Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
KMCE, INC. Doing Business As: KMCE, INC. |
135 Aviation Way #19 Watsonville, CA 95076 United States |
+1 (831) 724-0143 | manager@kmce.tv | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Bradley Jackson The Scotts Valley Group, INC. (dba 'Marcom') |
Marcom PO Box 5275 Santa Cruz, CA 95063 United States |
+1 (831) 818-7841 | brad@mar-com.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | This Station will share a common Transmitter Room with KMCE-LD FacID 35661. Significant cost savings on project will come from continuing the use of existing major components such as the existing Exciter & DTV Transmitter, STL, CODECS, MultiPlexer/PSIP. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Retune Existing |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | R-Scwartz |
Model | NV7030 | |
Year | 2012 | |
Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 2 kW |
Section | Question | Response |
---|---|---|
New Mask Filter | Does the transmitter require a new mask filter? | No |
New Exciter | Is a new exciter needed? | No |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Modify Transmitter's Location within Existing Room |
Station to move this existing Transmitter within room to accommodate second Station's Transmitter and the indoor RF filters/components of both Stations. |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 2 | |
Number of Panels | 8 | |
Design power capacity in use | 50.0 % | |
Lower Limit | 470.00 MHz | |
Upper Limit | 806.00 MHz | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | 4X2KBBU | |
Year | 2002 |
Facility ID | Call Sign |
---|---|
35661 | KMCE-LD |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 2 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 806.00 MHz | |
Design power capacity in use | 75.0 % | |
ERP: | 2.2 kW | |
Manufacturer | ||
Model | 2X1KBBU | |
Year | 2019 | |
Justification for New Antenna | Station's CH14 Construction Permit calls for pattern & direction that cannot be accommodated with previously shared antenna. Also, no RF Manufacturer would entertain the thought of making a CH14 Full-Service Mask Filter that would combine with a 2nd Freq. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Power Dividers | Does the panel antenna require power dividers? | Yes |
Number of Power Dividers | 1 | |
Cable Harness | Does the panel antenna require cable harness? | Yes |
Number of Cable Harnesses | 2 |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | Yes | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Air | |
Diameter | 3 inches | |
Number of parallel runs | 1 | |
Length | 250 feet per run |
Facility ID | Call Sign |
---|---|
35661 | KMCE-LD |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 250 feet per run | |
Justification for New Transmission Line | Per Station's CH14 Construction Permit, a new Antenna will be installed - Requiring a new RF Transmission Line and Power Divider-Jumpers. | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | Yes |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | No | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1238082 | |
Coordinates (NAD83) | Latitude (NAD83) | 36° 45' 21.9" N- |
Longitude (NAD83) | 121° 30' 09.8" W- | |
Overall Structure Height | 140.09 feet | |
Support Structure Height | 100.06 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 3077.06 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Crown Castle MU LLC | |
Date Constructed | 03/14/2004 |
Users |
---|
Microwave |
Mobile Provider |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Tower mapping and report for structural engineer |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 222 | |
Explanation | Station does not have the knowledge or qualified personnel necessary to undertake this project. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
Prepare Form 601 | Yes | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 15 | |
Justification | Engineer to be onsite to direct and complete successful work in relation to this Project: New Antenna Installation, New RF Transmission Line, move existing Transmitter within room, New Mask Filter, Interior RF 'plumbing' - Line Section, Patch Panel, etc. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
Mileage |
mileage to from site |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $279,935.00 | $84,000.00 | N/A | $53,643.75 | N/A |
Total for all systems | $511,660.66 | $286,347.11 | N/A | $139,430.86 | N/A |
Primary Transmitter NV7030 | $279,935.00 | $84,000.00 | $53,643.75 | ||
Transmitter Building Site Survey/Installation | $10,000.00 | $4,500.00 | N/A | $4,500.00 | N/A |
Modify Transmitter's Location within Existing Room | $22,125.00 | $22,125.00 | Estimate includes materials and consumables. | $22,125.00 | Actual hours |
Additional field engineering time, 10-30 days | $42,050.00 | $22,125.00 | Actual cost | $22,125.00 | Actual hours |
Channel 14 Mask Filter | $189,500.00 | $30,000.00 | N/A | $4,893.75 | N/A |
RF Consulting Engineer | $5,260.00 | $5,250.00 | N/A | $0.00 | N/A |
Retune - UHF and VHF - minor re-channel issues | $11,000.00 | $0.00 | Station's existing Exciter and Transmitter are frequency agile and we will not require these resources. | N/A | N/A |
Actual Information Description | File Name |
---|---|
Transmitter Building Site Survey/Installation | |
Modify Transmitter's Location within Existing Room | |
Additional field engineering time, 10-30 days | |
Channel 14 Mask Filter | |
RF Consulting Engineer | |
Retune - UHF and VHF - minor re-channel issues | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $17,155.00 | $15,958.81 | N/A | $7,958.81 | N/A |
Total for all systems | $511,660.66 | $286,347.11 | N/A | $139,430.86 | N/A |
Primary Antenna 2X1KBBU | $17,155.00 | $15,958.81 | $7,958.81 | ||
UHF Broadband panel antenna (per panel), horizontally-polarized | $3,500.00 | $4,208.81 | antenna and freight actual cost | $4,208.81 | actual cost plus freight |
Cable harness (each, for panel antenna system, if not included in antenna cost) | $2,000.00 | $1,000.00 | N/A | $0.00 | N/A |
Power Dividers (each, for panel antenna system, if not included in antenna cost) | $1,300.00 | $1,300.00 | N/A | $0.00 | N/A |
Side Mount antenna brackets | $4,625.00 | $3,750.00 | N/A | $3,750.00 | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $5,700.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
UHF Broadband panel antenna (per panel), horizontally-polarized | |
Cable harness (each, for panel antenna system, if not included in antenna cost) | |
Power Dividers (each, for panel antenna system, if not included in antenna cost) | |
Side Mount antenna brackets | |
Sweep test of transmission line and antenna |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $13,500.00 | $11,122.64 | N/A | $3,622.64 | N/A |
Total for all systems | $511,660.66 | $286,347.11 | N/A | $139,430.86 | N/A |
Primary Transmission Line | $13,500.00 | $11,122.64 | $3,622.64 | ||
Flexible Foam Transmission Line - dielectric, 1 5/8" | $6,000.00 | $3,622.64 | N/A | $3,622.64 | N/A |
Interior RF Systems: Inside RF system including switching, patch panels and dehydrators | $7,500.00 | $7,500.00 | 1-5/8" hard-line, EIA flanges, 90 degree elbows, line section, patch panel/switch assembly, etc. | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Flexible Foam Transmission Line - dielectric, 1 5/8" | |
Interior RF Systems: Inside RF system including switching, patch panels and dehydrators |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $77,190.00 | $63,500.00 | N/A | $14,000.00 | N/A |
Total for all systems | $511,660.66 | $286,347.11 | N/A | $139,430.86 | N/A |
Primary Tower TOWER | $77,190.00 | $63,500.00 | $14,000.00 | ||
Tower mapping and report for structural engineer | $21,000.00 | $18,500.00 | N/A | $0.00 | N/A |
Tower Rigging Short Tower (less than 500') | $56,190.00 | $45,000.00 | N/A | $14,000.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower mapping and report for structural engineer | |
Tower Rigging Short Tower (less than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $115,103.50 | $103,153.50 | N/A | $51,593.50 | N/A |
Total for all systems | $511,660.66 | $286,347.11 | N/A | $139,430.86 | N/A |
Outside Professional Services | $115,103.50 | $103,153.50 | $51,593.50 | ||
Additional Field Engineering Service, 15 Days | $22,500.00 | $22,500.00 | Estimated 15 days @ $1500 per day. | $0.00 | N/A |
Comprehensive coverage verification via field study, if needed | $52,600.00 | $24,500.00 | N/A | $0.00 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $496.00 | N/A | $496.00 | N/A |
Prepare Form 601 | $755.00 | $0.00 | N/A | $0.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $1,395.00 | N/A | $1,395.00 | N/A |
Prepare request for Special Temporary Authorization | $2,560.00 | $1,330.00 | actual sta costs | $1,330.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,050.00 | N/A | $0.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $3,622.50 | actual invoiced costs | $3,622.50 | Actual Invoiced cost |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | N/A | $0.00 | N/A |
Form 399 assistance or other Program Management costs | $2,000.00 | $2,000.00 | Estimated to be the same cost as other similar activities surrounding the work on Station's 399 Submission(s). | $2,000.00 | actual invoice cost |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | $0.00 | N/A |
Project management of the transition | $23,421.00 | $42,750.00 | Actual hours project management | $42,750.00 | based on actual hours spent on project management |
Actual Information Description | File Name |
---|---|
Additional Field Engineering Service, 15 Days | |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Prepare Form 601 | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for displacement application | |
Form 399 assistance or other Program Management costs | |
Prepare/ Review 399 reimbursement form | |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $8,777.16 | $8,612.16 | N/A | $8,612.16 | N/A |
Total for all systems | $511,660.66 | $286,347.11 | N/A | $139,430.86 | N/A |
Other Expenses | $8,777.16 | $8,612.16 | $8,612.16 | ||
Mileage | $1,244.16 | $1,244.16 | Mileage | $1,244.16 | N/A |
Equipment Storage | $2,448.00 | $2,448.00 | Cost of Local Storage. | $2,448.00 | Actual cost |
Disposal Costs (for equipment and other waste, net of any salvage value) | $2,250.00 | $2,250.00 | Station's Estimated Cost of Local Disposal Fees. | $2,250.00 | N/A |
Equipment Delivery and Handling Charges | $2,500.00 | $2,500.00 | Station's Estimated Cost of Local Equipment Delivery and Handling Charges. | $2,500.00 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $170.00 | N/A | $170.00 | N/A |
Actual Information Description | File Name |
---|---|
Mileage | |
Equipment Storage | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
Equipment Delivery and Handling Charges | |
FCC Filing Fees - Form 2100 license to cover application |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $511,660.66 | $286,347.11 | $139,430.86 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Shirley Jackson CFO 02/23/2021 |