Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
FLOOD COMMUNICATIONS OF OMAHA, LLC Doing Business As: FLOOD COMMUNICATIONS OF OMAHA, LLC |
Michael Flood 214 NORTH 17TH STREET SUITE1 NORFOLK, NE 68702 United States |
+1 (420) 371-0100 | mike@NEWSCHANNELNEBRASKA.COM | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Matthew H McCormick , Esq . Fletcher, Heald & Hildreth, PLC |
1300 N 17th Street Suite 1100 Arlington, VA 22209 United States |
+1 (703) 812-0400 | mccormick@fhhlaw.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Please see Transition Plan and Reimbursement Request Narrative |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | AT71P0 | |
Year | 2011 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 0.25 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | EC701HP-BB2 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.3 kW | |
Justification for New Transmitter | Existing transmitter insufficient power capability to make ERP. FURTHER, IN MARCH 2017 COMARK DESIGNATED AT71 AS NOT RECOMMENDED FOR RE-CHANNEL DUE TO PARTS AVAILABILITY. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | Yes | |
Size | 1.5 inches | |
Length | 100.0 feet | |
Other Electrical Service | Yes | |
Description | New Breaker Disconnect Box | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 5 tons | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | No | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 5.0 kW | |
Manufacturer | ||
Model | SL8 | |
Year | 2011 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 4 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 862.00 MHz | |
Design power capacity in use | 50.0 % | |
ERP: | 3.65 kW | |
Manufacturer | ||
Model | BAN-4000 CUSTOM | |
Year | 2018 | |
Justification for New Antenna | Tower failed and existing antenna destroyed. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Power Dividers | Does the panel antenna require power dividers? | No |
Cable Harness | Does the panel antenna require cable harness? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1022906 | |
Coordinates (NAD83) | Latitude (NAD83) | 40° 51' 10.0" N- |
Longitude (NAD83) | 096° 40' 37.0" W- | |
Overall Structure Height | 499.99 feet | |
Support Structure Height | 499.99 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 1146.97 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | DAVID W BRATCHER LLC | |
Date Constructed | 03/30/1990 |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 40 | |
Explanation | CURRENT TOWER FAILED. A NEW LEASE SITE WILL BE PURSUED, TRANSMITTER AND LINE PURCHASED AND INSTALLED. NEW SITE EXPECTED TO REQUIRE ELECTRIC SERVICE, HVAC AND OTHER SERVICES REQUIRING PROJECT MANAGEMENT. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 6 | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 6 | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
Other Legal Services |
Legal fees for advising station regarding displacement and transition to new channel |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $118,829.17 | $91,479.17 | N/A | $6,949.94 | N/A |
Total for all systems | $253,545.42 | $150,680.42 | N/A | $35,534.29 | N/A |
Primary Transmitter EC701HP-BB2 | $118,829.17 | $91,479.17 | $6,949.94 | ||
Transmitter Building Site Survey/Installation | $10,000.00 | $5,900.00 | N/A | $5,870.77 | 1 |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $65,000.00 | N/A | $0.00 | N/A |
1.5" Rigid Conduit and Wiring | $1,079.17 | $1,079.17 | N/A | $1,079.17 | N/A |
Other Electrical Service: New Breaker Disconnect Box | $3,500.00 | $3,500.00 | N/A | N/A | N/A |
5 Ton system | $20,250.00 | $16,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Transmitter Building Site Survey/Installation | |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | Information not provided. |
1.5" Rigid Conduit and Wiring | |
Other Electrical Service: New Breaker Disconnect Box | Information not provided. |
5 Ton system | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $17,355.00 | $13,000.00 | N/A | $0.00 | N/A |
Total for all systems | $253,545.42 | $150,680.42 | N/A | $35,534.29 | N/A |
Primary Antenna BAN-4000 CUSTOM | $17,355.00 | $13,000.00 | $0.00 | ||
Side Mount antenna brackets | $4,625.00 | $2,500.00 | N/A | N/A | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $3,500.00 | N/A | N/A | N/A |
UHF Broadband panel antenna (per panel), horizontally-polarized | $7,000.00 | $7,000.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Side Mount antenna brackets | Information not provided. |
Sweep test of transmission line and antenna | Information not provided. |
UHF Broadband panel antenna (per panel), horizontally-polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $56,190.00 | $8,150.00 | N/A | $8,150.00 | N/A |
Total for all systems | $253,545.42 | $150,680.42 | N/A | $35,534.29 | N/A |
Primary Tower TOWER | $56,190.00 | $8,150.00 | $8,150.00 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $8,150.00 | N/A | $8,150.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Short Tower (less than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $56,921.25 | $33,506.25 | N/A | $19,803.75 | N/A |
Total for all systems | $253,545.42 | $150,680.42 | N/A | $35,534.29 | N/A |
Outside Professional Services | $56,921.25 | $33,506.25 | $19,803.75 | ||
Other Legal Services | $2,000.00 | $2,000.00 | N/A | $1,550.00 | N/A |
RF Exposure Measurements | $12,100.00 | $2,500.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $13,410.00 | $4,470.00 | N/A | $3,353.75 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | $487.50 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $1,500.00 | CP application more complex than initially expected | $1,431.25 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | $650.00 | N/A |
Prepare request for Special Temporary Authorization | $7,680.00 | $2,560.00 | N/A | N/A | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | N/A | $1,100.00 | N/A |
Form 399 assistance or other Program Management costs | $6,243.75 | $6,243.75 | Form 399 more complex than initially expected - requiring additional legal services | $6,243.75 | N/A |
Project management of the transition | $4,220.00 | $3,700.00 | N/A | $987.50 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $4,000.00 | Form more complex and time consuming than initially expected | $4,000.00 | N/A |
Actual Information Description | File Name |
---|---|
Other Legal Services | |
RF Exposure Measurements | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | Information not provided. |
Perform engineering study for displacement application | |
Form 399 assistance or other Program Management costs | |
Project management of the transition | |
Prepare/ Review 399 reimbursement form |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $4,250.00 | $4,545.00 | N/A | $630.60 | N/A |
Total for all systems | $253,545.42 | $150,680.42 | N/A | $35,534.29 | N/A |
Other Expenses | $4,250.00 | $4,545.00 | $630.60 | ||
Equipment Delivery and Handling Charges | $2,500.00 | $2,500.00 | N/A | $30.60 | N/A |
FCC Filing Fees - Special Temporary Authorization request | $305.00 | $600.00 | 3 STA Filing Fees at $200 each. | $600.00 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Equipment Delivery and Handling Charges | |
FCC Filing Fees - Special Temporary Authorization request | |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $253,545.42 | $150,680.42 | $35,534.29 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Michael Flood Member 05/04/2021 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Michael Flood Member 05/04/2021 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Michael Flood Member 05/04/2021 |