Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
46979
Service:
DTV
Call Sign:
WLWT
Channel:
20 (UHF)
File Number:
0000026824
FRN:
0001587609
Date Submitted:
04/22/2021

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

Ohio/Oklahoma Hearst Television Inc.

Doing Business As: Ohio/Oklahoma Hearst Television Inc.

PO Box 1800

Raleigh, NC 27602

United States

+1 (919) 839-0300 shartzell@brookspierce.com Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

The Preparer is same as the reimbursement contact.

 

 

 

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan see attached document

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Sigma CD3300 P3
Year 2002
Type Inductive Output Tube
IOT Power Type Two
Power Capacity 50 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model ULXTE-72
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 47.2 kW
Justification for New Transmitter Existing IOT transmitter cannot be converted to post-transition channel, see GatesAir EOL and HTV IOT to Solid-State Justification statements. An IOT replacement is more expensive than proposed SS transmitter. See attached Comark IOT Transmitter quote.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) Yes
Power 300 kVA
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service Yes
Description transmitter installation electrical service. See attached Bertke Electric quote.
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Transmitter installation incidentals

equipment and supplies needed for transmitter installation

RF System Modifications

changes to RF system required for installation of repack transmitter

Transmitter Room Modification

remove equipment, walls etc. to make room for new transmitter

RF Sweep

RF sweep of the existing RF infrastructure in the transmitter building to determine what components would work with the WLWT's post-repack channel 20

Shipping

transmitter shipping

Heat Exchanger Filters

Filters to prevent debris embedding in cooling fins

RF Accessories

additional RF components required for transmitter operation

Sales Tax

transmitter sales tax

Electrical Accessories

Manufacturer required surge protection

Transmitter de-install

removal of old transmitter

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Bottom
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model TFU-30GBH-R 06
Year 2002

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Bottom
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 722.0 kW
Manufacturer
Model TFU-26GBH-R 06
Year 2018
Justification for New Antenna Current antenna is channel specific and cannot be used on post-transition channel. Antenna must be replaced.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna?
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna?
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Shipping

antenna shipping

Sales Tax

antenna sales tax

Antenna accessories

custom length transmission line & test transition

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Broadband Slot
Number of Stations Supported 1
Number of Panels/Bays 16
Lower Limit 470.00 MHz
Upper Limit 608.00 MHz
Design power capacity in use 60.0 %
Other Antenna Type N/A
ERP: 500.0 kW
Manufacturer
Model TFU-16WB
Year 2018
Justification for New Antenna The proposed interim antenna is broadband and can be used for both pre and post transition channels and is required to facilitate a smooth and on-time transition to the assigned post-transition channel.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Sales Tax

antenna sales tax

Shipping

antenna shipping

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Utilize Existing
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer Dielectric
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 950 feet per run

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Line sweep

test transmission line for use on post-transition channel

Refurbish Line

refurbish 6-1/8" transmission lines to be utilized by new top mount antenna

Elbows

replace tuned elbows for new channel

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Rigid
Diameter 6 1/8 inches
Segment Length Broadband
Other Segment Length
Number of parallel runs 1
Length 600 feet per run
Justification for New Transmission Line new transmission line required to support interim antenna

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Sales Tax

transmission line sales tax

Additional TL Components

additional elbows, hangers etc. to complete transmission line run

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? Terrain Constrained
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1038226
Coordinates (NAD83) Latitude (NAD83) 39° 07' 27.0" N-
Longitude (NAD83) 084° 31' 18.0" W-
Overall Structure Height 950.12 feet
Support Structure Height 895.99 feet
Ground Elevation Above Mean Sea Level (AMSL) 837.92 feet
Structure Type LTOWER - Lattice Tower
Tower Owner Ohio/Oklahoma Hearst Television Inc.
Date Constructed 01/01/1997

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
65666 WCET DTV

Other Types of Users

Users
Amateur Radio

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Serious Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Terrain constrained
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Power line relocation

relocation of electrical lines to allow crew access

Tower Consulting

tower consulting and tower project management

Land clearing

remove trees and brush. Required for tower modifications.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? No
Number of Hours N/A
Explanation N/A
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 2
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 3
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements Yes
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Security

Security service during tower modifications & antenna installation

Transmitter Site Survey

Transmitter planning survey & transmitter building drawings (aka Field Service, TV)

Transmitter Site Survey Sales Tax

Transmitter planning survey & transmitter building drawings (aka Field Service, TV)

Non-catalog Legal Expenses

Non-Catalog expenses for legal advice and services, including financial/reimbursement review, transition reporting, transition procedures, and other transition-related issues.

Consulting-Project Management

Project Management and/or Consulting

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Contract Labor

labor directly related to the station channel change

in-house labor

in-house labor directly related to station's repack

Tower site restoraton

repair damage due to heavy equipment at tower site

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,901,185.61 $1,600,920.42 N/A $1,600,920.42 N/A
Total for all systems $4,495,197.27 $3,609,774.09 N/A $3,609,607.05 N/A
Primary Transmitter ULXTE-72 $1,901,185.61 $1,600,920.42 $1,600,920.42
Transmitter de-install $34,177.33 $34,177.33 removal of old transmitter to make room for replacement $34,177.33 N/A
Electrical Accessories $3,884.98 $3,884.98 Manufacturer required surge protection $3,884.98 N/A
Sales Tax $94,714.17 $94,714.17 transmitter and transmitter parts sales tax $94,714.17 N/A
RF Accessories $65,289.39 $65,289.39 Additional RF components required for transmitter operation and integration into current RF environment. $65,289.39 N/A
Heat Exchanger Filters $1,000.00 $1,000.00 per quote $1,000.00 N/A
Shipping $17,483.11 $17,483.11 shipping per attached GatesAir invoice $17,483.11 N/A
RF Sweep $6,400.00 $6,400.00 RF sweep of the existing RF infrastructure in the transmitter building to determine what components would work with the WLWT's post-repack channel 20. $6,400.00 N/A
Transmitter Room Modification $35,647.23 $35,647.23 building mods required for new transmitter $35,647.23 N/A
RF System Modifications $31,112.93 $31,112.93 RF system modifications required to allow repack transmitter installation $31,112.93 N/A
Transmitter installation incidentals $5,455.47 $5,455.47 parts, supplies and equipment needed for transmitter installation $5,455.47 N/A
Other Electrical Service: transmitter installation electrical service. See attached Bertke Electric quote. $96,221.00 $96,221.00 per Bertke Electrical invoices $96,221.00 N/A
Transformer 3 phase/480v - 300 KVA $36,800.00 $16,867.80 N/A $16,867.80 N/A
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW $1,473,000.00 $1,192,667.01 GatesAir quote sections A, B & E. plus change orders $1,192,667.01 N/A

Components

Actual Information Description File Name
Transmitter de-install

Component Description:
WLWT GA transmitter de-install
Amount:
$25,550.85

Component Description:
WLWT de-install forklift rental 1
Amount:
$3,039.92

Component Description:
WLWT de-install forklift rental 2
Amount:
$1,631.56

Component Description:
WLWT old transmitter outside equipment removal
Amount:
$3,955.00
Electrical Accessories

Component Description:
WLWT transmitter electrical accessories
Amount:
$3,884.98
Sales Tax

Component Description:
WLWT transmitter RF components sales tax
Amount:
$2,192.16

Component Description:
WLWT transmitter sales tax 3
Amount:
$1,788.56

Component Description:
WLWT transmitter sales tax 2
Amount:
$7,913.37

Component Description:
WLWT transmitter sales tax
Amount:
$82,820.08
RF Accessories

Component Description:
WLWT transmitter RF accessories
Amount:
$65,289.39
Heat Exchanger Filters

Component Description:
WLWT heat exchanger filters
Amount:
$1,000.00
Shipping

Component Description:
WLWT transmitter shipping
Amount:
$17,483.11
RF Sweep

Component Description:
WLWT RF sweep of existing switch to test compatibility with channel 20
Amount:
$6,400.00
Transmitter Room Modification

Component Description:
WLWT AC equipment removal
Amount:
$5,940.00

Component Description:
WLWT transmitter building mods 2
Amount:
$1,944.00

Component Description:
WLWT transmitter building mods 3 rev
Amount:
$7,620.11

Component Description:
WLWT scissor lift rental
Amount:
$559.99

Component Description:
WLWT transmitter building mods
Amount:
$10,163.13

Component Description:
WLWT fencing for transmitter heat exchangers
Amount:
$9,420.00
RF System Modifications

Component Description:
WLWT RF reconfiguration parts shipping 1
Amount:
$760.39

Component Description:
WLWT RF reconfiguration parts 1
Amount:
$13,044.11

Component Description:
WLWT waveguide switch rev
Amount:
$16,674.68

Component Description:
WLWT waveguide switch bracket shipping rev
Amount:
$470.65

Component Description:
WLWT RF switch cable
Amount:
$163.10
Transmitter installation incidentals

Component Description:
WLWT transmitter installation incidentals 1
Amount:
$421.62

Component Description:
WLWT transmitter installation incidentals 2
Amount:
$2,832.26

Component Description:
WLWT transmitter installation incidentals 4
Amount:
$184.91

Component Description:
WLWT forklift rental for transmitter installation
Amount:
$874.58

Component Description:
WLWT scissorlift rental for transmitter installation
Amount:
$466.65

Component Description:
WLWT transmitter installation incidentals 3
Amount:
$675.45
Other Electrical Service: transmitter installation electrical service. See attached Bertke Electric quote.

Component Description:
WLWT transmitter electrical installation 1
Amount:
$48,110.50

Component Description:
WLWT transmitter electrical installation 2
Amount:
$48,110.50
Transformer 3 phase/480v - 300 KVA

Component Description:
WLWT transmitter electrical transformers
Amount:
$16,867.80
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW

Component Description:
WLWT GatesAir transmitter 1/3 prior to ship
Amount:
$433,669.74

Component Description:
WLWT transmitter installation
Amount:
$95,565.15

Component Description:
Transmitter 1st deposit
Amount:
$138,687.85

Component Description:
WLWT transmitter delivery payment
Amount:
$260,556.40

Component Description:
Transmitter 2nd deposit
Amount:
$264,187.87

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $482,166.40 $587,180.40 N/A $587,180.40 N/A
Total for all systems $4,495,197.27 $3,609,774.09 N/A $3,609,607.05 N/A
Interim Antenna TFU-16WB $168,444.92 $149,464.92 $149,464.92
Shipping $5,552.81 $5,552.81 shipping per attached Dielectric invoice $5,552.81 N/A
Sales Tax $9,245.51 $9,245.51 interim antenna sales tax $9,245.51 N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $4,500.00 N/A $4,500.00 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $6,400.00 N/A
UHF - High Power, Side Mount, basic slot antenna, 16 bay,, 500 kW input, directional,, horizontally polarized $123,766.60 $123,766.60 per invoices $123,766.60 Progress payments - not itemized
Primary Antenna TFU-26GBH-R 06 $313,721.48 $437,715.48 $437,715.48
Antenna accessories $13,444.93 $13,444.93 RF components need for antenna installation per Dielectric invoices $13,444.93 N/A
Sales Tax $24,633.55 $24,633.55 main antenna sales tax $24,633.55 N/A
Shipping $9,613.00 $9,613.00 shipping per attached Dielectric quote $9,613.00 N/A
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) $12,300.00 $10,984.00 N/A $10,984.00 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $6,400.00 N/A
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized $247,000.00 $372,640.00 bottom of antenna stack price per attached Dielectric quote $372,640.00 N/A

Components

Actual Information Description File Name
Shipping

Component Description:
WLWT interim antenna shipping to site
Amount:
$3,680.00

Component Description:
WLWT interim antenna custom TL shipping rev2
Amount:
$820.73

Component Description:
WLWT interim antenna custom line section shipping rev
Amount:
$1,052.08
Sales Tax

Component Description:
WLWT interim antenna sales tax
Amount:
$9,245.51
Side mount brackets for high power antennas (if not included in antenna base cost)

Component Description:
WLWT side mount bracket redesign
Amount:
$4,500.00
Sweep test of existing antenna

Component Description:
WLWT interim antenna sweep rev2
Amount:
$6,400.00
UHF - High Power, Side Mount, basic slot antenna, 16 bay,, 500 kW input, directional,, horizontally polarized

Component Description:
WLWT interim antenna payment 3
Amount:
$1,573.33

Component Description:
Dielectric WLWT Interim Antenna 45% progress payment (10% down and 35% with order equals). Supporting documentation included.
Amount:
$59,720.40

Component Description:
WLWT Dielectric interim antenna payment 2 - 45% prior to ship. Supporting documentation included.
Amount:
$62,472.87
Antenna accessories

Component Description:
WLWT custom length transmission line 2 rev
Amount:
$910.00

Component Description:
WLWT custom TL shipping 2 rev2
Amount:
$425.40

Component Description:
WLWT custom TL shipping rev2
Amount:
$403.39

Component Description:
WLWT custom length transmission line rev
Amount:
$1,820.00

Component Description:
WLWT cable for Antenna Obstruction Light
Amount:
$664.13

Component Description:
WLWT test transition
Amount:
$2,420.00

Component Description:
WLWT main antenna additional parts and shipping
Amount:
$6,802.01
Sales Tax

Component Description:
WLWT main antenna sales tax
Amount:
$24,633.55
Shipping

Component Description:
WLWT main antenna shipping rev2
Amount:
$9,613.00
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed)

Component Description:
WLWT main antenna elbow complex
Amount:
$10,984.00
Sweep test of existing antenna

Component Description:
WLWT main antenna sweep
Amount:
$6,400.00
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized

Component Description:
WLWT main antenna payment 3 rev
Amount:
$9,021.10

Component Description:
WLWT main antenna payment 45% prior to ship
Amount:
$181,809.45

Component Description:
Dielectric WLWT Main Antenna and Elbow complex; 9.13.2017; $181,809.45; progress payments 10% & 35%
Amount:
$181,809.45

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $256,765.31 $256,127.97 N/A $256,127.97 N/A
Total for all systems $4,495,197.27 $3,609,774.09 N/A $3,609,607.05 N/A
Interim Transmission Line $238,990.79 $238,353.45 $238,353.45
Additional TL Components $85,602.51 $85,602.51 additional transmission line components needed to complete installation $85,602.51 N/A
Sales Tax $14,188.28 $14,188.28 transmission line sales tax $14,188.28 N/A
Rigid Transmission Line - copper, 6 1/8" broadband $139,200.00 $138,562.66 transmission line price per attached Dielectric quote $138,562.66 N/A
Primary Transmission Line $17,774.52 $17,774.52 $17,774.52
Elbows $855.18 $855.18 see Dielectric invoice $855.18 N/A
Refurbish Line $14,161.00 $14,161.00 transmission line parts $14,161.00 N/A
Line sweep $2,758.34 $2,758.34 see associated invoice $2,758.34 N/A

Components

Actual Information Description File Name
Additional TL Components

Component Description:
WLWT additional interim transmission line parts shipping 5
Amount:
$2,141.10

Component Description:
WLWT additional interim transmission line parts
Amount:
$34,264.09

Component Description:
WLWT additional interim transmission line parts shipping
Amount:
$997.85

Component Description:
WLWT interim transmission line hangers
Amount:
$684.60

Component Description:
WLWT additional interim transmission line parts shipping 2
Amount:
$550.75

Component Description:
WLWT additional interim transmission line parts 3
Amount:
$1,447.50

Component Description:
WLWT additional interim transmission line parts 2
Amount:
$27,469.50

Component Description:
WLWT additional interim transmission line parts shipping 4
Amount:
$344.26

Component Description:
WLWT additional interim transmission line parts shipping 3
Amount:
$370.86

Component Description:
WLWT additional interim transmission line parts 4
Amount:
$1,302.00

Component Description:
WLWT interim transmission line custom elbows
Amount:
$16,030.00
Sales Tax

Component Description:
WLWT interim transmission line sales tax
Amount:
$14,188.28
Rigid Transmission Line - copper, 6 1/8" broadband

Component Description:
WLWT interim transmission line payment 3
Amount:
$13,788.30

Component Description:
WLWT Dielectric interim transmission line payment 2 - 45% prior to ship
Amount:
$62,047.35

Component Description:
WLWT transmission line cut pieces shipping
Amount:
$679.66

Component Description:
Dielectric WLWT Interim Transmission line payments 10% down & 35% with order equals 45% of invoice line item 2
Amount:
$62,047.35
Elbows

Component Description:
WLWT main transmission line elbows shipping
Amount:
$855.18
Refurbish Line

Component Description:
Credit for transmission line refurbishing
Amount:
($25,864.00)

Component Description:
WLWT main transmission line refurb parts 2
Amount:
$19,582.50

Component Description:
WLWT main transmission line refurbish parts
Amount:
$14,161.00

Component Description:
WLWT main transmission line refurbish 1
Amount:
$25,864.00

Component Description:
WLWT shipping main transmission line refurb parts 2
Amount:
$2,095.00
Line sweep

Component Description:
WLWT main transmission line sweep
Amount:
$2,758.34

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,517,980.97 $975,166.29 N/A $975,166.29 N/A
Total for all systems $4,495,197.27 $3,609,774.09 N/A $3,609,607.05 N/A
Primary Tower LTOWER $1,517,980.97 $975,166.29 $975,166.29
Structural engineering tower load study for well documented tower $12,600.00 $9,820.00 Quote TCI-16-104 - WLWT - Cincinnati OH - Analysis.pdf $9,820.00 N/A
Power line relocation $2,458.54 $2,458.54 see Duke Energy invoice $2,458.54 N/A
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $272,612.00 N/A $272,612.00 N/A
Land clearing $24,170.00 $24,170.00 Clearing trees/brush and moving fences required for tower modifications $24,170.00 N/A
Tower Consulting $5,752.43 $5,752.43 tower consulting $5,752.43 N/A
Serious tower reinforcement/modifications $1,052,000.00 $660,353.32 N/A $660,353.32 -

Components

Actual Information Description File Name
Structural engineering tower load study for well documented tower

Component Description:
WLWT tower feasibility structural analysis
Amount:
$9,820.00
Power line relocation

Component Description:
WLWT power line relocation
Amount:
$2,458.54
Complex Tower (includes, for example, those with candelabras and/or stacked antennas)

Component Description:
WLWT antenna services phase 2 mobilization
Amount:
$29,644.00

Component Description:
WLWT antenna services phase 2 completion
Amount:
$45,069.00

Component Description:
WLWT phase 1 antenna services completion
Amount:
$7,560.00

Component Description:
WLWT Tower Repack Antenna Services -main antenna installation 50% down payment per quote
Amount:
$75,115.00

Component Description:
WLWT interim antenna 20% progress payment
Amount:
$30,046.00

Component Description:
WLWT antenna services phase 2 change order rev
Amount:
$43,178.00

Component Description:
WLWT Antenna Services - interim antenna and line installation 50% down payment.
Amount:
$42,000.00
Land clearing

Component Description:
WLWT tree and brush removal 2
Amount:
$5,000.00

Component Description:
WLWT fence work 2
Amount:
$9,550.00

Component Description:
WLWT tree and brush removal
Amount:
$2,920.00

Component Description:
WLWT fence work 3
Amount:
$3,450.00

Component Description:
WLWT fence work 1
Amount:
$3,250.00
Tower Consulting

Component Description:
WLWT consultant for on-site tower meeting
Amount:
$1,489.43

Component Description:
WLWT Kube tower consulting
Amount:
$75.00

Component Description:
WLWT tower consulting invoice 1
Amount:
$4,038.00

Component Description:
WLWT tower consulting invoice 2
Amount:
$150.00
Serious tower reinforcement/modifications

Component Description:
WLWT tower mods 20% mobilization less non-reimbursable items
Amount:
$125,170.00

Component Description:
WLWT tower mods completion
Amount:
$48,766.50

Component Description:
Deposit for tower modifications per TCI MOU 8-28-17 TCI.PDF
Amount:
$44,800.00

Component Description:
WLWT partial completion payment less non-reimbursable items
Amount:
$131,428.50

Component Description:
WLWT tower modifications 50% initial payment less MOU deposit
Amount:
$226,125.00

Component Description:
WLWT tower mod change order 1 revision 3
Amount:
$84,063.32

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $206,312.22 $67,962.85 N/A $67,795.81 N/A
Total for all systems $4,495,197.27 $3,609,774.09 N/A $3,609,607.05 N/A
Outside Professional Services $206,312.22 $67,962.85 $67,795.81
Consulting-Project Management $22,000.00 $22,000.00 N/A $22,000.00 N/A
Non-catalog Legal Expenses $14,132.22 $14,132.22 Non-Catalog expenses for legal advice and services, including financial/reimbursement review, transition reporting, transition procedures, and other transition-related issues. $14,132.22 N/A
Transmitter Site Survey Sales Tax $0.00 $0.00 ***System Notice: Estimate adjusted and locked because line has been superseded.***Ohio sales tax for Transmitter Site Survey (aka Field Service, TV) $0.00 N/A
Transmitter Site Survey $20,600.00 $20,600.00 Transmitter planning survey & transmitter building drawings attached quote does not include $1,442.00 sales tax added to invoice. $20,600.00 N/A
Security $0.00 $0.00 based on attached transmitter security proposal for 90 days. N/A N/A
RF Exposure Measurements $21,050.00 $0.00 N/A N/A N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $0.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $11,040.00 $2,441.60 N/A $2,441.60 N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $105.00 N/A $105.00 N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $1,846.53 N/A $1,846.53 N/A
Prepare request for Special Temporary Authorization $4,100.00 $0.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $250.00 N/A $250.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $2,525.00 N/A $2,525.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $2,062.50 N/A $2,062.50 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $0.00 N/A N/A N/A
Prepare and or review reimbursement form $2,630.00 $2,000.00 N/A $1,832.96 N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $0.00 N/A N/A N/A

Components

Actual Information Description File Name
Consulting-Project Management

Component Description:
WLWT Stitt consulting 1
Amount:
$5,000.00

Component Description:
WLWT Stitt consulting 5
Amount:
$3,000.00

Component Description:
WLWT Stitt consulting 2
Amount:
$2,000.00

Component Description:
WLWT Stitt consulting 4
Amount:
$9,000.00

Component Description:
WLWT Stitt consulting 3
Amount:
$3,000.00
Non-catalog Legal Expenses

Component Description:
WLWT non-catalog legal 4
Amount:
$3,738.60

Component Description:
WLWT non-catalog legal 5
Amount:
$1,501.20

Component Description:
WLWT non-catalog legal 3
Amount:
$1,591.00

Component Description:
WLWT non-catalog legal 2
Amount:
$3,690.02

Component Description:
WLWT non-catalog legal 1
Amount:
$2,709.40

Component Description:
WLWT non-catalog legal 6
Amount:
$219.50

Component Description:
WLWT non-catalog legal 7
Amount:
$682.50
Transmitter Site Survey Sales Tax

Component Description:
Ohio sales tax for Transmitter Site Survey (aka Field Service, TV)
Amount:
$1,442.00
Transmitter Site Survey

Component Description:
WLWT Field Service, GatesAir, 6-30-2017 $20,600
Amount:
$20,600.00
Security Information not provided.
RF Exposure Measurements Information not provided.
Comprehensive coverage verification via field study, if needed Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization

Component Description:
WLWT Prepare and File request for Special Temporary Authorization 3
Amount:
$552.80

Component Description:
WLWT Prepare and File request for Special Temporary Authorization 2
Amount:
$884.60

Component Description:
WLWT Prepare and File request for Special Temporary Authorization
Amount:
$1,004.20
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application

Component Description:
WLWT Prepare and file FCC Form 2100 (main) License to Cover Application
Amount:
$105.00
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
WLWT Prepare and File FCC Form 2100, Construction Permit Application
Amount:
$792.00

Component Description:
WLWT Prepare and File FCC Form 2100, Construction Permit Application 2
Amount:
$1,054.53
Prepare request for Special Temporary Authorization Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application

Component Description:
WLWT RF consulting for license to cover
Amount:
$250.00
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
WLWT CP engineering mod
Amount:
$700.00

Component Description:
WLWT CP engineering prep
Amount:
$1,825.00
Perform engineering study for new channel assignment and antenna development

Component Description:
WLWT engineering study for new channel assignment
Amount:
$562.50

Component Description:
WLWT antenna development
Amount:
$625.00

Component Description:
WLWT RF consulting for interim antenna development
Amount:
$875.00
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Prepare and or review reimbursement form

Component Description:
WLWT Prepare and/or review reimbursement Form 399 3
Amount:
$47.00

Component Description:
WLWT Prepare and/or review reimbursement Form 399 4
Amount:
$141.00

Component Description:
WLWT Prepare and/or review reimbursement Form 399
Amount:
$1,082.40

Component Description:
WLWT Prepare and/or review reimbursement Form 399 5
Amount:
$105.00

Component Description:
WLWT Prepare and/or review reimbursement Form 399 2
Amount:
$300.06

Component Description:
WLWT Prepare and/or review reimbursement Form 399 6
Amount:
$157.50
Attorney Fees - Negotiation of lease and other matters for shared locations Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $130,786.76 $122,416.16 N/A $122,416.16 N/A
Total for all systems $4,495,197.27 $3,609,774.09 N/A $3,609,607.05 N/A
Other Expenses $130,786.76 $122,416.16 $122,416.16
Tower site restoraton $42,370.00 $42,370.00 repair damage to tower site due to heavy equipment used for tower modifications and antenna installations and replacements $42,370.00 N/A
in-house labor $17,008.21 $17,008.21 per attached documentation $17,008.21 N/A
Contract Labor $4,209.46 $4,209.46 accounting labor directly related to the Spectrum Repack project $4,209.46 N/A
MVPD Notification of Channel Change $2,842.40 $2,842.40 MVPD notification $2,842.40 N/A
Develop and air announcement of upcoming channel change $0.00 $0.00 Attorney review to ensure FCC compliance N/A N/A
Equipment Storage $46,087.00 $46,087.00 per relevant invoices $46,087.00 N/A
Equipment Delivery and Handling Charges $4,990.00 $4,990.00 Transmitter local delivery per invoices $4,990.00 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $89.69 $89.69 per invoice $89.69 N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $590.00 per FCC receipts $590.00 N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $335.00 N/A $335.00 N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $0.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $3,894.40 quote attached $3,894.40 N/A

Components

Actual Information Description File Name
Tower site restoraton

Component Description:
WLWT transmitter site pavement restoration
Amount:
$24,180.00

Component Description:
WLWT tower site restoration 2
Amount:
$12,127.00

Component Description:
WLWT tower site restoration 1
Amount:
$6,063.00
in-house labor

Component Description:
WLWT in-house labor 3
Amount:
$3,626.38

Component Description:
WLWT in-house labor 4
Amount:
$4,195.16

Component Description:
WLWT in-house accounting labor 1
Amount:
$5,709.60

Component Description:
WLWT in-house labor 2
Amount:
$3,477.07
Contract Labor

Component Description:
WLWT accounting labor
Amount:
$4,209.46
MVPD Notification of Channel Change

Component Description:
WLWT MVPD notification
Amount:
$2,842.40
Develop and air announcement of upcoming channel change Information not provided.
Equipment Storage

Component Description:
WLWT transmitter storage 3
Amount:
$400.00

Component Description:
WLWT transmitter storage 2
Amount:
$400.00

Component Description:
WLWT main antenna storage rev2
Amount:
$28,450.00

Component Description:
WLWT transmitter storage 1
Amount:
$6,077.00

Component Description:
WLWT interim antenna ship to storage
Amount:
$7,360.00

Component Description:
WLWT interim antenna storage
Amount:
$3,400.00
Equipment Delivery and Handling Charges

Component Description:
WLWT local transmitter delivery 2
Amount:
$2,495.00

Component Description:
WLWT local transmitter delivery 1
Amount:
$2,495.00
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
WLWT waste container delivery
Amount:
$89.69
FCC Filing Fees - Special Temporary Authorization request

Component Description:
WLWT Engineering STA Extension Application fee 1
Amount:
$200.00

Component Description:
WLWT Engineering STA Extension Application fee 2
Amount:
$200.00

Component Description:
WLWT Engineering STA Application fee
Amount:
$190.00
FCC Filing Fees - Form 2100 license to cover application

Component Description:
WLWT main antenna License To Cover Application fee
Amount:
$335.00
FCC Filing Fees - Form 2100 minor change CP application Information not provided.
DTV Medical Facility Notification

Component Description:
WLWT medical notification
Amount:
$3,894.40

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $4,495,197.27 $3,609,774.09 $3,609,607.05

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. Yes
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

John Drain

Hearst Television SVP Chief Financial Officer


04/22/2021

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Douglas Durkee

Hearst Television Manager of Spectrum Repack


04/22/2021

Certification

Back to Top
Section Question Response
Submission of Final Allocation or Accounting Information Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  2. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  3. The above-named entity certifies that all costs identified as "actual costs" herein accurately represent the costs actually paid by the above-named entity, including any discounts, refunds, or rebates.

  4. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  5. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  6. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Douglas Durkee

Hearst Television Manager of Spectrum Repack


04/22/2021

Attachments

Back to Top