FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
43847
Service:
DTV
Call Sign:
WMGT-TV
Channel:
30 (UHF)
File Number:
0000028245
FRN:
0006594303
Date Submitted:
02/19/2021

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

Morris Network Inc.

Doing Business As: WMGT-TV

Bobby Berry

301 POPLAR Street

MACON, GA 31201

United States

+1 (478) 745-4141 bberry@morrisnetwork.com Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Anne Goodwin Crump

Communications Counsel

Fletcher, Heald & HIldreth, P.L.C.

Anne Goodwin Crump

1300 N. 17th Street

Eleventh Floor

Arlington, VA 22209

United States

+1 (703) 812-0426 crump@fhhlaw.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan WMGT-TV Plans to remodel existing room that housed analog transmitter then replace its existing antenna and transmitter with new ones that will accommodate its new channel. In the interim it will use interim antenna from WCBI in phase 1

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Auxiliary Transmitter

Back to Top

Add Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use Backup
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model ranger 1000
Year 2000
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 1 kW

Auxiliary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Auxiliary (Backup)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model UAXTE-2R37
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 1.2 kW
Justification for New Transmitter old backup transmitter cannot be retuned to new channel

Auxiliary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) Yes
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Auxiliary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model TC121iD
Year 2006
Type Inductive Output Tube
IOT Power Type Single
Power Capacity 12 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model UAXTE-12R44
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 7.2 kW
Justification for New Transmitter The old transmitter is no longer supported and therefore cannot be re-tuned to new channel. While the FAQ's for this form instruct that this change should be listed as an upgrade, it actually is not, but rather a simple replacement. See Attachment.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) Yes
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 150 kVA
Rigid Conduit and Wiring Yes
Size 3 inches
Length 200.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 10 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 1100.0 square feet
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

site survey

Have transmitter manufacture do electrical drawings and floor plain

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Auxiliary Antenna

Back to Top

Add Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Auxiliary (Backup)
Description of Use backup
Ownership Owned
Owner N/A
Site N/A
Is this antenna currently shared with any other stations? No
Is this antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 48.0 kW
Manufacturer
Model ATW25H2-HTOU-40S
Year 1999

Auxiliary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Auxiliary (Backup)
Description of Use backup
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 10.0 kW
Manufacturer
Model SWEDL801/30
Year 2018
Justification for New Antenna old antenna will not re-tune to new channel

Auxiliary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Auxiliary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 110.0 kW
Manufacturer
Model CS-2050-A-22
Year 2006

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 90.1 kW
Manufacturer
Model SWCDS220M/30
Year 2018
Justification for New Antenna the current antenna cannot be retuned to the new channel 30

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? No

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? Terrain Constrained
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? No
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1060959
Coordinates (NAD83) Latitude (NAD83) 32° 45' 13.0" N-
Longitude (NAD83) 083° 33' 46.0" W-
Overall Structure Height 881.88 feet
Support Structure Height 836.93 feet
Ground Elevation Above Mean Sea Level (AMSL) 292.98 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner MORRIS NETWORK, INC. DBA = WMGT
Date Constructed 06/02/1987

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
52551 WPEZ FM

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for undocumented/poorly documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Terrain constrained
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Information not provided.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 1250
Explanation Station is one of a group of co-owned stations, all of which are subject to repack. there is no director of engineering and station has only IT engineer on staff. Co-ordination is needed for the entire group's transition in different phases of repack
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 2
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers No
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements Yes
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Additional legal fees

Additional legal fees for 399 forms and progress reports

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning Yes
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? No
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $976,777.26 $810,289.13 N/A $486,252.48 N/A
Total for all systems $2,109,558.05 $1,537,137.82 N/A $997,333.73 N/A
Primary Transmitter UAXTE-12R44 $836,377.26 $690,289.13 $400,571.83
Other -- Building Addition Size: 1100.0 $78,110.00 $78,110.00 TX BUILDING MODS AND STATE TAX $73,000.00 N/A
10 Ton system $38,900.00 $37,000.00 N/A $13,780.00 N/A
3" Rigid Conduit and Wiring (Cost per foot) $10,400.00 $0.00 N/A N/A N/A
Transformer 3 phase/480v - 150 KVA $25,550.00 $0.00 N/A $0.00 N/A
Switchgear - industrial 800 amp $38,200.00 $0.00 N/A N/A N/A
Service entrance 3 phase/800 amp/208 volt $14,400.00 $19,482.57 TNT quote is for electrical wiring of main and Backup transmitters including the 75kva transformer also includes electrical wiring for AC units $19,482.57 N/A
UHF - Air Cooled Solid State Transmitter 7.2 kW $277,077.26 $277,077.26 N/A $15,697.96 N/A
site survey $17,240.00 $17,240.00 N/A $17,232.00 N/A
UHF - Air Cooled Solid State Transmitter 10 - 12 kW $336,500.00 $261,379.30 ***System Notice: Estimate adjusted and locked because line has been superseded.*** $261,379.30 N/A
Auxiliary Transmitter UAXTE-2R37 $140,400.00 $120,000.00 $85,680.65
Service entrance 3 phase/800 amp/208 volt $14,400.00 $0.00 N/A N/A N/A
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW $126,000.00 $120,000.00 N/A $85,680.65 N/A

Components

Actual Information Description File Name
Other -- Building Addition Size: 1100.0

Component Description:
BUILDING ADDITION EXPLANATION COST LESS TO MODIFY BUILDING THAN BUILD NEW
Amount:
$73,000.00

Component Description:
Final installment on charges for modifications to transmitter building necessary to accommodate new transmitter for repacked channel.
Amount:
$36,500.00

Component Description:
50% DOWN PAYMENT TO START WORK
Amount:
$36,500.00
10 Ton system

Component Description:
two 5 ton air conditioners installed instead of one 10 ton because of redundancy and cost
Amount:
$13,780.00
3" Rigid Conduit and Wiring (Cost per foot) Information not provided.
Transformer 3 phase/480v - 150 KVA Information not provided.
Switchgear - industrial 800 amp Information not provided.
Service entrance 3 phase/800 amp/208 volt

Component Description:
Invoice for all electrical wiring in remodeled building for both transmitters, 75kva transformer and AC units
Amount:
$19,482.57
UHF - Air Cooled Solid State Transmitter 7.2 kW

Component Description:
final balance due
Amount:
$15,697.96
site survey

Component Description:
GATES SITE SURVEY INVOICE
Amount:
$17,232.00
UHF - Air Cooled Solid State Transmitter 10 - 12 kW

Component Description:
SECOND PAYMENT DUE ON MAIN TRANSMITTER
Amount:
$86,752.59

Component Description:
FINAL PAYMENT ON MAIN TRANSMITTER
Amount:
$87,874.12

Component Description:
final balance due with install and taxes
Amount:
$15,697.96

Component Description:
Invoice for 1/3 Downpayment on main transmitter and associated equipment and costs
Amount:
$86,752.59

Component Description:
One Third Down Payment Transmitter Equipment.
Amount:
$86,752.59

Component Description:
Gates Quote # Q-64742
Amount:
N/A
Service entrance 3 phase/800 amp/208 volt Information not provided.
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW

Component Description:
Gates Final Balance Due with Install and taxes
Amount:
$15,244.84

Component Description:
1/3 downpayment on auxiliary transmitter and associated expenses plus backup information
Amount:
$24,850.27

Component Description:
SECOND PAYMENT DUE ON BACKUP TRANSMITTER
Amount:
$24,850.27

Component Description:
aux transmitter quote # Q-64743
Amount:
N/A

Component Description:
1/3 down payment on aux transmitter
Amount:
$24,850.27

Component Description:
FINAL PAYMENT BACKUP TRANSMITTER with Change Order
Amount:
$20,735.27

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $114,068.29 $128,301.19 N/A $107,917.00 N/A
Total for all systems $2,109,558.05 $1,537,137.82 N/A $997,333.73 N/A
Primary Antenna SWCDS220M/30 $96,130.00 $110,692.90 $97,470.00
UHF - Lower Power Side Mount, One station antenna - medium power (50-200 kW), horizontally polarized $89,400.00 $104,292.90 see quote this antenna includes mounts,adapters and connectors to connect to existing line. also added GA state Tax of 7% shown on PO $97,470.00 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A N/A N/A
Auxiliary Antenna SWEDL801/30 $17,938.29 $17,608.29 $10,447.00
UHF - High Power, Side Mount, basic slot antenna, 8 - 10 kW input, horizontally polarized $11,208.29 $11,208.29 N/A $10,447.00 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A N/A N/A

Components

Actual Information Description File Name
UHF - Lower Power Side Mount, One station antenna - medium power (50-200 kW), horizontally polarized

Component Description:
Final payment due to ship main antenna
Amount:
$48,735.00

Component Description:
50% down payment due with order for main antenna WITH ADDED INFO
Amount:
$48,735.00
Sweep test of existing antenna Information not provided.
UHF - High Power, Side Mount, basic slot antenna, 8 - 10 kW input, horizontally polarized

Component Description:
Final payment due to ship Aux / Backup antenna
Amount:
$5,223.50

Component Description:
50% DOWN PAYMENT DUE WITH ORDER
Amount:
$5,223.50
Sweep test of existing antenna Information not provided.

Cost Information

Back to Top

Transmission Line

Information not provided.

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $605,300.00 $218,000.00 N/A $212,515.13 N/A
Total for all systems $2,109,558.05 $1,537,137.82 N/A $997,333.73 N/A
Primary Tower TOWER $605,300.00 $218,000.00 $212,515.13
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study $26,300.00 $25,000.00 N/A $20,168.00 There are duplicate entries here because the entry for 4SE previously submitted cannot be removed to add the additional information requested.
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $0.00 N/A N/A N/A
Minor tower reinforcement/modifications $158,000.00 $193,000.00 this total cost includes tower design and drafting for mods , tower mods , freight of steel for tower mods , removal and installation of both main and backup antennas $192,347.13 this total cost includes tower design and drafting for mods , tower mods , freight of steel for tower mods , removal and installation of both main and backup antennas

Components

Actual Information Description File Name
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study

Component Description:
Tower Mapping Service.
Amount:
$14,168.00

Component Description:
4SE invoice for structural analysis of how to come into compliance with ANSI-TIA 222-G. Design and drafting referenced in quote invoiced separately.
Amount:
$6,000.00

Component Description:
Tower mapping proposal CTC
Amount:
N/A

Component Description:
Tower Analysis
Amount:
$6,000.00
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) Information not provided.
Minor tower reinforcement/modifications

Component Description:
FREIGHT CHARGES FOR TOWER MOD STEEL
Amount:
$1,387.13

Component Description:
final payment tower mods and antenna installation
Amount:
$60,874.00

Component Description:
Tower Modification, Interim Antenna Installation.
Amount:
$65,086.00

Component Description:
Fees for Tower mod Design and drafting to meet G spec.
Amount:
$5,000.00

Component Description:
tower mods and antennas installed
Amount:
N/A

Component Description:
COMPLETION OF TOWER MODS INVOICE
Amount:
$60,000.00

Component Description:
Invoice for design and drafting of tower modifications to meet required building code with dates of work
Amount:
$5,000.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $343,010.00 $311,750.00 N/A $155,676.12 N/A
Total for all systems $2,109,558.05 $1,537,137.82 N/A $997,333.73 N/A
Outside Professional Services $343,010.00 $311,750.00 $155,676.12
Comprehensive coverage verification via field study, if needed $84,200.00 $65,000.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A $787.50 Estimated costs higher.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A $832.50 N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A N/A N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A N/A N/A
Prepare and or review reimbursement form $2,630.00 $10,500.00 The level of detail required, the number of unforeseen clarifications required, required modifications of bills, and the cumbersome nature of form completion and filing have added significantly to the costs associated with seeking expense reimbursement. $10,106.24 Legal fees for reimbursement assistance were underestimated due to complexity of form, difficulty of completion, level of detail and exactitude required, and time-consuming nature of responding to questions and resubmitting form.
Project management of the transition $197,500.00 $185,500.00 N/A $143,162.38 N/A
Additional legal fees $8,500.00 $8,500.00 N/A $787.50 N/A
RF Exposure Measurements $21,050.00 $15,000.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $7,360.00 $7,000.00 N/A N/A N/A

Components

Actual Information Description File Name
Comprehensive coverage verification via field study, if needed Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application

Component Description:
Legal advice and counsel and assistance with preparation of application for license to cover repack c.p.
Amount:
$675.00

Component Description:
Legal advice and assistance with preparation of license to cover repack c.p.
Amount:
$112.50
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
Legal advice and counsel concerning possible Form 2100 modification application
Amount:
$45.00

Component Description:
Attorney Fees for Form 2100 Construction Permit
Amount:
$337.50

Component Description:
Attorney Fees for Form 2100 Construction Permit
Amount:
$450.00
Prepare request for Special Temporary Authorization Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application Information not provided.
Perform engineering study for new channel assignment and antenna development Information not provided.
Prepare and or review reimbursement form

Component Description:
Assist in preparing and revising Form 399 and accompanying documentation of expenses
Amount:
$1,012.50

Component Description:
Provided advice and counsel concerning reimbursement process and information requested concerning expenses
Amount:
$112.50

Component Description:
Provide legal advice and assistance with seeking reimbursement of repack expenses.
Amount:
$112.50

Component Description:
Legal advice and assistance with requesting reimbursement of repack expenses
Amount:
$112.50

Component Description:
Legal advice and counsel in connection with seeking reimbursement of expenses
Amount:
$787.50

Component Description:
Legal advice and assistance in connection with completing and filing form requesting expense reimbursement
Amount:
$112.50

Component Description:
Legal advice and counsel in connection with seeking reimbursement of expenses
Amount:
$112.50

Component Description:
Legal advice and counsel regarding presentation of expenses for reimbursement
Amount:
$225.00

Component Description:
Assist in preparation of Form 399 reimbursement requests
Amount:
$821.25

Component Description:
Attorney Fees for Reimbursement Filings.
Amount:
$45.00

Component Description:
Assist with necessary steps in reimbursement process
Amount:
$112.50

Component Description:
Legal advice and assistance with seeking reimbursement of expenses
Amount:
$225.00

Component Description:
Legal advice and counsel in connection with requesting reimbursement of expenses
Amount:
$225.00

Component Description:
Legal advice and counsel in connection with seeking reimbursement of expenses
Amount:
$225.00

Component Description:
Assisted with reimbursement process
Amount:
$90.00

Component Description:
Legal advice and counsel regarding presentation of expenses for reimbursement
Amount:
$337.50

Component Description:
Assist in preparation and documentation of cost information for reimbursement request
Amount:
$202.50

Component Description:
Attorney Fees for Reimbursement Filings
Amount:
$1,057.50

Component Description:
Legal advice and counsel regarding presentation of expenses for reimbursement and apparent system errors
Amount:
$1,350.00

Component Description:
Assist in preparing and revising information related to expenses, updating Form 399, and responding to FCC questions regarding same
Amount:
$562.50

Component Description:
Legal advice and counsel in connection with seeking reimbursement of expenses
Amount:
$112.50

Component Description:
Legal advice and counsel regarding obtaining reimbursement of expenses
Amount:
$1,575.00

Component Description:
Attorney Fees for Reimbursement filings and charges for cost of FedEx to transmit Form 1876
Amount:
$577.49
Project management of the transition

Component Description:
April 2020 PM invoice
Amount:
$637.50

Component Description:
REVISED CSS LODGING INVOICE R19-0105L
Amount:
$600.00

Component Description:
REVISED CSS LODGING INVOICE RA18-0305L
Amount:
$75.00

Component Description:
Jan 2018 invoice for project management hours
Amount:
$1,575.00

Component Description:
WMGT PROJECT MANAGEMENT INVOICE
Amount:
$1,237.50

Component Description:
REVISED CSS LODGING INVOICE R18-0805L
Amount:
$1,950.00

Component Description:
DEC CSS invoice 20-1205 with names
Amount:
$1,387.50

Component Description:
PROJECT MANAGEMENT INVOICE WITH COVER LETTER AND NAMES ADDED, REQUESTED BY REVIEWER
Amount:
$1,905.00

Component Description:
REVISED CSS LODGING INVOICE R18-0205L
Amount:
$225.00

Component Description:
PROJECT MANAGEMENT HOURS JUNE 2017
Amount:
$1,591.50

Component Description:
PROJECT MANAGEMENT HOURS MAY 2017
Amount:
$3,160.50

Component Description:
REVISED PROJECT MANAGEMENT INVOICE with corrected FID requested by reviewer
Amount:
$3,698.47

Component Description:
FEB Project Management Invoice
Amount:
$1,312.50

Component Description:
REVISED PROJECT MANAGEMENT HOURS APRIL 2017
Amount:
$3,205.50

Component Description:
Oct. 2017 invoice for project management hours
Amount:
$6,487.50

Component Description:
feb 2018 invoice for project Management
Amount:
$8,887.50

Component Description:
CSS March 2019 invoice
Amount:
$1,875.00

Component Description:
Nov Project Management invoice
Amount:
$1,237.50

Component Description:
WMGT Aug. 2019 Project Management invoice 19-0805
Amount:
$1,612.50

Component Description:
WMGT July project management invoice 19-0705
Amount:
$1,687.50

Component Description:
Oct Project Management invoice
Amount:
$1,350.00

Component Description:
REVISED CSS LODGING INVOICE RA18-0505L
Amount:
$450.00

Component Description:
PROJECT MANAGEMENT OCT. 2018 INVOICE
Amount:
$1,612.50

Component Description:
DEC Project Management Invoice
Amount:
$1,275.00

Component Description:
JAN Project Management Invoice
Amount:
$1,237.50

Component Description:
AUG 2018 PROJECT MANAGEMENT HOURS
Amount:
$11,416.50

Component Description:
PROJECT MANAGEMENT INVOICE
Amount:
$1,800.00

Component Description:
CSS April 2019 invoice 19-0405
Amount:
$862.50

Component Description:
REVISED PROJECT MANAGEMENT INVOICE with names requested by reviewer
Amount:
$11,303.47

Component Description:
PROJECT MANAGEMENT INVOICE with names requested by reviewer
Amount:
$1,870.50

Component Description:
May 2019 Project Management invoice
Amount:
$1,687.50

Component Description:
PROJECT MANAGEMENT INVOICE with names requested by reviewer
Amount:
$312.00

Component Description:
WMGT PROJECT MANAGEMENT INVOICE
Amount:
$1,275.00

Component Description:
MAR Project Management Invoice
Amount:
$1,725.00

Component Description:
MARCH 2017 PROJECT MANAGEMENT HOURS
Amount:
$2,118.75

Component Description:
PROJECT MANAGEMENT INVOICE
Amount:
$187.50

Component Description:
Nov. 2018 CSS invoice with requested cover letter
Amount:
$13,464.47

Component Description:
WMGT Sept. 2019 Project Management invoice 19-0905
Amount:
$1,837.50

Component Description:
Dec. 2018 CSS invoice
Amount:
$1,950.00

Component Description:
JAN 2019 CSS Invoice
Amount:
$14,214.47

Component Description:
FEB 2019 CSS Invoice
Amount:
$1,537.50

Component Description:
SEPT 2018 PROJECT MANAGEMENT HOURS
Amount:
$11,133.97

Component Description:
Nov. 2017 invoice for project management hours
Amount:
$1,837.50

Component Description:
CSS JUNE 2020 PROJECT MANAGEMENT INVOICE
Amount:
$1,387.50

Component Description:
REVISED DATE CSS LODGING INVOICE R19-0605L
Amount:
$375.00

Component Description:
REVISED CSS LODGING INVOICE R17-1005L
Amount:
$150.00

Component Description:
REVISED CSS LODGING INVOICE R18-1105L
Amount:
$675.00

Component Description:
Dec.2017 invoice for project management hours
Amount:
$1,762.50

Component Description:
June 2019 Project Management invoice 19-0605
Amount:
$8,004.78
Additional legal fees

Component Description:
Assist with preparation of required quarterly transition progress report
Amount:
$112.50

Component Description:
Legal advice and counsel with regard to various required notices of channel change
Amount:
$112.50

Component Description:
Legal advice and counsel in connection with filing of required transition progress report
Amount:
$112.50

Component Description:
Assisted in preparation of repack transition plan progress report
Amount:
$112.50

Component Description:
Legal advice and counsel regarding filing of required transition progress report
Amount:
$112.50

Component Description:
Legal advice and counsel regarding filing of required transition progress report
Amount:
$112.50

Component Description:
Assist with preparation and filing of quarterly transition progress report
Amount:
$112.50
RF Exposure Measurements Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $70,402.50 $68,797.50 N/A $34,973.00 N/A
Total for all systems $2,109,558.05 $1,537,137.82 N/A $997,333.73 N/A
Other Expenses $70,402.50 $68,797.50 $34,973.00
MVPD Notification of Channel Change $2,087.50 $2,087.50 ACTUAL COAST $2,087.50 N/A
Develop and air announcement of upcoming channel change $5,400.00 $5,400.00 Develop on air announcements and billboard of upcoming channel change, including obtaining legal advice as to required content $5,337.50 N/A
Local Zoning $1,650.00 $1,650.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 N/A N/A N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,070.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $10,000.00 N/A $2,565.00 N/A
Equipment Delivery and Handling Charges $20,000.00 $20,000.00 N/A N/A N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $28,000.00 $28,000.00 clean out and disposal of old channel 40 transmitter and equipment $24,983.00 N/A
Non-zoning permits $75.00 $75.00 N/A N/A N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $190.00 N/A N/A N/A

Components

Actual Information Description File Name
MVPD Notification of Channel Change

Component Description:
Legal advice and counsel regarding required notifications to MVPD of repack channel change
Amount:
$112.50

Component Description:
MVPD NOTIFICATION INVOICE
Amount:
$1,975.00
Develop and air announcement of upcoming channel change

Component Description:
Legal advice and counsel with regard to required announcements to consumers of channel change
Amount:
$112.50

Component Description:
Legal advice and assistance in connection with developing and airing announcements to consumers of channel change
Amount:
$112.50

Component Description:
Local Media Outdoors invoice 851255
Amount:
$5,000.00

Component Description:
Legal advice and counsel in connection with on-air announcements to consumers of channel change and related requirements
Amount:
$112.50
Local Zoning Information not provided.
FCC Filing Fees - Form 2100 license to cover application Information not provided.
FCC Filing Fees - Form 2100 minor change CP application Information not provided.
DTV Medical Facility Notification

Component Description:
MEDICAL FACILITY NOTIFICATION
Amount:
$2,565.00
Equipment Delivery and Handling Charges Information not provided.
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
Clean out channel 40 transmitter and related equipment and load dumpsters for removal
Amount:
$24,983.00
Non-zoning permits Information not provided.
FCC Filing Fees - Special Temporary Authorization request Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $2,109,558.05 $1,537,137.82 $997,333.73

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. Yes
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Bobby Berry

Chief Operating Officer


02/19/2021

Certification

Back to Top
Section Question Response
Submission of Final Allocation or Accounting Information Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  2. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  3. The above-named entity certifies that all costs identified as "actual costs" herein accurately represent the costs actually paid by the above-named entity, including any discounts, refunds, or rebates.

  4. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  5. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  6. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Bobby Berry

Chief Operating Officer


02/19/2021