Amount:
$293.23

Component Description:
Line Item#127
Amount:
$1,801.45

Component Description:
Line Item #127
Amount:
$264.22

Component Description:
Item#127
Amount:
$149.15

Component Description:
Line Item #127
Amount:
$88.51

Component Description:
see line# 127, invoice 8469A
Amount:
$676.35

Component Description:
Line Item#127
Amount:
$3,413.50

Component Description:
Line #127
Amount:
$378.04

Component Description:
Item#127
Amount:
$89.58

Component Description:
Line Item #127
Amount:
$1,125.91

Component Description:
see line# 127, Invoice 8517A
Amount:
$255.31

Component Description:
See Line #127
Amount:
$7.93

Component Description:
see line# 127, invoice 8420A
Amount:
$288.45

Component Description:
see line# 127, invoice 8420A, 1-15-19
Amount:
$288.45
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
Line Item #123
Amount:
$200.78

Component Description:
Line Item #123
Amount:
$1,335.51

Component Description:
Line Item#123
Amount:
$1,028.57

Component Description:
Line Item#123
Amount:
$453.97

Component Description:
Line Item #123
Amount:
$445.16

Component Description:
Line Item #123
Amount:
$2,171.28

Component Description:
Item#123
Amount:
$208.33

Component Description:
Line Item#123
Amount:
$4,506.66

Component Description:
see line# 123, Invoice 8517A
Amount:
$2,218.66
BLM or NFS Coordination Information not provided.
Non-zoning permits Information not provided.
Local Zoning Information not provided.
FCC Filing Fees - Special Temporary Authorization request Information not provided.
FCC Filing Fees - Form 2100 license to cover application Information not provided.
FCC Filing Fees - Form 2100 minor change CP application Information not provided.
DTV Medical Facility Notification

Component Description:
Notification of Medical Facilities
Amount:
$7,668.00

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $6,877,946.14 $10,017,834.97 $6,751,412.94

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

John W Zucker

Assistant Secretary


05/21/2021

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

John W Zucker

Assistant Secretary


05/21/2021

Attachments

Back to Top