FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
28280
Service:
DCA
Call Sign:
KTFV-CD
Channel:
32 (UHF)
File Number:
0000028370
FRN:
0001529627
Date Submitted:
06/21/2021

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

ENTRAVISION HOLDINGS, LLC

Mark Boelke

Suite 6000 West

2425 Olympic Boulevard

Santa Monica, CA 90404

United States

+1 (310) 447-3896 mboelke@entravision.com Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Samuel Hariton

Widelity

4031 University Dr

Suite 100

Fairfax, VA 22030

United States

+1 (339) 222-8107 sam.hariton@widelity.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan The plan is for KTFV-CD is to replace the existing Channel 48 system with a new Channel 32 antenna, new 1-5/8" line, and a new transmitter.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model CZ500
Year 2001
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 0.5 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model UAXTE-6R-37
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 3.6 kW
Justification for New Transmitter New transmitter is necessary because the existing transmitter is not capable of being retuned to channel 32. (see letter from Manufacturer)

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Leased
Owner KNVO
Site N/A
Is the existing antenna shared with another station or stations? Yes
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 12.0 kW
Manufacturer
Model ATW30H5
Year 2001

Facility ID's and Call Signs of all stations with whom the antenna is shared.

Facility ID Call Sign
69692 KNVO

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Class A
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 15.0 kW
Manufacturer
Model TLP-BB-12A/VP-R
Year 2018
Justification for New Antenna A new antenna is necessary because the existing antenna cannot be retuned to the new channel and is not capable of broadcasting on channel 32. The new antenna will not be shared because KVNO and KTFV-CD channels are now too far apart.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Leased
Owner KNVO
Site N/A
Is the existing transmission line shared with another station or stations? Yes
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Waveguide
Diameter N/A
Other Diameter N/A
Segment Length N/A
Other Segment Length N/A
Number of parallel runs 1
Length 1131 feet per run

Facility ID's and Call Signs of all stations with whom the transmission line is shared.

Facility ID Call Sign
69692 KNVO

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Flexible Air
Diameter Other
Other Diameter 3 1/8 inches
Segment Length N/A
Other Segment Length N/A
Number of parallel runs 1
Length 1100 feet per run
Justification for New Transmission Line KTFV's previous waveguide is not capable of operating on the new channel. A new transmission line will need to be installed in order to support the new channel.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? No
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1051020
Coordinates (NAD83) Latitude (NAD83) 26° 05' 19.0" N-
Longitude (NAD83) 098° 03' 45.0" W-
Overall Structure Height 971.12 feet
Support Structure Height 971.12 feet
Ground Elevation Above Mean Sea Level (AMSL) 77.10 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner Entravision - Texas Limited Partnership
Date Constructed 01/01/1997

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
69692 KNVO DTV
67188 KVLY FM

Other Types of Users

Users
Federal Border
49038 KFXV
VTX Communicati

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for undocumented/poorly documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Major Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Information not provided.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 712
Explanation KTFV-CD does not have sufficient resource capacity and expertise in house to handle all of the reimbursement filing by the construction deadline of Phase 8 of March 13, 2020. KTFV-CD will hire an outside firm to ensure a timely and well managed transition
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority No
Quantity N/A
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority No
Quantity N/A
NEPA Section 106 environmental review No
Environmental Assessment Yes
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Structural Analysis

Tower Structural Analysis

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning Yes
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? No
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $155,819.90 $94,498.57 N/A $94,278.66 N/A
Total for all systems $1,082,245.27 $938,163.94 N/A $411,955.16 N/A
Primary Transmitter UAXTE-6R-37 $155,819.90 $94,498.57 $94,278.66
UHF - Air Cooled Solid State Transmitter 2.89 kW $219.90 $219.90 ***System Notice: Estimate adjusted and locked because line has been superseded.***Please see the attached Gates Air quote Q-75932, Invoices USO318607, USO320594 and JW30004367-1 $219.90 N/A
UHF - Air Cooled Solid State Transmitter 2.501 - 3.999 kW $155,600.00 $94,278.67 Please see attached Gates Air Quotes Q-74104 (Upgrade) and Q-75932 (Like-for-like) $94,058.76 x

Components

Actual Information Description File Name
UHF - Air Cooled Solid State Transmitter 2.89 kW

Component Description:
Please deny this invoice.
Amount:
N/A

Component Description:
Please deny this invoice.
Amount:
N/A

Component Description:
Freight, Assy, 10FT Flex 7/8 W/7/16 M
Amount:
$219.90
UHF - Air Cooled Solid State Transmitter 2.501 - 3.999 kW

Component Description:
Transmitter
Amount:
$46,488.27

Component Description:
Transmitter
Amount:
$47,570.49

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $33,030.00 $30,871.00 N/A $13,565.77 N/A
Total for all systems $1,082,245.27 $938,163.94 N/A $411,955.16 N/A
Primary Antenna TLP-BB-12A/VP-R $33,030.00 $30,871.00 $13,565.77
Sweep test of existing antenna $6,730.00 $6,500.00 Chuck Britt and Associates Quote N/A N/A
UHF - Lower Power Side Mount, Class A One Station antenna -- basic $26,300.00 $24,371.00 Dielectric - TLP-BB-12A/VP-R $13,565.77 N/A

Components

Actual Information Description File Name
Sweep test of existing antenna Information not provided.
UHF - Lower Power Side Mount, Class A One Station antenna -- basic

Component Description:
UHF-Low-Medium- Power Side Mount
Amount:
$5,671.57

Component Description:
UHF-Low-Medium Power Side Mount
Amount:
$5,671.57

Component Description:
UHF - Low - Medium Power Side Mount
Amount:
$1,260.35

Component Description:
FLEXLINE RMA6 31670-6 10PK, RFREIGHT
Amount:
$79.32

Component Description:
FREIGHT, SHIPPING, AND HANDLING PAF
Amount:
$882.96

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $24,551.45 $24,551.45 N/A $24,551.45 N/A
Total for all systems $1,082,245.27 $938,163.94 N/A $411,955.16 N/A
Primary Transmission Line $24,551.45 $24,551.45 $24,551.45
Flexible Air Transmission Line - 3 1/8" 1 parallel runs 1100 feet $24,551.45 $24,551.45 KTFV will incur only on half of the cost of this new transmission line since it will be shared with KCWT. Dielectric Quote 51316JKT Rev 5 and Dielectric invoices 242041 & 248013. $24,551.45 N/A

Components

Actual Information Description File Name
Flexible Air Transmission Line - 3 1/8" 1 parallel runs 1100 feet

Component Description:
New Transmission Line
Amount:
$10,264.46

Component Description:
New Transmission Line
Amount:
$143.56

Component Description:
New Transmission Line
Amount:
$10,264.46

Component Description:
KTFV-310-New Transmission Line
Amount:
$2,280.99

Component Description:
KTFV-310-New Transmission Line
Amount:
$1,597.98

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $657,800.00 $585,210.00 N/A $166,176.98 N/A
Total for all systems $1,082,245.27 $938,163.94 N/A $411,955.16 N/A
Primary Tower TOWER $657,800.00 $585,210.00 $166,176.98
Major tower reinforcement/modifications $421,000.00 $400,000.00 N/A N/A N/A
Tall Tower (greater than 500') $210,500.00 $160,210.00 Per invoice 20081996, which includes $12,210.00 in sales tax that was mentioned but not enumerated in the proposal #061917JS6 $160,210.00 N/A
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study $26,300.00 $25,000.00 N/A $5,966.98 N/A

Components

Actual Information Description File Name
Major tower reinforcement/modifications Information not provided.
Tall Tower (greater than 500')

Component Description:
Mobilization to site. Rig as necessary to get antenna in place. Install new transmission line per manufacturer's specs.
Amount:
$160,210.00
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study

Component Description:
Tower mapping and prep of the docs necessary for tower load study
Amount:
$2,999.06

Component Description:
Broadcast tower structural analysis
Amount:
$2,967.92

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $150,963.92 $143,517.92 N/A $110,704.80 N/A
Total for all systems $1,082,245.27 $938,163.94 N/A $411,955.16 N/A
Outside Professional Services $150,963.92 $143,517.92 $110,704.80
Project management of the transition $112,496.00 $106,800.00 N/A $104,929.80 N/A
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet $10,520.00 $10,000.00 N/A $0.00 N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A N/A N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $3,400.00 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $2,375.00 N/A
Structural Analysis $2,967.92 $2,967.92 Broadcast Tower Structural Analysis - KTFV-CD N/A N/A

Components

Actual Information Description File Name
Project management of the transition

Component Description:
Project Management
Amount:
$3,789.15

Component Description:
Project Management
Amount:
$193.75

Component Description:
Project Management
Amount:
$38.75

Component Description:
Project Management
Amount:
$2,448.85

Component Description:
Project Management
Amount:
$2,400.95

Component Description:
Project Management
Amount:
$2,158.40

Component Description:
Project Management
Amount:
$1,803.00

Component Description:
Project Management
Amount:
$2,753.20

Component Description:
Project management
Amount:
$151.95

Component Description:
Project Management
Amount:
$2,287.00

Component Description:
Project Management
Amount:
$3,345.15

Component Description:
Project Management
Amount:
$732.50

Component Description:
Project Management
Amount:
$3,465.40

Component Description:
Project Management
Amount:
$1,814.10

Component Description:
Project management
Amount:
$2,935.35

Component Description:
Project Management
Amount:
$2,531.80

Component Description:
Project Management
Amount:
$2,158.90

Component Description:
Project Management
Amount:
$3,785.45

Component Description:
Project Management
Amount:
$3,124.15

Component Description:
Project Management
Amount:
$2,921.25

Component Description:
Project Management
Amount:
$3,111.60

Component Description:
Project Management
Amount:
$1,482.10

Component Description:
Project management
Amount:
$2,076.20

Component Description:
Project Management
Amount:
$2,604.35

Component Description:
Project Management
Amount:
$2,261.85

Component Description:
Project Management
Amount:
$391.25

Component Description:
Project Management
Amount:
$1,637.85

Component Description:
Project management
Amount:
$778.60

Component Description:
Project Management
Amount:
$2,583.80

Component Description:
Project Management
Amount:
$2,067.95

Component Description:
Project Management
Amount:
$5,753.15

Component Description:
Project Management
Amount:
$3,039.70

Component Description:
Project Management
Amount:
$1,830.05

Component Description:
Project Management
Amount:
$2,950.75

Component Description:
Project management
Amount:
$1,385.85

Component Description:
Project Management
Amount:
$2,463.15

Component Description:
Project Management
Amount:
$2,640.35

Component Description:
Project management
Amount:
$148.20

Component Description:
Project Management
Amount:
$2,429.20

Component Description:
Project management
Amount:
$1,165.65

Component Description:
Project Management
Amount:
$2,528.50

Component Description:
Project management
Amount:
$971.95

Component Description:
Project Management
Amount:
$1,608.05

Component Description:
Project Management
Amount:
$3,017.75

Component Description:
Project Management
Amount:
$1,644.35

Component Description:
Project Management
Amount:
$2,064.85

Component Description:
Project management
Amount:
$1,959.20

Component Description:
Project Management
Amount:
$77.50

Component Description:
Project Management
Amount:
$3,417.00
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Perform engineering study for new channel assignment and antenna development

Component Description:
Engineering study work for new channel assignment including antenna development
Amount:
$1,500.00

Component Description:
Study the potential to co-locate KCWT, KTFV, and KFXV on the KNVO tower
Amount:
$1,900.00
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Prepare and or review reimbursement form Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Preparation of the engineering section of FCC Form 2100
Amount:
$1,375.00

Component Description:
Preparation of the engineering section of FCC From 2100
Amount:
$1,000.00
Structural Analysis Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $60,080.00 $59,515.00 N/A $2,677.50 N/A
Total for all systems $1,082,245.27 $938,163.94 N/A $411,955.16 N/A
Other Expenses $60,080.00 $59,515.00 $2,677.50
Equipment Delivery and Handling Charges $15,000.00 $15,000.00 N/A N/A N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $10,000.00 $10,000.00 N/A N/A N/A
Non-zoning permits $2,500.00 $2,500.00 N/A N/A N/A
Local Zoning $5,000.00 $5,000.00 N/A N/A N/A
MVPD Notification of Channel Change $500.00 $500.00 N/A $500.00 N/A
Develop and air announcement of upcoming channel change $15,000.00 $15,000.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A $2,177.50 N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 N/A N/A N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $190.00 N/A N/A N/A

Components

Actual Information Description File Name
Equipment Delivery and Handling Charges Information not provided.
Disposal Costs (for equipment and other waste, net of any salvage value) Information not provided.
Non-zoning permits Information not provided.
Local Zoning Information not provided.
MVPD Notification of Channel Change

Component Description:
MVPD Notification
Amount:
$500.00
Develop and air announcement of upcoming channel change Information not provided.
DTV Medical Facility Notification

Component Description:
Medical Notification
Amount:
$2,177.50
FCC Filing Fees - Form 2100 license to cover application Information not provided.
FCC Filing Fees - Special Temporary Authorization request Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $1,082,245.27 $938,163.94 $411,955.16

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. Yes
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Manuel Cavazos , III .

EVP - Director of Technology


06/21/2021

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Manuel Cavazos , III .

EVP - Director of Technology


06/21/2021

Certification

Back to Top
Section Question Response
Submission of Final Allocation or Accounting Information Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  2. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  3. The above-named entity certifies that all costs identified as "actual costs" herein accurately represent the costs actually paid by the above-named entity, including any discounts, refunds, or rebates.

  4. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  5. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  6. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Manuel Cavazos , III .

EVP - Director of Technology


06/21/2021