Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
WXTV LICENSE PARTNERSHIP, G.P. Doing Business As: WXTV LICENSE PARTNERSHIP, G.P. |
Christopher G. Wood 5999 CENTER DRIVE LOS ANGELES, CA 90045 United States |
+1 (310) 348-3600 | CWOOD@UNIVISION.NET | General Partnership |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Theodore Stoner VP Distribution Technology Strategy Univision Management Company |
Theodore Stoner 9405 NW 41st Street Miami, FL 33178 United States |
+1 (513) 608-0308 | tstoner@univision.net |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Install new antenna, mask filter, and switching components; use existing transmission line and transmitter; sweep/tune/test line & antenna; conduct proof of performance measurements on transmitter. See attached Implementation Plan for details. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Retune Existing |
Use | Primary (Main) | |
Ownership | Owned | |
Owner | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | Gatesair |
Model | UAXT-1AT | |
Year | 2015 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.1 kW |
Section | Question | Response |
---|---|---|
New IOT Tubes | Number of Tubes (including accessories) needed | N/A |
New Mask Filter | ||
Power | 3 kW | |
Other Power | N/A | |
New Exciter | Is a new exciter needed? | No |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Class A |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Other | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | Single Channel Panel | |
ERP: | 5.8 kW | |
Manufacturer | ||
Model | 4DR-16-2HW | |
Year | 2015 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Class A |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Other | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | Single Channel Panel | |
ERP: | 6.6 kW | |
Manufacturer | ||
Model | 4DR-4S | |
Year | 2018 | |
Justification for New Antenna | Existing antenna panels are channel-specific and not usable on new channel. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | Candelabra | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1231524 | |
Coordinates (NAD83) | Latitude (NAD83) | 40° 02' 30.1" N- |
Longitude (NAD83) | 075° 14' 10.1" W- | |
Overall Structure Height | 1254.91 feet | |
Support Structure Height | 1124.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 292.98 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | Global Tower, LLC. through American Towers, LLC | |
Date Constructed | 11/02/2011 |
Facility ID | Call Sign | Service |
---|---|---|
55305 | WTVE | DTV |
51434 | WTDY-FM | FM |
9622 | WOGL | FM |
63153 | WCAU | DTV |
60560 | WUVP-DT | DTV |
65190 | WRTI | FM |
12211 | WPPZ-FM | FM |
72278 | WPHA-CD | DTV |
51984 | WPPX-TV | DTV |
12499 | WPSG | DTV |
7623 | WGTW-TV | DTV |
1283 | WDPN-TV | DTV |
28480 | WPPT | DTV |
74213 | WXTU | FM |
30572 | WPHI-FM | FM |
28628 | WIP-FM | FM |
Users |
---|
WZPA-LD |
WDUM-LD |
W36DO-D |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for tower with candelabra |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Candelabra |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Tower Permit Drawing Package |
The generation of a tower construction drawing package for one (1) broadcasters/customers. |
Ground and Building Drawing Package |
The generation of a civil construction drawing package for one (1) broadcasters/customers. |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 755 | |
Explanation | Univision stations are only staffed for daily station operations and minor equipment changes, major projects are contracted out externally. The large volume of work associated with repack schedule requires using external project management resources. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
ATC Site Coordination Meeting |
ATC Site Coordination Meetings per WFPA Cost Repack Breakdown |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | Yes |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | No |
Name | Description |
---|---|
Site Project Management |
ATC fee for site coordination, management, and lease administration |
Tower Project Management |
ATC tower reconfiguration project management fee |
Internal Labor |
Internal Univision Labor directly associated with Repack |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $109,355.00 | $24,680.34 | N/A | $19,732.14 | N/A |
Total for all systems | $999,603.10 | $626,069.80 | N/A | $515,845.33 | N/A |
Primary Transmitter UAXT-1AT | $109,355.00 | $24,680.34 | $19,732.14 | ||
3 kW mask filter | $4,155.00 | $19,750.00 | Per R&S Quote 117282.2 | $19,732.14 | N/A |
UHF and VHF - minor banding issues | $105,200.00 | $4,930.34 | Please see WFPA-CD UHF and VHF - minor banding issues Revision Justification Cover Letter | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
3 kW mask filter | |
UHF and VHF - minor banding issues |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $33,030.00 | $18,720.00 | N/A | $12,292.64 | N/A |
Total for all systems | $999,603.10 | $626,069.80 | N/A | $515,845.33 | N/A |
Primary Antenna 4DR-4S | $33,030.00 | $18,720.00 | $12,292.64 | ||
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
UHF - Lower Power Side Mount, Class A One Station antenna -- basic | $26,300.00 | $12,320.00 | Please see WFPA antenna quote 001Q29263 and Antenna Clarification, plus freight charges on invoice | $12,292.64 | N/A |
Actual Information Description | File Name |
---|---|
Sweep test of existing antenna | Information not provided. |
UHF - Lower Power Side Mount, Class A One Station antenna -- basic |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $608,400.00 | $324,461.36 | N/A | $256,400.00 | N/A |
Total for all systems | $999,603.10 | $626,069.80 | N/A | $515,845.33 | N/A |
Primary Tower GTOWER | $608,400.00 | $324,461.36 | $256,400.00 | ||
Structural engineering tower load study for a documented tower with candelabra | $20,000.00 | $15,261.36 | see Estimated Cost Justification WFPA-CD-410-Existing Primary Tower - Structural Engineering Tower Load Study v0 | $14,600.00 | N/A |
Tower Permit Drawing Package | $4,700.00 | $4,700.00 | See line 167 of attached American Tower cost estimate. | N/A | N/A |
Ground and Building Drawing Package | $4,700.00 | $4,700.00 | See line 168 of attached American Tower cost estimate. | N/A | N/A |
Minor tower reinforcement/modifications | $158,000.00 | $50,000.00 | N/A | N/A | N/A |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $249,800.00 | Vertical Technology Services, LLC. Quote #18241-PA-REV-1 | $241,800.00 | N/A |
Actual Information Description | File Name |
---|---|
Structural engineering tower load study for a documented tower with candelabra | |
Tower Permit Drawing Package | Information not provided. |
Ground and Building Drawing Package | Information not provided. |
Minor tower reinforcement/modifications | Information not provided. |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $150,980.00 | $170,350.00 | N/A | $154,972.29 | N/A |
Total for all systems | $999,603.10 | $626,069.80 | N/A | $515,845.33 | N/A |
Outside Professional Services | $150,980.00 | $170,350.00 | $154,972.29 | ||
ATC Site Coordination Meeting | $2,500.00 | $2,500.00 | Please see attached WFPA Cost Breakdown and ATC Invoice 460211202 | $2,500.00 | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $2,000.00 | N/A | $1,418.85 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | $35.55 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $2,500.00 | N/A | N/A | N/A |
Project management of the transition | $119,290.00 | $144,600.00 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $144,566.64 | Invoices submitted |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $2,000.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $1,625.00 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $326.25 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | American tower tenant coordination fees; see line 175 of attached ATC cost estimate | $2,500.00 | N/A |
Actual Information Description | File Name |
---|---|
ATC Site Coordination Meeting | |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Project management of the transition | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Prepare and or review reimbursement form | |
Address transition timing and coordination issues w/ other stations and wireless |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $97,838.10 | $87,858.10 | N/A | $72,448.26 | N/A |
Total for all systems | $999,603.10 | $626,069.80 | N/A | $515,845.33 | N/A |
Other Expenses | $97,838.10 | $87,858.10 | $72,448.26 | ||
Develop and air announcement of upcoming channel change | $71.10 | $71.10 | Please see WFPA-CD Channel Change Announcement Budget Revision Justification Letter | $71.10 | N/A |
Tower Project Management | $5,000.00 | $5,000.00 | See attached ATC site cost estimate spreadsheet, line 170 | N/A | N/A |
Site Project Management | $9,480.00 | $9,480.00 | See attached ATC site cost estimate spreadsheet | $9,480.00 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $16,485.00 | $16,485.00 | Please see attached Magness Demolition Proposal Rev 1 | $16,485.00 | N/A |
Local Zoning | $667.00 | $667.00 | See line 222 of attached American Tower cost estimate. | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | $335.00 | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,070.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $2,000.00 | N/A | $2,000.00 | N/A |
AM Pattern Disturbance -- Impact study | $7,890.00 | $7,500.00 | N/A | N/A | N/A |
Internal Labor | $44,500.00 | $44,500.00 | N/A | $44,077.16 | N/A |
Non-zoning permits | $750.00 | $750.00 | See line 202 of attached American Tower cost estimate. | N/A | N/A |
Actual Information Description | File Name |
---|---|
Develop and air announcement of upcoming channel change | |
Tower Project Management | Information not provided. |
Site Project Management | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
Local Zoning | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
DTV Medical Facility Notification | |
AM Pattern Disturbance -- Impact study | Information not provided. |
Internal Labor | |
Non-zoning permits | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $999,603.10 | $626,069.80 | $515,845.33 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jose Franchi , Franchi . VP Finance 06/15/2021 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jose Franchi , Franchi . VP Finance 06/15/2021 |