Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
EDGE SPECTRUM, INC. Doing Business As: EDGE SPECTRUM, INC. |
Randy Weiss PO Box 54025 Hurst, TX 76054 United States |
+1 (972) 291-3750 | randy@crosstalk.org | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | W24CP-D was displaced to Ch 36. Applicant will build the CP as part of a coordinated system build out plan. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | ACT-5XU-1000-A-C | |
Year | 2012 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | EC702MP-BB3 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 170 kW | |
Justification for New Transmitter | Model no longer supported, cannot be retuned to Ch 36. See Comark Transmitter Selection Exhibit. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | Yes | |
Description | To be determined based on site survey. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 5 tons | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Other | |
Other Antenna Type | UHF Panel | |
ERP: | 14.46 kW | |
Manufacturer | ||
Model | 1XPANGL | |
Year | 2014 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Bottom | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 2 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 860.00 MHz | |
Design power capacity in use | 100.0 % | |
ERP: | 3.0 kW | |
Manufacturer | ||
Model | TUA-LP-C1-01/01M | |
Year | 2021 | |
Justification for New Antenna | Old antenna cut to channel cannot be used for Ch 36 |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Power Dividers | Does the panel antenna require power dividers? | No |
Cable Harness | Does the panel antenna require cable harness? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Air | |
Diameter | 4 inches | |
Number of parallel runs | 1 | |
Length | 1125 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 1125 feet per run | |
Justification for New Transmission Line | Line will be swept and determined if it remains usable. Edge Spectrum uses 1 5/8" cable throughout their system as a standard. | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1005059 | |
Coordinates (NAD83) | Latitude (NAD83) | 35° 52' 15.7" N- |
Longitude (NAD83) | 079° 09' 39.0" W- | |
Overall Structure Height | 1097.10 feet | |
Support Structure Height | 1040.01 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 680.11 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | SpectraSite Communications, LLC. through American Towers, LLC. | |
Date Constructed | 01/01/1984 |
Facility ID | Call Sign | Service |
---|---|---|
183631 | WIRP-LD | LPD |
156986 | W228CV | FX |
147280 | W250BP | FX |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 80 | |
Explanation | No on site engineering staff. Complete turnkey project management. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | No |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
Prepare and file Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 5 | |
Justification | Turnkey installation and integration of new and existing equipment, includes, EAS, satellite hookup, etc. |
Name | Description |
---|---|
Site Survey |
8 hours @ $100/hour |
Mobilization Charge and travel expenses for installation |
$1500/day, 4 days |
Mobilization Charge and travel expenses for site survey |
$1500/day, 1.5 days |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $137,863.63 | $76,244.26 | N/A | $32,630.63 | N/A |
Total for all systems | $370,533.63 | $359,673.48 | N/A | $121,835.85 | N/A |
Primary Transmitter EC702MP-BB3 | $137,863.63 | $76,244.26 | $32,630.63 | ||
Transmitter Building Site Survey/Installation | $10,000.00 | $11,050.00 | See attached Comark Transmitter Quote Installation Line Item | $11,050.00 | N/A |
UHF - Air Cooled Solid State Transmitter 170 kW | $21,580.63 | $21,580.63 | actual cost | $21,580.63 | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $21,580.63 | ***System Notice: Estimate adjusted and locked because line has been superseded.***See Comark Quote. $59,716 - $11,836 (install cost) = $47,880 transmitter cost | $0.00 | N/A |
5 Ton system | $20,250.00 | $20,000.00 | N/A | N/A | N/A |
Other Electrical Service: To be determined based on site survey. | $2,033.00 | $2,033.00 | Electrical Mr. Sparky Quote | N/A | N/A |
Actual Information Description | File Name |
---|---|
Transmitter Building Site Survey/Installation | |
UHF - Air Cooled Solid State Transmitter 170 kW | |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | Information not provided. |
5 Ton system | Information not provided. |
Other Electrical Service: To be determined based on site survey. | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $9,230.00 | $12,730.00 | N/A | $1,956.00 | N/A |
Total for all systems | $370,533.63 | $359,673.48 | N/A | $121,835.85 | N/A |
Primary Antenna TUA-LP-C1-01/01M | $9,230.00 | $12,730.00 | $1,956.00 | ||
Sweep test of transmission line and antenna | $5,730.00 | $5,730.00 | N/A | N/A | N/A |
UHF Broadband panel antenna (per panel), horizontally-polarized | $3,500.00 | $7,000.00 | 2 Bay | $1,956.00 | N/A |
Actual Information Description | File Name |
---|---|
Sweep test of transmission line and antenna | Information not provided. |
UHF Broadband panel antenna (per panel), horizontally-polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $27,000.00 | $76,699.22 | N/A | $76,699.22 | N/A |
Total for all systems | $370,533.63 | $359,673.48 | N/A | $121,835.85 | N/A |
Primary Transmission Line | $27,000.00 | $76,699.22 | $76,699.22 | ||
Flexible Foam Transmission Line - dielectric, 1 5/8" | $27,000.00 | $76,699.22 | Line will be swept and determined if it remains usable. Edge Spectrum uses 1 5/8" cable throughout their system as a standard. | $76,699.22 | N/A |
Actual Information Description | File Name |
---|---|
Flexible Foam Transmission Line - dielectric, 1 5/8" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $157,750.00 | $157,750.00 | N/A | $0.00 | N/A |
Total for all systems | $370,533.63 | $359,673.48 | N/A | $121,835.85 | N/A |
Primary Tower GTOWER | $157,750.00 | $157,750.00 | $0.00 | ||
Tower Rigging Tall Tower (greater than 500') | $157,750.00 | $157,750.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $28,355.00 | $25,915.00 | N/A | $10,550.00 | N/A |
Total for all systems | $370,533.63 | $359,673.48 | N/A | $121,835.85 | N/A |
Outside Professional Services | $28,355.00 | $25,915.00 | $10,550.00 | ||
Mobilization Charge and travel expenses for site survey | $2,250.00 | $2,250.00 | 1 1/2 day @ $1500/day See ARCJ Site Survey Quote & SOW.pdf | $2,250.00 | N/A |
Mobilization Charge and travel expenses for installation | $6,000.00 | $6,000.00 | Mobilization Charge and Travel Expenses for Installation of EAS, CAP. Satellite Interconnect, Final Transmitter/Antenna connection, station turn on. Trip $1500/day 4 days. See ARCJ Turnkey Quote & SOW | N/A | N/A |
Site Survey | $800.00 | $800.00 | Site Survey Charge See ARCJ Site Suvey Quote & SOW.pdf | $800.00 | N/A |
Additional Field Engineering Service, 5 Days | $5,000.00 | $5,000.00 | Turnkey Installation and integration of new and existing equipment. Installation of EAS,CAP, Satellite Interconnect, Final Transmitter/Antenna connection, station turn on. See ARCJ Turnkey Integration Quote & SOW | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | N/A | N/A |
Form 399 assistance or other Program Management costs | $1,000.00 | $1,000.00 | See BWS Estimate Eligibility 1876 Filing | $1,000.00 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | See BWS 399 Reimbursement Estimate | $1,000.00 | N/A |
Project management of the transition | $8,440.00 | $6,000.00 | See ARCJ Project Management Quote & SOW.pdf | $5,500.00 | N/A |
Actual Information Description | File Name |
---|---|
Mobilization Charge and travel expenses for site survey | |
Mobilization Charge and travel expenses for installation | Information not provided. |
Site Survey | |
Additional Field Engineering Service, 5 Days | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Form 399 assistance or other Program Management costs | |
Prepare/ Review 399 reimbursement form | |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $10,335.00 | $10,335.00 | N/A | $0.00 | N/A |
Total for all systems | $370,533.63 | $359,673.48 | N/A | $121,835.85 | N/A |
Other Expenses | $10,335.00 | $10,335.00 | $0.00 | ||
Equipment Delivery and Handling Charges | $5,000.00 | $5,000.00 | Equipment Delivery and Handling Charges. ARCJ Equipment Storage Removal Disposal Quote & SOW.pdf | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $5,000.00 | $5,000.00 | Removal and disposal of equipment from job site, transmitter, coax, antenna and all debris. SEE ARCJ Equipment Storage Removal Disposal Quote & SOW.pdf | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
Equipment Storage | $0.00 | $0.00 | Included SEE ARCJ Equipment Storage Removal Disposal Quote & SOW | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $370,533.63 | $359,673.48 | $121,835.85 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Susan Hansen Consultant 03/26/2021 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Randall Weiss CEO 03/26/2021 |