Facility ID:
61504
Service:
DTV
Call Sign:
WXCW
Channel:
32 (UHF)
File Number:
0000028559
FRN:
0015050008
Date Submitted:
03/22/2021

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

SUN BROADCASTING, INC.

Doing Business As: SUN BROADCASTING, INC.

James Schwartzel

2824 PALM BEACH BOULEVARD

FORT MYERS, FL 33916

United States

+1 (239) 479-5524 Jim.Schwartzel@sbroadcast.com Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Joseph Belisle

Belisle Law Firm PA

PO Box 970620

Miami, FL 33197

United States

+1 (305) 978-7675 joe@belislelaw.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan WXCW plans to relocate from current tower ASR: 1213076 to the WINK tower ASR: 1019724. The proposed antenna will side mount. Engineering studies have confirmed compliance with FCC coverage requirements. See attached.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model DCX Millennium
Year 2002
Type Inductive Output Tube
IOT Power Type Single
Power Capacity 30 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model ULXTE-50
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 31.7 kW
Justification for New Transmitter Manufacturer will not retune existing transmitter. (See attached)

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 150 kVA
Rigid Conduit and Wiring Yes
Size 3 inches
Length 50.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 5 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 375.0 square feet
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

RF Accessories

RF Accessories

FL Sales Tax

FL Sales Tax

Freight

Freight

Mask Filter System

Mask Filter System

Purchase new UPS

Purchase new UPS

Installation and Proof

Installation and Proof

Electrical

Electrical

Removal

Removal and disposal of old transmitter.

Interim Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Interim
Description of Use N/A
Change Type Purchase
Manufacturer
Model UAXTE-8R44
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 4.8 kW
Justification for New Transmitter A new interim transmitter is required.

Interim Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A
Inside RF System Is an additional interior RF system required to support this interim transmitter? No

Interim Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Auxiliary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Retune Existing
Antenna Use Auxiliary (Backup)
Description of Use Emergency Backup
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? Yes
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Class A
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Broadband Panel
Number of Stations Supported 2
Number of Panels 2
Design power capacity in use 100.0 %
Lower Limit 470.00 MHz
Upper Limit 860.00 MHz
Other Antenna Type N/A
ERP: 1.6 kW
Manufacturer Dielectric
Model TUA-C2-01/02M-T
Year 2015

Facility ID's and Call Signs of all stations with whom the antenna is shared.

Facility ID Call Sign
22093 WINK-TV

Auxiliary Antenna

Back to Top

Adjustment to Existing Antenna

Section Question Response
Sweep Test of Existing Antenna Do you need a sweep test of existing antenna? No

Auxiliary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency

Auxiliary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model TFU-30 DSC-R3P320BNT
Year 2002

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 900.0 kW
Manufacturer
Model TFU 25 JSC/VP-R 3P320BN
Year 2002
Justification for New Antenna WXCW plans to relocate to the WINK tower. This will avoid the need for interim facilities for WXCW. (See attached)

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna?
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Custom mounts

Custom mounts

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? Yes
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Broadband Slot
Number of Stations Supported 2
Number of Panels/Bays 24
Lower Limit 572.00 MHz
Upper Limit 692.00 MHz
Design power capacity in use 100.0 %
Other Antenna Type N/A
ERP: 567.0 kW
Manufacturer
Model TFU-24WB-R C160
Year 2019
Justification for New Antenna Temp operation

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 8 3/16 inches
Other Diameter N/A
Segment Length 19 3/4 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1550 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1485 feet per run
Justification for New Transmission Line Existing stick length not compatible with new channel assignment.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

TLSCRs

TLSCRs

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Rigid
Diameter 4 1/16 inches
Segment Length 19 ½ '
Other Segment Length
Number of parallel runs 1
Length 1300 feet per run
Justification for New Transmission Line Feed interim antenna used to facilitate tower work.

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Elbow 4-50 Digit 7 X 14

Elbow 4-50 Digit 7 X 14

Elbow 4-50 EIA 6 X 12

Elbow 4-50 EIA 6 X 12

Elbow 4-50 EIA 6 X 6

Elbow 4-50 EIA 6 X 6

Other Transmission Line Parts

Other Transmission Line Parts

Rigid TL 4-50 15 ft to 20 ft

Rigid TL 4-50 15 ft to 20 ft

Rigid TL 4-50 5 ft to 10 ft

Rigid TL 4-50 5 ft to 10 ft

Rigid TL 4-50 up to 5 ft

Rigid TL 4-50 up to 5 ft

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Add Tower

Section Question Response
Existing Tower Description Type of change Move Equipment
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1213076
Coordinates (NAD83) Latitude (NAD83) 26° 47' 08.7" N-
Longitude (NAD83) 081° 47' 45.9" W-
Overall Structure Height 1515.07 feet
Support Structure Height 1455.03 feet
Ground Elevation Above Mean Sea Level (AMSL) 28.87 feet
Structure Type GTOWER - Guyed Structure Used for Communication Purposes
Tower Owner American Towers, LLC
Date Constructed 02/15/2002

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
174244 WMYE FM
71580 WRXY-TV DTV

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Weather Day

Weather Day

Minor Modifications

Structural modifications upon removal of antenna/line

Equipment removal

Removal of pre-transition antenna and line

Auxiliary Tower

Back to Top

Add Tower

Section Question Response
Existing Tower Description Type of change Move Equipment
Tower Use Auxiliary (Backup)
Description of Use Emergency Backup
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? No
ASR Number
Coordinates (NAD83) Latitude (NAD83) 26° 39' 05.3" N-
Longitude (NAD83) 081° 51' 18.3" W-
Overall Structure Height 201.00 feet
Support Structure Height 201.00 feet
Ground Elevation Above Mean Sea Level (AMSL) 5.90 feet
Structure Type UTOWER - Unguyed - Free Standing Tower
Tower Owner Ft. Myers Broadcasting Co.
Date Constructed 03/23/1954

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
22093 WINK-TV DTV

Auxiliary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Auxiliary Tower

Back to Top

Other Tower Expenses Not Listed

Information not provided.

Interim Tower

Back to Top

Tower Construction Costs

Section Question Response
Construct New Tower Use Interim
Description of Use N/A
Height 1455.00 feet
Justification for New Tower No new tower; Just rigging work on the existing tower

Interim Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Interim Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Interim Antenna and Line Installation

Interim Antenna and Line Installation

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 80
Explanation Oversight of antenna and line removal at pre-transition transmitter facility.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Attorney Fees - Various

Attorney Fees - Various

Eng study and antenna devel for Interim STA

Eng study and antenna devel for Interim STA

Other Engineering Services

Other Engineering Services

Permitting

Permitting

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? No
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Equipment Delivery and Handling Charges

Equipment Delivery and Handling Charges

Project Oversight

Employee costs for planning, coordination and supervision.

STL backup power

STL backup power

STL due to New Tower

STL due to New Tower

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,378,443.03 $1,332,110.34 N/A $1,021,528.24 N/A
Total for all systems $7,176,593.79 $2,817,435.13 N/A $2,089,120.57 N/A
Interim Transmitter UAXTE-8R44 $236,500.00 $194,467.31 $194,467.31
UHF - Air Cooled Solid State Transmitter 4 - 6 kW $236,500.00 $194,467.31 See attached / uploaded PDF file titled "Gates JW30004716-1 v200225jgv1.pdf" $194,467.31 N/A
Primary Transmitter ULXTE-50 $1,141,943.03 $1,137,643.03 $827,060.93
Removal $20,000.00 $20,000.00 Removal and disposal of existing transmitter N/A N/A
Electrical $7,010.46 $7,010.46 See attached / uploaded PDF file titled "Gates US0332273 v191213jgv1.pdf" $7,010.46 N/A
Installation and Proof $58,543.75 $58,543.75 See attached / uploaded PDF file titled "Gates US0332273 v191213jgv1.pdf" N/A N/A
Purchase new UPS $115,107.35 $115,107.35 See attached/uploaded PDF file titled "North Star 23235 v191119jgv1.pdf" $0.00 N/A
Freight $5,900.00 $5,900.00 See attached / uploaded PDF file titled "Gates US0332273 v191213jgv1.pdf" N/A N/A
FL Sales Tax $47,519.79 $47,519.79 See attached / uploaded PDF file titled "Gates US0332273 v191213jgv1.pdf" $47,519.79 N/A
RF Accessories $56,676.88 $56,676.88 See attached / uploaded PDF file titled "Gates US0332273 v191213jgv1.pdf" $56,676.88 N/A
Other -- Building Addition Size: 375.0 $28,731.00 $28,731.00 See attached response to TV Broadcaster Relocation Fund Administrator N/A N/A
5 Ton system $20,250.00 $19,250.00 N/A N/A N/A
3" Rigid Conduit and Wiring (Cost per foot) $2,600.00 $2,450.00 N/A N/A N/A
Transformer 3 phase/480v - 150 KVA $25,550.00 $24,300.00 N/A N/A N/A
Switchgear - industrial 800 amp $38,200.00 $36,300.00 N/A N/A N/A
UHF - Liquid Cooled Solid State Transmitter 31.7 kW $670,913.37 $670,913.37 N/A $670,913.37 N/A
Mask Filter System $44,940.43 $44,940.43 See attached / uploaded PDF file titled "Gates US0332273 v191213jgv1.pdf" $44,940.43 N/A

Components

Actual Information Description File Name
UHF - Air Cooled Solid State Transmitter 4 - 6 kW

Component Description:
Gates JW30004716-1 v200225jgv1
Amount:
$61,562.39

Component Description:
Gates US0336417 v200424jgv1
Amount:
$44,531.53

Component Description:
Gates JW30004716-2 v200424jgv1
Amount:
$61,562.39

Component Description:
Gates US0336702 v200827pmv1
Amount:
$26,811.00
Removal Information not provided.
Electrical

Component Description:
Gates US0332273 Prim TX elec pmt 1 v200225jgv2
Amount:
$7,010.46
Installation and Proof Information not provided.
Purchase new UPS

Component Description:
North Star 23235 v191119jgv1
Amount:
$115,107.35
Freight Information not provided.
FL Sales Tax

Component Description:
Gates US0332273 Prim TX tax pmt 1 v200225jgv2
Amount:
$47,519.79
RF Accessories

Component Description:
Gates US0332273 Prim TX RF access pmt 1 v200225jgv2
Amount:
$56,676.88
Other -- Building Addition Size: 375.0 Information not provided.
5 Ton system Information not provided.
3" Rigid Conduit and Wiring (Cost per foot) Information not provided.
Transformer 3 phase/480v - 150 KVA Information not provided.
Switchgear - industrial 800 amp Information not provided.
UHF - Liquid Cooled Solid State Transmitter 31.7 kW

Component Description:
Gates US0332273 Prim TX pmt 1 v200225jgv2
Amount:
$670,913.37
Mask Filter System

Component Description:
Gates US0332273 Prim TX mask filter pmt 1 v200225jgv2
Amount:
$44,940.43

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $318,327.70 $313,575.74 N/A $307,935.74 N/A
Total for all systems $7,176,593.79 $2,817,435.13 N/A $2,089,120.57 N/A
Interim Antenna TFU-24WB-R C160 $91,797.70 $88,267.70 $88,267.70
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 567 kW input, directional,, horizontally polarized $85,067.70 $85,067.70 See attached / uploaded PDF file titled, "Die ST659004 v200217pmv1". $85,067.70 N/A
Sweep test of existing antenna $6,730.00 $3,200.00 N/A $3,200.00 N/A
Primary Antenna TFU 25 JSC/VP-R 3P320BN $226,530.00 $225,308.04 $219,668.04
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) $12,300.00 $11,668.04 See attached/uploaded PDF file titled "Die MAN01334 v191121jgv1.pdf" $11,668.04 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $5,760.00 N/A
UHF - High Power, Side Mount, basic slot antenna, 900 kW input, directional,, elliptically or circularly polarized $183,643.80 $183,643.80 See attached/uploaded PDF file titled "Die MAN01334 v191121jgv1.pdf" $183,643.80 N/A
Custom mounts $18,596.20 $18,596.20 See attached/uploaded PDF file titled "Die MAN01334 v191121jgv1.pdf" $18,596.20 N/A
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $5,000.00 N/A N/A N/A
Auxiliary Antenna TUA-C2-01/02M-T $0.00 $0.00 $0.00

Components

Actual Information Description File Name
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 567 kW input, directional,, horizontally polarized

Component Description:
Die MAN01335 v200512jgv2
Amount:
$36,108.00

Component Description:
Die 659004 v200305pmv2
Amount:
$8,024.00

Component Description:
Die MAN01443 v200512jgv2
Amount:
$36,108.00

Component Description:
Die ST659004 v200217pmv1
Amount:
$4,827.70
Sweep test of existing antenna

Component Description:
Die 896005 v210322pmv1
Amount:
$320.00

Component Description:
Die MAN01335 v200512jgv2
Amount:
$1,440.00

Component Description:
Die MAN01443 v200512jgv2
Amount:
$1,440.00
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed)

Component Description:
Die ST753013 v200827pmv1
Amount:
$684.04

Component Description:
Die MAN01442 Prim elbow 45 pct pmt 2 v191121jgv1
Amount:
$4,942.80

Component Description:
Die MAN01334 Prim elbow 45 pct pmt 1 v191121jgv1
Amount:
$4,942.80

Component Description:
Die 753013 v200826pmv1
Amount:
$1,098.40
Sweep test of existing antenna

Component Description:
Die MAN01442 Prim sweep 45 pct pmt 2 v191121jgv1
Amount:
$2,880.00

Component Description:
Die MAN01334 Prim sweep 45 pct pmt 1 v191121jgv1
Amount:
$2,880.00
UHF - High Power, Side Mount, basic slot antenna, 900 kW input, directional,, elliptically or circularly polarized

Component Description:
Die 753013 v200826pmv1
Amount:
$9,885.60

Component Description:
Die ST747009 v200826pmv1
Amount:
$11,663.80

Component Description:
Die 804003 v200827pmv1
Amount:
$7,312.40

Component Description:
Die MAN01442 Prim ant 45 pct pmt 2 v191121jgv1
Amount:
$77,391.00

Component Description:
Die MAN01334 Prim ant 45 pct pmt 1 v191121jgv1
Amount:
$77,391.00
Custom mounts

Component Description:
Die 804003 v200827pmv1
Amount:
$1,752.00

Component Description:
Die MAN01442 Prim ant mts 45 pct pmt 2 v191121jgv1
Amount:
$7,884.00

Component Description:
Die MAN01334 Prim ant mts 45 pct pmt 1 v191121jgv1
Amount:
$7,884.00

Component Description:
Die ST804003 v210216pmv1
Amount:
$1,076.20
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) Information not provided.

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $508,799.42 $332,485.41 N/A $332,092.61 N/A
Total for all systems $7,176,593.79 $2,817,435.13 N/A $2,089,120.57 N/A
Interim Transmission Line $204,901.42 $106,436.95 $106,436.95
Rigid TL 4-50 up to 5 ft $1,412.40 $1,412.40 N/A $1,412.40 N/A
Rigid TL 4-50 5 ft to 10 ft $2,418.20 $2,418.20 N/A $2,418.20 N/A
Rigid TL 4-50 15 ft to 20 ft $1,395.28 $1,395.28 N/A $1,395.28 N/A
Elbow 4-50 EIA 6 X 12 $1,498.00 $1,498.00 N/A $1,498.00 N/A
Elbow 4-50 Digit 7 X 14 $4,010.49 $4,010.49 See attached /uploaded PDF file titled, "Die ST659004 v200217pmv1". $4,010.49 N/A
Rigid Transmission Line - copper, 4 1/16" $184,600.00 $86,135.53 N/A $86,135.53 N/A
Elbow 4-50 EIA 6 X 6 $3,790.12 $3,790.12 N/A $3,790.12 N/A
Other Transmission Line Parts $5,776.93 $5,776.93 N/A $5,776.93 N/A
Primary Transmission Line $303,898.00 $226,048.46 $225,655.66
TLSCRs $3,928.00 $3,928.00 See attached/uploaded PDF file titled "Die MAN01334 v191121jgv1.pdf" $3,535.20 N/A
Rigid Transmission Line - copper, 6 1/8" $299,970.00 $222,120.46 See attached/uploaded PDF file titled "Die MAN01334 v191121jgv1.pdf" $222,120.46 N/A

Components

Actual Information Description File Name
Rigid TL 4-50 up to 5 ft

Component Description:
Die ST748007 v210322pmv1
Amount:
$23.10

Component Description:
Die 748007 v210322pmv1
Amount:
$330.00

Component Description:
Die 737013 v210322pmv1
Amount:
$990.00

Component Description:
Die ST737013 v210322pmv1
Amount:
$69.30
Rigid TL 4-50 5 ft to 10 ft

Component Description:
Die ST748007 v210322pmv1
Amount:
$94.92

Component Description:
Die 748007 v210322pmv1
Amount:
$1,356.00

Component Description:
Die 737016 v210322pmv1
Amount:
($1,087.20)

Component Description:
Die ST737013 v210322pmv1
Amount:
$63.28

Component Description:
Die 737013 v210322pmv1
Amount:
$904.00

Component Description:
Die MAN01443 v200512jgv2
Amount:
$543.60

Component Description:
Die MAN01335 v200512jgv2
Amount:
$543.60
Rigid TL 4-50 15 ft to 20 ft

Component Description:
Die 737016 v210322pmv1
Amount:
$130.40

Component Description:
Die ST737016 v210322pmv1
Amount:
$91.28

Component Description:
Die MAN01443 v200512jgv2
Amount:
$586.80

Component Description:
Die MAN01335 v200512jgv2
Amount:
$586.80
Elbow 4-50 EIA 6 X 12

Component Description:
Die ST748007 v210322pmv1
Amount:
$49.00

Component Description:
Die ST744009 v201204pmv1
Amount:
$49.00

Component Description:
Die 748007 v210322pmv1
Amount:
$700.00

Component Description:
Die 744009 v201204pmv1
Amount:
$700.00
Elbow 4-50 Digit 7 X 14

Component Description:
Die ST746022 v210322pmv1
Amount:
$40.74

Component Description:
Die 659004 v200305pmv2
Amount:
$310.40

Component Description:
Die ST659004 v200217pmv1
Amount:
$186.75

Component Description:
Die 746022 v201204pmv1
Amount:
$679.00

Component Description:
Die MAN01443 v200512jgv2
Amount:
$1,396.80

Component Description:
Die MAN01335 v200512jgv2
Amount:
$1,396.80
Rigid Transmission Line - copper, 4 1/16"

Component Description:
Die 725022 v201125pmv1
Amount:
$13,724.60

Component Description:
Die MAN01335 v200512jgv2
Amount:
$30,375.54

Component Description:
Die ST659004 v200217pmv1
Amount:
$4,061.26

Component Description:
Die 659004 v200305pmv2
Amount:
$1,609.32

Component Description:
Die 737016 v210322pmv1
Amount:
$2,260.80

Component Description:
Die 896005 v210322pmv1
Amount:
$2,880.00

Component Description:
Die ST725022 v201125pmv1
Amount:
$848.47

Component Description:
Die MAN01443 v200512jgv2
Amount:
$30,375.54
Elbow 4-50 EIA 6 X 6

Component Description:
Die ST742012 v201208pmv1
Amount:
$238.12

Component Description:
Die 742012 v201204pmv1
Amount:
$3,552.00
Other Transmission Line Parts

Component Description:
Die ST746022 v210322pmv1
Amount:
$350.58

Component Description:
Die 746022 v201204pmv1
Amount:
$5,426.35
TLSCRs

Component Description:
Die MAN01442 Prim TLSCRs 45 pct pmt 2 v191121jgv1
Amount:
$1,767.60

Component Description:
Die MAN01334 Prim TLSCRs 45 pct pmt 1 v191121jgv1
Amount:
$1,767.60
Rigid Transmission Line - copper, 6 1/8"

Component Description:
Die 748008 v200826pmv1
Amount:
$6,070.96

Component Description:
Die 804003 v200827pmv1
Amount:
$8,455.60

Component Description:
Die MAN01442 Prim line 45 pct pmt 2 v191121jgv1
Amount:
$97,297.92

Component Description:
Die MAN01334 Prim line 45 pct pmt 1 v191121jgv1
Amount:
$97,297.92

Component Description:
Die ST748008 v200827pmv1
Amount:
$12,998.06

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $4,720,074.87 $552,674.87 N/A $238,224.87 N/A
Total for all systems $7,176,593.79 $2,817,435.13 N/A $2,089,120.57 N/A
Auxiliary Tower UTOWER $84,200.00 $0.00 $0.00
Short Tower (less than 500') $84,200.00 $0.00 N/A N/A N/A
Interim Tower $4,157,151.87 $120,001.87 $120,001.87
Interim Antenna and Line Installation $120,001.87 $120,001.87 See attached/uploaded PDF files titled "ERI WINK-300 v200225jgv2.pdf", "ERI WINK-37231 v200206jgv1.pdf" and "ERI WINK-55466 v200428jgv1.pdf" $120,001.87 N/A
New tower between 1000' and 1500' without elevator, presumptive soil conditions $3,826,650.00 $0.00 N/A N/A N/A
Tall Tower (greater than 500') $210,500.00 $0.00 N/A N/A N/A
Primary Tower GTOWER $478,723.00 $432,673.00 $118,223.00
Weather Day $31,500.00 $31,500.00 See attached / uploaded PDF file titled "NE Twrs 2000650427-W v200929pmv1". $31,500.00 N/A
Equipment removal $86,723.00 $86,723.00 Estimate to remove pre-transition antenna and line upon advice from tower company. See attached invoices and quotes $86,723.00 N/A
Minor Modifications $150,000.00 $150,000.00 Tower company advised we make this allowance as modifications expected to be needed upon removal of antenna and line. N/A N/A
Tall Tower (greater than 500') $210,500.00 $164,450.00 As per proposal from tower erector company. N/A N/A

Components

Actual Information Description File Name
Short Tower (less than 500') Information not provided.
Interim Antenna and Line Installation

Component Description:
ERI WINK-55614 v201207pmv1
Amount:
$162.73

Component Description:
ERI WINK-37231 v200206jgv1
Amount:
$45,217.60

Component Description:
ERI WINK-300 v200225jgv2
Amount:
$56,522.00

Component Description:
ERI WINK-55466 v200428jgv1
Amount:
$18,099.54
New tower between 1000' and 1500' without elevator, presumptive soil conditions Information not provided.
Tall Tower (greater than 500') Information not provided.
Weather Day

Component Description:
NE Twrs 2000650427-W v200929pmv1
Amount:
$31,500.00
Equipment removal

Component Description:
Gates US0337072 v200827pmv1
Amount:
$45,697.00

Component Description:
Gates US0338018 v200827pmv1
Amount:
$41,026.00
Minor Modifications Information not provided.
Tall Tower (greater than 500') Information not provided.

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $75,474.41 $111,719.41 N/A $80,419.41 N/A
Total for all systems $7,176,593.79 $2,817,435.13 N/A $2,089,120.57 N/A
Outside Professional Services $75,474.41 $111,719.41 $80,419.41
Permitting $4,099.41 $4,099.41 See attached invoices / quotes $4,099.41 N/A
Other Engineering Services $10,000.00 $10,000.00 Other Engineering Services such as RF calculations, establish transition plans, review structural studies, etc. $3,700.00 N/A
Eng study and antenna devel for Interim STA $750.00 $750.00 See attached / uploaded PDF file titled "DLR 243827 v191209jgv1.pdf" $750.00 N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A $525.00 N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $2,000.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A $250.00 N/A
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application $4,210.00 $4,000.00 N/A $1,175.00 N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A $2,050.00 N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,500.00 N/A $750.00 N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A $1,125.00 N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application $2,105.00 $2,000.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A N/A N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $4,875.00 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A
Prepare and or review reimbursement form $2,630.00 $23,825.00 See attached invoices $23,825.00 N/A
Project management of the transition $12,640.00 $32,125.00 Estimated cost based on time needed to decommission the pre-transition transmitter site. $32,125.00 N/A
Attorney Fees - Various $5,170.00 $5,170.00 See attached invoices $5,170.00 N/A

Components

Actual Information Description File Name
Permitting

Component Description:
AFF 2020108 v200817pmv1
Amount:
$4,099.41
Other Engineering Services

Component Description:
KGA 719-16 v200821pmv1
Amount:
$2,325.00

Component Description:
KGA 719-09 v200821pmv1
Amount:
$200.00

Component Description:
KGA 719-15 v200821pmv1
Amount:
$175.00

Component Description:
KGA 719-05 v191023jgv1
Amount:
$775.00

Component Description:
KGA 719-10 v200821pmv1
Amount:
$225.00

Component Description:
KGA 729-17 v200821pmv1
Amount:
$200.00
Eng study and antenna devel for Interim STA

Component Description:
DLR 243827 v191209jgv1
Amount:
$750.00
Attorney Fees - Prepare and File request for Special Temporary Authorization

Component Description:
Legal for Schedule 387
Amount:
$200.00

Component Description:
399 Amendment
Amount:
$325.00

Component Description:
Legal modification filing
Amount:
$1,370.00
Attorney Fees - Negotiation of lease and other matters for shared locations Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application

Component Description:
Legal for Form 2100
Amount:
$250.00
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application

Component Description:
TV Relocation Fund Matters
Amount:
$1,175.00
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
Form 2100 application
Amount:
$2,050.00
Prepare request for Special Temporary Authorization

Component Description:
DLR 243946 v200214pmv1
Amount:
$750.00
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application

Component Description:
Preparation of the engineering section of FCC Form 2100.
Amount:
$1,125.00
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application Information not provided.
Perform engineering study for new channel assignment and antenna development

Component Description:
Engineering study work for new channel assignment and antenna development.
Amount:
$1,125.00

Component Description:
Engineering study work for new channel assignment and antenna development.
Amount:
$1,125.00

Component Description:
DLR inv #243270 Engineering Study Work for New Channel Assignment Development UL20190415RCW1
Amount:
$1,750.00

Component Description:
Engineering study work for new channel assignment and antenna development.
Amount:
$875.00
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Prepare and or review reimbursement form

Component Description:
KGA 719-38 v200827pmv1
Amount:
$905.00

Component Description:
KGA 719-35 v200821pmv1
Amount:
$140.00

Component Description:
KGA 719-11 v200821pmv1
Amount:
$525.00

Component Description:
KGA 719-08 v200821pmv1
Amount:
$525.00

Component Description:
KGA 719-47 v210215pmv1
Amount:
$2,520.00

Component Description:
KGA 719-30 v200821pmv1
Amount:
$1,125.00

Component Description:
KGA 719--26 v200827pmv1
Amount:
$730.00

Component Description:
KGA 719-50 v210215pmv1
Amount:
$975.00

Component Description:
KGA 719-33 v200821pmv1
Amount:
$475.00

Component Description:
KGA 719-19 v200821pmv1
Amount:
$670.00

Component Description:
KGA 719-14 v200821pmv1
Amount:
$4,175.00

Component Description:
KGA 719-24 v200821pmv1
Amount:
$2,970.00

Component Description:
KGA 719-07 v200821pmv1
Amount:
$905.00

Component Description:
KGA 719-18 v200821pmv1
Amount:
$2,100.00

Component Description:
KGA 719-45 v210215pmv1
Amount:
$135.00

Component Description:
KGA 719-40 v210215pmv1
Amount:
$3,970.00

Component Description:
KGA 719-42 v210215pmv1
Amount:
$380.00

Component Description:
KGA 719-53 v210215pmv1
Amount:
$600.00
Project management of the transition

Component Description:
KGA 719-03 v200821pmv1
Amount:
$150.00

Component Description:
KGA 719-36 v200821pmv1
Amount:
$150.00

Component Description:
KGA 719-29 v200821pmv1
Amount:
$150.00

Component Description:
Gates US0337558 v201203pmv1
Amount:
$4,375.00

Component Description:
Gates US0339989 v210318pmv3
Amount:
$26,250.00

Component Description:
KGA 719-27 v200821pmv1
Amount:
$150.00

Component Description:
Gates US0334090 v200211pmv1
Amount:
$15,000.00

Component Description:
KGA 719-06 v200821pmv1
Amount:
$150.00

Component Description:
KGA 719-28 v200821pmv1
Amount:
$150.00

Component Description:
KGA 719-04 v191023jgv1
Amount:
$150.00

Component Description:
KGA 719-51 v210215pmv1
Amount:
$150.00

Component Description:
KGA 719-20 v200821pmv1
Amount:
$150.00

Component Description:
KGA 719-43 v210215pmv1
Amount:
$150.00
Attorney Fees - Various

Component Description:
Belisle 20200131WXCW v200826pmv1
Amount:
$75.00

Component Description:
Belisle 20200302WXCW v200826pmv1
Amount:
$400.00

Component Description:
Belisle 20200101WXCW v200826pmv1
Amount:
$1,225.00

Component Description:
Correspondence with FCC regarding legal bills
Amount:
$100.00

Component Description:
Belisle 20181031BLF02 v190913pmv1
Amount:
$125.00

Component Description:
Emails to gather information about transition plan progress report
Amount:
$300.00

Component Description:
Various research and submission of transition plan progress report
Amount:
$250.00

Component Description:
File Form 377 and email James Schwartzel
Amount:
$50.00

Component Description:
Belisle 20180731BLF01 v190913pmv1
Amount:
$50.00

Component Description:
File Form 377 and notify James Schwartzel
Amount:
$50.00

Component Description:
Belisle 20190201BLF01 v190913pmv1
Amount:
$300.00

Component Description:
Belisle 20181031BLF01 v190913pmv1
Amount:
$100.00

Component Description:
Belisle 20171201BLF01 v190913pmv1
Amount:
$1,370.00

Component Description:
Belisle 20180201BLF01 v190913pmv1
Amount:
$250.00

Component Description:
Belisle 20200430WXCW v200826pmv1
Amount:
$225.00

Component Description:
Belisle 20180503BLF01 v190913pmv1
Amount:
$50.00

Component Description:
Belisle 20200902WXCW v201022pmv2
Amount:
$1,000.00

Component Description:
Belisle 20190201BLF02 v190913pmv1-Not Reimb
Amount:
N/A

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $175,474.36 $174,869.36 N/A $108,919.70 N/A
Total for all systems $7,176,593.79 $2,817,435.13 N/A $2,089,120.57 N/A
Other Expenses $175,474.36 $174,869.36 $108,919.70
STL due to New Tower $107,023.46 $107,023.46 See attached / uploaded PDF file titled "New Tower Revised Plan v200706jgv2.pdf" $94,585.80 N/A
STL backup power $815.00 $815.00 See attached / uploaded PDF file titled "STL backup power v210308jgv1.pdf" N/A N/A
Project Oversight $9,600.00 $9,600.00 Employee cost to cover planning, coordination and oversight. N/A N/A
Equipment Delivery and Handling Charges $9,745.90 $9,745.90 N/A $9,745.90 N/A
Equipment Storage $15,600.00 $15,600.00 See attached / uploaded PDF file titled "Die ship to storage quote.pdf" N/A N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,070.00 N/A N/A N/A
Develop and air announcement of upcoming channel change $1,000.00 $1,000.00 N/A N/A N/A
MVPD Notification of Channel Change $1,500.00 $1,500.00 N/A N/A N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $190.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 N/A N/A N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $5,000.00 $5,000.00 Excess cost above salvage for antenna, line and misc. hardware disposal. N/A N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A $4,588.00 N/A
Non-zoning permits $12,000.00 $12,000.00 Space preparation, electrical, tower work. N/A N/A

Components

Actual Information Description File Name
STL due to New Tower

Component Description:
IMT CD60163548B v210318pmv1
Amount:
$94,585.80
STL backup power Information not provided.
Project Oversight Information not provided.
Equipment Delivery and Handling Charges

Component Description:
Die 696016 v201130pmv1
Amount:
$3,358.12

Component Description:
Die 742012 v201204pmv1
Amount:
$656.52

Component Description:
Die 750034 v201204pmv1
Amount:
$904.69

Component Description:
Die 738010 v201204pmv1
Amount:
$3,405.88

Component Description:
Die 748007 v210322pmv1
Amount:
$591.34

Component Description:
Die 744009 v201204pmv1
Amount:
$172.83

Component Description:
Die 746022 v201204pmv1
Amount:
$656.52
Equipment Storage Information not provided.
FCC Filing Fees - Form 2100 minor change CP application Information not provided.
Develop and air announcement of upcoming channel change Information not provided.
MVPD Notification of Channel Change Information not provided.
FCC Filing Fees - Special Temporary Authorization request Information not provided.
FCC Filing Fees - Form 2100 license to cover application Information not provided.
Disposal Costs (for equipment and other waste, net of any salvage value) Information not provided.
DTV Medical Facility Notification

Component Description:
KGA 719-22 v200821pmv1
Amount:
$4,588.00
Non-zoning permits Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $7,176,593.79 $2,817,435.13 $2,089,120.57

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Jeffrey C Gehman

Engineering Associate


03/22/2021

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Jeffrey C Gehman

Engineering Associate


03/22/2021