Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
65204
Service:
DTV
Call Sign:
WBBJ-TV
Channel:
35 (UHF)
File Number:
0000027055
FRN:
0003828696
Date Submitted:
05/07/2021

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

TENNESSEE BROADCASTING PARTNERS

Doing Business As: TENNESSEE BROADCASTING PARTNERS

Beverly B. Poston

ONE TELEVISION PLACE

CHARLOTTE, NC 28205

United States

+1 (704) 372-4434 BPoston@bahakel.com General Partnership

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

M. Anne Swanson

Legal Counsel

Wilkinson Barker Knauer LLP

M. Anne Swanson

1800 M Street NW

Suite 800N

Washington, DC 20036

United States

+1 (202) 383-3342 ASwanson@wbklaw.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan Install new interim antenna on tower for interim operations on existing channel, remove existing primary antenna from the tower. Install new primary antenna, install new primary transmitter. See Exhibit A.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model DCX-2(IOX/DCX Product Family)
Year 2004
Type Inductive Output Tube
IOT Power Type Two
Power Capacity 53 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model HPTV-PRLX-U32
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 55 kW
Justification for New Transmitter Manufacturer unable to re-tune existing XMTR. Replacement required to operate on reassigned channel. New XMTR is upgrade to solid state, but at a cost less than IOT. Still more given IOT-related transitional cost for building expansion. See Exhibit B.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring Yes
Size 2 inches
Length 500.0 feet
Other Electrical Service Yes
Description Circuit breakers and disconnects for transmitter, pumps, and heat exhangers. Cost estimate is based upon previous projects experience of a similar nature. See Exhibit I.
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Coax Interconnect

Materials and labor to install coax interconnect within building

Site Design and Survey by Manufacturer

Cost for site design and survey by manufacturer to determine electrical, HVAC, and space considerations for new primary transmitter and RF system. See Exhibit C. (Survey itself is in Exhibit B.)

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model TFU-30DSC-R-04
Year 2005

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 857.0 kW
Manufacturer
Model TFU-30DSC-R-04
Year 2018
Justification for New Antenna Existing primary antenna is on a fixed channel and cannot be re-tuned. New primary antenna is required to operate primary facility on reassigned channel. See Exhibit D.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna?
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Broadband Slot
Number of Stations Supported 1
Number of Panels/Bays 8
Lower Limit 470.00 MHz
Upper Limit 698.00 MHz
Design power capacity in use 100.0 %
Other Antenna Type N/A
ERP: 232.0 kW
Manufacturer
Model TFU-8WB-1-R C160
Year 2018
Justification for New Antenna Station has no existing auxiliary antenna. New interim antenna is required to operate on existing channel while existing primary antenna is removed from tower and new primary antenna is installed. See Exhibit E.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? B
Feed Line Size 4 1/16 inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Utilize Existing
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer Dielectric
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 987 feet per run

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Rebuild Parts for 6 inch Line

Rebuild parts for Main 6 inch line required following testing

6-75 Elbow

6-75 Elbow

6-75 to 6-50 Transformer

6-75 to 6-50 Transformer

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Rigid
Diameter 4 1/16 inches
Segment Length 20'
Other Segment Length
Number of parallel runs 1
Length 900 feet per run
Justification for New Transmission Line New interim transmission line is required for use with new interim antenna while existing primary antenna is removed from tower and new primary antenna is installed. See Exhibit E.

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Waveguide Transition

Waveguide transition to connect existing RF system to interim transmission line for interim operations. See Exhibit E.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? No
One or more FM, AM or TV radio broadcaster(s) N/A
Others Types of Users N/A
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1062330
Coordinates (NAD83) Latitude (NAD83) 35° 38' 16.0" N-
Longitude (NAD83) 088° 41' 33.0" W-
Overall Structure Height 1064.95 feet
Support Structure Height 987.85 feet
Ground Elevation Above Mean Sea Level (AMSL) 487.85 feet
Structure Type GTOWER - Guyed Structure Used for Communication Purposes
Tower Owner JACKSON TELECASTERS, INC.
Date Constructed 07/17/1969


Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Information not provided.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 480
Explanation Reassigned station does not have sufficient qualified internal personnel for project management. It is estimated that outside project management will be required for 60 days while new antennas, transmission line, and transmitter are installed.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification Yes
FAA Consultation (including preparation of FAA Form 7460) Yes
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

WBBJ Additional Repack Related Legal Services

Attorneys Fees - Repack requirements (vendor contracts, refinancing, tax, affiliation agreements, equipment selection/justification). See Exhibit H

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? No
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Wireless Microphones

To replace station's wireless microphones that will be displaced because existing channels are eliminated due to repack. See Exhibit F.

Tennessee Sales Tax

Sales tax to be paid to Tennessee for equipment purchased for repack.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,848,970.00 $1,404,518.00 N/A $1,390,398.95 N/A
Total for all systems $3,270,668.60 $2,536,173.80 N/A $2,244,670.05 N/A
Primary Transmitter HPTV-PRLX-U32 $1,848,970.00 $1,404,518.00 $1,390,398.95
UHF - Liquid Cooled Solid State Transmitter 52 - 61 kW $1,788,000.00 $1,344,048.00 N/A $1,344,048.00 N/A
2" Rigid Conduit and Wiring (Cost per foot) $13,000.00 $12,500.00 N/A N/A N/A
Other Electrical Service: Circuit breakers and disconnects for transmitter, pumps, and heat exhangers. Cost estimate is based upon previous projects experience of a similar nature. See Exhibit I. $7,500.00 $7,500.00 N/A $5,880.95 N/A
Coax Interconnect $25,170.00 $25,170.00 N/A $25,170.00 N/A
Site Design and Survey by Manufacturer $15,300.00 $15,300.00 N/A $15,300.00 N/A

Components

Actual Information Description File Name
UHF - Liquid Cooled Solid State Transmitter 52 - 61 kW

Component Description:
WBBJ Transmitter Deposit Invoice
Amount:
$470,416.80

Component Description:
WBBJ Transmitter Third Payment
Amount:
$403,214.40

Component Description:
WBBJ Transmitter Fourth Payment
Amount:
$67,202.40

Component Description:
WBBJ Transmitter Second Payment
Amount:
$403,214.40
2" Rigid Conduit and Wiring (Cost per foot) Information not provided.
Other Electrical Service: Circuit breakers and disconnects for transmitter, pumps, and heat exhangers. Cost estimate is based upon previous projects experience of a similar nature. See Exhibit I.

Component Description:
WBBJ Transmitter Electrical Installation
Amount:
$5,880.95
Coax Interconnect

Component Description:
WBBJ Coax Interconnect
Amount:
$25,170.00
Site Design and Survey by Manufacturer

Component Description:
Downpayment invoice for Site Survey and Design.
Amount:
$2,000.00

Component Description:
Final invoice for Site Survey and Design.
Amount:
$13,300.00

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $415,495.00 $252,522.50 N/A $252,522.50 N/A
Total for all systems $3,270,668.60 $2,536,173.80 N/A $2,244,670.05 N/A
Interim Antenna TFU-8WB-1-R C160 $207,180.00 $51,325.00 $51,325.00
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized $189,500.00 $44,925.00 N/A $44,925.00 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $6,400.00 N/A
Elbow complex, broadband, at antenna input, per 4 1/16. feedline (if needed) $10,950.00 $0.00 N/A N/A N/A
Primary Antenna TFU-30DSC-R-04 $208,315.00 $201,197.50 $201,197.50
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $6,400.00 N/A
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) $12,300.00 $10,297.50 N/A $10,297.50 N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $21,750.00 N/A $21,750.00 N/A
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $1,875.00 N/A $1,875.00 N/A
UHF - High Power, Side Mount, basic slot antenna, 857 kW input, horizontally polarized $160,875.00 $160,875.00 N/A $160,875.00 N/A

Components

Actual Information Description File Name
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized

Component Description:
WBBJ Interim Antenna Third Payment
Amount:
$4,492.50

Component Description:
WBBJ Interim Antenna Second Payment
Amount:
$20,216.25

Component Description:
WBBJ Interim Antenna First Payment
Amount:
$20,216.25
Sweep test of existing antenna

Component Description:
WBBJ Interim Antenna Repack Sweep Third Payment
Amount:
$640.00

Component Description:
WBBJ Interim Antenna Repack Sweep First Payment
Amount:
$2,880.00

Component Description:
WBBJ Interim Antenna Repack Sweep Second Payment
Amount:
$2,880.00
Elbow complex, broadband, at antenna input, per 4 1/16. feedline (if needed) Information not provided.
Sweep test of existing antenna

Component Description:
WBBJ Primary Sweep Third Payment
Amount:
$640.00

Component Description:
WBBJ Primary Sweep First Payment
Amount:
$2,880.00

Component Description:
WBBJ Primary Sweep Second Payment
Amount:
$2,880.00
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed)

Component Description:
WBBJ Primary Elbow Complex First Payment
Amount:
$4,633.88

Component Description:
WBBJ Primary Elbow Complex Second Payment
Amount:
$4,633.88

Component Description:
WBBJ Primary Elbow Complex Third Payment
Amount:
$1,029.74
Side mount brackets for high power antennas (if not included in antenna base cost)

Component Description:
WBBJ Primary Antenna Custom Mounts
Amount:
$21,750.00
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost)

Component Description:
WBBJ Scatter Study Third Payment
Amount:
$187.50

Component Description:
WBBJ Primary Scatter Study First Payment
Amount:
$843.75

Component Description:
WBBJ Primary Scatter Study Second Payment
Amount:
$843.75
UHF - High Power, Side Mount, basic slot antenna, 857 kW input, horizontally polarized

Component Description:
WBBJ Primary Antenna Fifth Payment
Amount:
$5,760.00

Component Description:
WBBJ Primary Antenna Fourth Payment
Amount:
$1,687.50

Component Description:
WBBJ Primary Antenna Third Payment
Amount:
$8,640.00

Component Description:
WBBJ Primary Antenna First Payment
Amount:
$72,393.75

Component Description:
WBBJ Primary Antenna Second Payment
Amount:
$72,393.75

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $150,595.00 $119,823.20 N/A $101,777.70 N/A
Total for all systems $3,270,668.60 $2,536,173.80 N/A $2,244,670.05 N/A
Interim Transmission Line $129,112.50 $98,340.70 $98,340.70
Rigid Transmission Line - copper, 4 1/16" $127,800.00 $97,028.20 N/A $97,028.20 N/A
Waveguide Transition $1,312.50 $1,312.50 N/A $1,312.50 N/A
Primary Transmission Line $21,482.50 $21,482.50 $3,437.00
Rebuild Parts for 6 inch Line $18,045.50 $18,045.50 N/A $0.00 N/A
6-75 Elbow $1,687.00 $1,687.00 N/A $1,687.00 N/A
6-75 to 6-50 Transformer $1,750.00 $1,750.00 N/A $1,750.00 N/A

Components

Actual Information Description File Name
Rigid Transmission Line - copper, 4 1/16"

Component Description:
WBBJ 4 Inch Transmission Line Component
Amount:
$577.50

Component Description:
WBBJ Interim Rigid Transmission Line Fourth Payment
Amount:
$5,760.00

Component Description:
WBBJ Interim Rigid Transmission Line Third Payment
Amount:
$3,292.52

Component Description:
WBBJ Interim Interconnect Line
Amount:
$5,925.50

Component Description:
WBBJ Interim Rigid Transmission Line First Payment
Amount:
$40,736.34

Component Description:
WBBJ Interim Rigid Transmission Line Second Payment
Amount:
$40,736.34
Waveguide Transition

Component Description:
WBBJ Interim Transition Third Payment
Amount:
$131.24

Component Description:
WBBJ Interim Transition Second Payment
Amount:
$590.63

Component Description:
WBBJ Interim Transition First Payment
Amount:
$590.63
Rebuild Parts for 6 inch Line

Component Description:
WBBJ Rebuild Kits for 6 Inch Line
Amount:
$18,045.50

Component Description:
WBBJ Rebuild Kits for 6 Inch Line
Amount:
$18,045.50
6-75 Elbow

Component Description:
WBBJ Dielectric 6-75 Elbow
Amount:
$1,687.00
6-75 to 6-50 Transformer

Component Description:
WBBJ Dielectric 6-50 to 6-75 Transformer
Amount:
$1,750.00

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $381,100.00 $362,000.00 N/A $224,150.00 N/A
Total for all systems $3,270,668.60 $2,536,173.80 N/A $2,244,670.05 N/A
Primary Tower GTOWER $381,100.00 $362,000.00 $224,150.00
Structural engineering tower load study for well documented tower $12,600.00 $12,000.00 N/A $20,700.00 Costs for analysis and testing are higher than estimated costs. See Exhibit K, Exhibit L, and Exhibit M. See attached revised invoices and WBBJ Form 399 Amendment 2-26-18
Minor tower reinforcement/modifications $158,000.00 $150,000.00 N/A $45,200.00 N/A
Tall Tower (greater than 500') $210,500.00 $200,000.00 N/A $158,250.00 N/A

Components

Actual Information Description File Name
Structural engineering tower load study for well documented tower

Component Description:
WBBJ Tower Wind and Ice Analysis Invoice
Amount:
$1,250.00

Component Description:
WBBJ Tower Inspection Invoice
Amount:
$6,000.00

Component Description:
Invoice for Utrasound Testing at west guy anchor.
Amount:
$1,000.00

Component Description:
Invoice for corrosion risk analysis on tower.
Amount:
$1,250.00

Component Description:
Invoice for tower inspection, structural analysis, and wind and ice report.
Amount:
N/A

Component Description:
Invoice for Ultrasound thickness testing on tower members (re-submitted)
Amount:
$5,000.00

Component Description:
WBBJ Tower Structural Analysis Invoice
Amount:
$6,200.00
Minor tower reinforcement/modifications

Component Description:
WBBJ Tower Modifications
Amount:
$45,200.00
Tall Tower (greater than 500')

Component Description:
WBBJ Tower Crew Third Payment
Amount:
$108,875.00

Component Description:
WBBJ Tower Crew Down Payment
Amount:
$9,875.00

Component Description:
WBBJ Tower Crew Progress Payment
Amount:
$39,500.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $131,597.40 $54,983.90 N/A $36,758.40 N/A
Total for all systems $3,270,668.60 $2,536,173.80 N/A $2,244,670.05 N/A
Outside Professional Services $131,597.40 $54,983.90 $36,758.40
WBBJ Additional Repack Related Legal Services $12,942.40 $12,942.40 N/A $12,942.40 See WBBJ Form 399 Amendment 2-26-18
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,775.50 Actual cost higher than predetermined cost. $2,775.50 N/A
ASR modification (prepare FCC Form 854) $2,105.00 $3,266.00 Actual cost higher than predetermined cost. $3,266.00 N/A
Project management of the transition $75,840.00 $0.00 N/A $0.00 N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A $10,213.50 See Exhibit J. See WBBJ Form 399 Amendment 2-26-18.
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $1,750.00 Please see revised invoices and WBBJ Form 399 Amendment 2-26-18.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A N/A N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application $2,105.00 $2,000.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A $500.00 N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,500.00 N/A $750.00 N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A $1,522.50 N/A
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application $4,210.00 $4,000.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A $2,663.50 N/A
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase $2,105.00 $2,000.00 N/A $375.00 N/A

Components

Actual Information Description File Name
WBBJ Additional Repack Related Legal Services

Component Description:
WBBJ Post-Auction Repack Legal Services
Amount:
$581.00

Component Description:
WBBJ Post-Auction Repack Legal Services
Amount:
$982.50

Component Description:
WBBJ Post-Auction Repack Legal Services
Amount:
$660.00

Component Description:
WBBJ Post-Auction Repack Legal Services
Amount:
$65.50

Component Description:
WBBJ Post-Auction Repack Legal Services.
Amount:
$1,638.40

Component Description:
WBBJ Post-Auction Repack Legal Services.
Amount:
$7,814.00

Component Description:
WBBJ Post-Auction Repack Legal Services.
Amount:
$819.00

Component Description:
WBBJ Post-Auction Repack Legal Services
Amount:
$262.00

Component Description:
WBBJ Post-Auction Repack Legal Services
Amount:
$120.00
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application

Component Description:
WBBJ License to Cover Legal Services
Amount:
$2,775.50
ASR modification (prepare FCC Form 854)

Component Description:
WBBJ ASR Legal Services
Amount:
$856.00

Component Description:
WBBJ ASR Legal Services
Amount:
$314.00

Component Description:
WBBJ ASR Legal Services
Amount:
$2,096.00
Project management of the transition Information not provided.
Prepare and or review reimbursement form

Component Description:
WBBJ Post-Auction Repack Legal Issues.
Amount:
$662.00

Component Description:
WBBJ Post-Auction Repack Legal Issues.
Amount:
$3,882.00

Component Description:
WBBJ Post-Auction Repack Legal Services.
Amount:
$1,475.00

Component Description:
WBBJ Post-Auction Repack Legal Issues.
Amount:
$3,260.00

Component Description:
WBBJ Post-Auction Repack Legal Services (re-submitted)
Amount:
$175.50

Component Description:
WBBJ Post-Auction Repack Legal Services.
Amount:
$175.00

Component Description:
WBBJ Repack Legal Issues
Amount:
$660.00

Component Description:
WBBJ Post-Auction Repack Legal Issues.
Amount:
$759.00
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Perform engineering study for new channel assignment and antenna development

Component Description:
Invoice for Engineering study work for new channel assignment and antenna development.
Amount:
N/A

Component Description:
Invoice for Engineering study work for new channel assignment and antenna development.
Amount:
$187.50

Component Description:
Invoice for Engineering study work for new channel assignment and antenna development.
Amount:
$1,500.00

Component Description:
Invoice for Engineering study work for new channel assignment and antenna development.
Amount:
$62.50
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application Information not provided.
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application

Component Description:
WBBJ Engineering for License Application
Amount:
$500.00
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application Information not provided.
Prepare request for Special Temporary Authorization

Component Description:
WBBJ Engineering for STA
Amount:
$750.00
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
Construction Permit Legal Issues.
Amount:
$480.00

Component Description:
WBBJ Construction Permit Legal Services
Amount:
$604.50

Component Description:
Construction Permit Legal Issues.
Amount:
$438.00
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization

Component Description:
WBBJ STA Legal Services
Amount:
$2,663.50
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase

Component Description:
WBBJ FAA Notifications
Amount:
$375.00

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $342,911.20 $342,326.20 N/A $239,062.50 N/A
Total for all systems $3,270,668.60 $2,536,173.80 N/A $2,244,670.05 N/A
Other Expenses $342,911.20 $342,326.20 $239,062.50
Tennessee Sales Tax $238,875.00 $238,875.00 N/A $152,122.30 N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A $2,450.00 N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,070.00 N/A N/A N/A
Non-zoning permits $500.00 $500.00 N/A N/A N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $58,605.16 $58,605.16 N/A $58,605.16 N/A
Equipment Delivery and Handling Charges $23,328.52 $23,328.52 N/A $23,328.52 N/A
Develop and air announcement of upcoming channel change $1,000.00 $1,000.00 N/A $625.00 N/A
MVPD Notification of Channel Change $1,396.52 $1,396.52 N/A $1,396.52 N/A
Wireless Microphones $6,016.00 $6,016.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $335.00 N/A $335.00 N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $200.00 Actual cost higher than predetermined cost. $200.00 N/A

Components

Actual Information Description File Name
Tennessee Sales Tax

Component Description:
WBBJ Tennessee Sales Tax
Amount:
$1,345.22

Component Description:
WBBJ Tennessee Sales Tax
Amount:
$12,562.52

Component Description:
WBBJ Tennessee Sales Tax
Amount:
$15,746.51

Component Description:
WBBJ Transmitter Third Payment Sales Tax
Amount:
$28,161.51

Component Description:
WBBJ Existing Transmitter Removal Sales Tax
Amount:
$6,925.00

Component Description:
WBBJ Coax Interconnect Sales Tax
Amount:
$3,146.25

Component Description:
WBBJ Transmitter Deposit Sales Tax
Amount:
$32,855.09

Component Description:
WBBJ Transmitter Fourth Payment Sales Tax
Amount:
$4,693.59

Component Description:
WBBJ Transmitter Second Payment Sales Tax
Amount:
$28,161.51

Component Description:
WBBJ Tennessee Sales Tax
Amount:
$3,485.11

Component Description:
WBBJ Tennessee Sales Tax
Amount:
$195.00

Component Description:
WBBJ Tennessee Sales Tax
Amount:
$703.93

Component Description:
WBBJ Tennessee Sales Tax
Amount:
$1,296.75

Component Description:
WBBJ Tennessee Sales Tax
Amount:
$12,844.31
DTV Medical Facility Notification

Component Description:
WBBJ Medical Facility Notifications
Amount:
$2,450.00
FCC Filing Fees - Form 2100 minor change CP application Information not provided.
Non-zoning permits Information not provided.
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
WBBJ Existing Transmitter Removal
Amount:
$55,400.00

Component Description:
WBBJ Phase 1 Coolant Disposal
Amount:
$1,453.20

Component Description:
WBBJ Phase 2 Coolant Disposal
Amount:
$1,751.96
Equipment Delivery and Handling Charges

Component Description:
WBBJ Dielectric Interim Shipping
Amount:
$3,230.71

Component Description:
WBBJ Dielectric Interim Shipping
Amount:
$177.82

Component Description:
WBBJ Primary Antenna Storage and Delivery
Amount:
$7,219.89

Component Description:
WBBJ Interim Antenna Storage and Delivery
Amount:
$12,170.00

Component Description:
WBBJ Dielectric Interim Shipping
Amount:
$530.10
Develop and air announcement of upcoming channel change

Component Description:
WBBJ Channel Change Notifications Legal Services
Amount:
$625.00
MVPD Notification of Channel Change

Component Description:
WBBJ MVPD Notifications
Amount:
$49.90

Component Description:
WBBJ MVPD Notifications
Amount:
$1,346.62
Wireless Microphones Information not provided.
FCC Filing Fees - Form 2100 license to cover application

Component Description:
WBBJ FCC License to Cover Application Fee
Amount:
$335.00
FCC Filing Fees - Special Temporary Authorization request

Component Description:
WBBJ FCC STA Application Fee
Amount:
$200.00

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $3,270,668.60 $2,536,173.80 $2,244,670.05

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Beverly Poston

President


05/07/2021

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Bevery Poston

President


05/07/2021

Attachments

Back to Top