Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
SCRIPPS BROADCASTING HOLDINGS LLC |
Dave Giles C/O SCRIPPS MEDIA, INC. 312 Walnut ST 28th Floor Cincinnati, OH 45202 United States |
+1 (513) 977-3000 | dave.giles@scripps.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Ray Thurber SCRIPPS BROADCASTING HOLDINGS LLC |
Ray Thurber 312 WALNUT STREET 28TH FLOOR CINCINNATI, OH 45202 United States |
+1 (248) 827-9202 | ray.thurber@scripps.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Continue operation on existing tower, transmission line and antenna. Build a new tower and install new transmission line and antenna. Modification of the existing tower is more expensive than the new tower construction. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | SigmaCD | |
Year | 2004 | |
Type | Inductive Output Tube | |
IOT Power Type | Single | |
Power Capacity | 23.6 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTE-50 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 31.7 kW | |
Justification for New Transmitter | Existing transmitter will not re-tune to new frequency. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 300 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 4. inches | |
Length | 200.0 feet | |
Other Electrical Service | Yes | |
Description | The replacement of power company pole transformers and power lines between power pole transformers and the building is needed to accommodate the added load during the transition period. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 10 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Primary Transmitter Other Expenses |
Primary Transmitter Other Expenses |
Old transmitter DE-INSTALL |
DE-INSTALL of old transmitter and all associated equipment. |
Transmitter - HVAC installation |
Transmitter - HVAC installation |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Middle | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 880.0 kW | |
Manufacturer | ||
Model | TFU 24DSB C270 (SP) (C) | |
Year | 2006 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | TFU-23JSC/VP-R C270 D25 PER C-70120-4 | |
Year | 2017 | |
Justification for New Antenna | The existing antenna can not be re tuned to the new frequency. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 4 1/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 4 1/16 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 260 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 4 1/16 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 22 | |
Length | 20 feet per run | |
Justification for New Transmission Line | Both transmitters have to be on the air at the same time for the transition period. Continued operation of current transmitter on current tower, and new transmitter on new tower. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Construct New |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | Terrain Constrained | |
Is this tower currently shared with any other stations? | No | |
One or more FM, AM or TV radio broadcaster(s) | N/A | |
Others Types of Users | N/A | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
ASR Number | ||
Coordinates (NAD83) | Latitude (NAD83) | 38° 44' 42.0" N- |
Longitude (NAD83) | 104° 51' 41.0" W- | |
Overall Structure Height | 220.00 feet | |
Support Structure Height | 150.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 9430.00 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | Cheyenne Propagation | |
Date Constructed | 06/01/1978 |
Section | Question | Response |
---|---|---|
Construct New Tower | Use | Primary (Main) |
Description of Use | N/A | |
Is this a request for upgraded equipment? | No | |
Height | 199.00 feet | |
Justification for New Tower | New tower construction cost less than modifications needed to the existing 1978 tower. |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Terrain constrained |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Move Existing STL Dish to New Tower |
Move Existing STL Dish to New Tower |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 595 | |
Explanation | reimbursement filing, expense tracking, vendor coordination, progress reporting, budget creation, budget review, budget tracking, daisy-chain monitoring and all other activities necessary | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | Yes | |
Environmental Assessment | No | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | Yes | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Engineering study |
coverage mapping of new channel assignment and equipment |
KOAA repack 28 to repack 25 by Entravision |
Entravision in Denver wants to be placed on channel 28. This move forces KOAA to move to channel 25. Co-channel to channel 24 KRDO. Additional studies are required. |
New Tower design analysis |
Tower load analysis and deign for new tower |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Equipment Rental |
Equipment Rental |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,143,199.99 | $1,165,594.99 | N/A | $704,921.01 | N/A |
Total for all systems | $3,044,041.35 | $2,665,352.59 | N/A | $1,973,026.74 | N/A |
Primary Transmitter ULXTE-50 | $1,143,199.99 | $1,165,594.99 | $704,921.01 | ||
UHF - Liquid Cooled Solid State Transmitter 31.7 kW | $902,134.58 | $902,134.58 | Please see GatesAir Transmitter and Antenna justification | $594,888.45 | N/A |
Primary Transmitter Other Expenses | $1,643.76 | $1,643.76 | Please see GatesAir quote Q-85982, plus freight and tax on invoice US0334791 | $1,643.76 | N/A |
Old transmitter DE-INSTALL | $18,280.85 | $18,280.85 | DE-INSTALL of the old transmitter, lines, electrical power supplies, and all associated equipment to a staging area for disposal. | $0.00 | N/A |
Transmitter - HVAC installation | $15,840.80 | $15,840.80 | Please see Vikor Teleconstruction quote 1901453CO2 | $15,840.80 | N/A |
10 Ton system | $38,900.00 | $37,000.00 | N/A | $0.00 | N/A |
Other Electrical Service: The replacement of power company pole transformers and power lines between power pole transformers and the building is needed to accommodate the added load during the transition period. | $65,000.00 | $65,000.00 | replacing transformers, feedline to building, and pole install. | $0.00 | N/A |
4." Rigid Conduit and Wiring | $12,000.00 | $12,000.00 | N/A | $0.00 | N/A |
Transformer 3 phase/480v - 300 KVA | $36,800.00 | $0.00 | Colorado Springs Utility is not charging for this "Transformer 3 phase/480V-300KVA" upgrade. This expense went from $35,850.00 to $0 | $0.00 | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $67,479.00 | Both transmitters must be ran on the same electrical service at the same time, requiring added capacity.. | $46,332.00 | N/A |
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $46,216.00 | Both transmitters must be ran on the same electrical service at the same time requiring additional capacity. predetermined values are correct now | $46,216.00 | N/A |
Actual Information Description | File Name |
---|---|
UHF - Liquid Cooled Solid State Transmitter 31.7 kW | |
Primary Transmitter Other Expenses | |
Old transmitter DE-INSTALL | |
Transmitter - HVAC installation | |
10 Ton system | Information not provided. |
Other Electrical Service: The replacement of power company pole transformers and power lines between power pole transformers and the building is needed to accommodate the added load during the transition period. | Information not provided. |
4." Rigid Conduit and Wiring | Information not provided. |
Transformer 3 phase/480v - 300 KVA | Information not provided. |
Switchgear - industrial 800 amp | |
Service entrance 3 phase/800 amp/208 volt |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $272,377.10 | $249,686.20 | N/A | $229,681.94 | N/A |
Total for all systems | $3,044,041.35 | $2,665,352.59 | N/A | $1,973,026.74 | N/A |
Primary Antenna TFU-23JSC/VP-R C270 D25 PER C-70120-4 | $272,377.10 | $249,686.20 | $229,681.94 | ||
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $5,000.00 | N/A | $0.00 | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $0.00 | Decreased and consolidated with the primary antenna budget category. | $0.00 | N/A |
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) | $9,570.00 | $10,619.10 | See Estimated Cost Justification KOAA-TV-210-Primary Antenna - Elbow Complex V2 | $10,619.10 | N/A |
UHF - High Power, Side Mount, basic slot antenna, 1000 kW input, directional,, elliptically or circularly polarized | $227,667.10 | $227,667.10 | Previous antenna could not be retuned to new frequency. | $219,062.84 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | Information not provided. |
Side mount brackets for high power antennas (if not included in antenna base cost) | Information not provided. |
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) | |
UHF - High Power, Side Mount, basic slot antenna, 1000 kW input, directional,, elliptically or circularly polarized | |
Sweep test of existing antenna | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $62,480.00 | $55,047.60 | N/A | $16,575.88 | N/A |
Total for all systems | $3,044,041.35 | $2,665,352.59 | N/A | $1,973,026.74 | N/A |
Primary Transmission Line | $62,480.00 | $55,047.60 | $16,575.88 | ||
Rigid Transmission Line - copper, 4 1/16" | $62,480.00 | $55,047.60 | N/A | $16,575.88 | N/A |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 4 1/16" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,136,398.17 | $715,398.17 | N/A | $715,398.17 | N/A |
Total for all systems | $3,044,041.35 | $2,665,352.59 | N/A | $1,973,026.74 | N/A |
Primary Tower GTOWER | $0.00 | $0.00 | $0.00 | ||
Primary Tower | $1,136,398.17 | $715,398.17 | $715,398.17 | ||
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $0.00 | N/A | $0.00 | N/A |
Move Existing STL Dish to New Tower | $21,664.70 | $21,664.70 | Please see Thin Air Communications, Inc. quote 3583_001_KOAA, plus tax and freight on invoice 3583-001-CO | $21,664.70 | N/A |
New tower | $693,733.47 | $693,733.47 | see Estimated Cost Justification KOAA-TV-480-Construct New Tower v2 | $693,733.47 | N/A |
Actual Information Description | File Name |
---|---|
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | Information not provided. |
Move Existing STL Dish to New Tower | |
New tower |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $318,721.05 | $369,320.59 | N/A | $207,608.24 | N/A |
Total for all systems | $3,044,041.35 | $2,665,352.59 | N/A | $1,973,026.74 | N/A |
Outside Professional Services | $318,721.05 | $369,320.59 | $207,608.24 | ||
New Tower design analysis | $6,000.00 | $6,000.00 | Engineering analysis of tower loading and design of the new tower. | $0.00 | due to mountain terrain actual is coming in higher than original estimate. |
KOAA repack 28 to repack 25 by Entravision | $60,328.55 | $60,328.55 | Additional consulting engineering expense due to Entravision wanting to occupy the KOAA repack channel 28. That would displace KOAA to channel 25 that is co-channel to KRDO 24. | $60,328.55 | Per submited Invoices |
Engineering study | $16,582.50 | $16,582.50 | Under estimated consulting engineering services needed for further review of feasibility to remain on Channel 30. | $16,582.50 | An additional survey needed for tower installation construction. |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $75,000.00 | N/A | $0.00 | N/A |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | $2,105.00 | $7,223.80 | Original estimate was low, but now corrected. | $7,223.80 | Actuals are coming in due to additional studies needed for FAA determination requests. |
ASR modification (prepare FCC Form 854) | $2,105.00 | $2,032.60 | The original predetermined cost was incorrect, it is correct now. | $2,032.60 | N/A |
NEPA Section 106 environmental review, if needed | $6,310.00 | $6,318.00 | NEPA study for the new tower construction located 50 foot away from the existing tower. | $6,318.00 | Actual costs came in a little more than original estimate based on billings from provider. An adjustment will be made to match to actual costs. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $3,500.00 | N/A | $0.00 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $25,000.00 | KOAA had to run the legal services twice due to the KCEC Denver Entravision being assigned channel 14 and the FCC requesting KOAA move from repack 28 to repack 25 | $2,055.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $8,660.50 | Please see Estimated Cost Justification KOAA-TV-550-Attorney - Construction Permit Application (Main) v0 | $8,660.50 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | $0.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $0.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $14,221.34 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $14,221.34 | N/A |
Project management of the transition | $94,010.00 | $99,675.00 | Widelity Strategic Support Quote | $64,907.65 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $22,778.30 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $22,778.30 | N/A |
RF Exposure Measurements | $21,050.00 | $17,500.00 | N/A | $2,500.00 | N/A |
Actual Information Description | File Name |
---|---|
New Tower design analysis | |
KOAA repack 28 to repack 25 by Entravision | |
Engineering study | |
Comprehensive coverage verification via field study, if needed | Information not provided. |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | |
ASR modification (prepare FCC Form 854) | |
NEPA Section 106 environmental review, if needed | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for new channel assignment and antenna development | |
Project management of the transition | |
Prepare and or review reimbursement form | |
RF Exposure Measurements |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $110,865.04 | $110,305.04 | N/A | $98,841.50 | N/A |
Total for all systems | $3,044,041.35 | $2,665,352.59 | N/A | $1,973,026.74 | N/A |
Other Expenses | $110,865.04 | $110,305.04 | $98,841.50 | ||
Develop and air announcement of upcoming channel change | $850.00 | $850.00 | N/A | $0.00 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $591.00 | $591.00 | Please see KOAA-TV Disposal Costs Budget Revision Justification Letter | $591.00 | N/A |
Non-zoning permits | $3,500.00 | $3,500.00 | N/A | $0.00 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | $0.00 | N/A |
DTV Medical Facility Notification | $11,550.00 | $11,000.00 | N/A | $4,212.00 | N/A |
Equipment Rental | $6,701.98 | $6,701.98 | Please see KOAA-TV Electronics Research, Inc. change order 35160C-3a - Rev and KOAA-TV Equipment Rental Budget Revision Justification Letter | $6,701.98 | N/A |
MVPD Notification of Channel Change | $5,593.60 | $5,593.60 | see Estimated Cost Justification KOAA-TV-610-MVPD Notifications v0 | $5,593.60 | N/A |
Equipment Storage | $2,860.00 | $2,860.00 | See Estimated Cost Justification KOAA-TV-610-Equipment Storage V0 | $2,860.00 | N/A |
Equipment Delivery and Handling Charges | $78,883.46 | $78,883.46 | Please see Estimated Cost Justification KOAA-TV-610-Equipment Delivery v1 | $78,882.92 | N/A |
Actual Information Description | File Name |
---|---|
Develop and air announcement of upcoming channel change | Information not provided. |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
Non-zoning permits | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
DTV Medical Facility Notification | |
Equipment Rental | |
MVPD Notification of Channel Change | |
Equipment Storage | |
Equipment Delivery and Handling Charges |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $3,044,041.35 | $2,665,352.59 | $1,973,026.74 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Sravan V Reddy , Reddy . Senior Director, General Accounting 03/29/2021 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Sravan V Reddy , Reddy . Senior Director, General Accounting 03/29/2021 |