Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
New Albany Broadcasting Co. Inc. |
DAVID B. SMITH PO Box 2623 CLARKSVILLE, IN 47131 United States |
+1 (502) 584-2400 | DAVID@WKYITV.COM | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Greg Best Consulting Engineer Greg Best Consulting Inc. |
Greg Best 16100 Outlook Avenue Stilwell, KS 66085 United States |
+1 (816) 792-2913 | gbconsulting54@gmail.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | The site location must change because the new antenna will not fit on the existing tower. New equipment will be purchased & installed at the new site. See attached plan. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | Backup Xmtr | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | SC500UB | |
Year | 2005 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1.2 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Auxiliary (Backup) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | UAXTE-2 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.2 kW | |
Justification for New Transmitter | This transmitter replaces the existing backup Screen Service transmitter that is no longer supported. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 2 inches | |
Length | 50.0 feet | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | NV Series | |
Year | 1999 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1.2 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | UAXTE-2 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.2 kW | |
Justification for New Transmitter | The existing transmitter is no longer supported. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 2 inches | |
Length | 50.0 feet | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Transmitter Installation |
New xmtr system planning and removal of old xmtr equipment. |
RF SYSTEM |
RF system to switch between main & backup and RF combining system for WMYO-CD & WJYL-CD. |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | Andrew |
Type | Flexible Air | |
Diameter | 1 5/8 inches | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 350 feet per run |
Name | Description |
---|---|
Transmission line, antenna sweep |
Sweep of existing transmission line and antenna for potential use. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1028414 | |
Coordinates (NAD83) | Latitude (NAD83) | 38° 21' 55.2" N- |
Longitude (NAD83) | 085° 50' 24.2" W- | |
Overall Structure Height | 464.89 feet | |
Support Structure Height | 459.97 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 962.91 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | SBA GC Towers, LLC | |
Date Constructed | 01/25/1996 |
Facility ID | Call Sign | Service |
---|---|---|
38621 | WFPK | FM |
69113 | WUOL-FM | FM |
4258 | WFPL | FM |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Remove existing antenna and Line |
This task removes the existing equipment of antenna, T line, and xmtr at the existing site. |
Tower Structure Analysis |
Structure Analysis |
STL equipment removal and install. |
Task to remove existing STL equipment per lease terms and install minimum items at new location. |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 200 | |
Explanation | Provide project management & coordination between vendors to ensure project timeline and deliverables are met. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | No | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $446,820.00 | $385,420.00 | N/A | $236,599.78 | N/A |
Total for all systems | $660,720.00 | $526,210.00 | N/A | $321,768.37 | N/A |
Primary Transmitter UAXTE-2 | $255,770.00 | $268,420.00 | $184,630.64 | ||
RF SYSTEM | $56,220.00 | $56,220.00 | See Attached proposal for transmitter. This cost is one half of the combiner cost for WMYO-CD & WJYL-CD. The other half of the cost will be shown on the WJYL-CD 399. | $56,220.00 | N/A |
Transmitter Installation | $8,500.00 | $8,500.00 | Old xmtr removal planning & execution and new xmtr installation planning. | $8,242.50 | N/A |
2" Rigid Conduit and Wiring (Cost per foot) | $1,300.00 | $8,000.00 | The revised location has longer runs to the breaker panel and requires more labor than originally planned. | $7,699.00 | Due to the distance of wiring for the transmitters and the requirement for an independent meter, the labor and parts were more than expected. |
Switchgear - industrial 800 amp | $38,200.00 | $37,150.00 | N/A | $10,147.00 | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $126,000.00 | $133,000.00 | WMYO transmitter cost estimate per quote Q-83091. | $96,108.14 | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $25,550.00 | N/A | $6,214.00 | N/A |
Auxiliary Transmitter UAXTE-2 | $191,050.00 | $117,000.00 | $51,969.14 | ||
2" Rigid Conduit and Wiring (Cost per foot) | $1,300.00 | $1,300.00 | N/A | N/A | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $25,550.00 | N/A | N/A | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $37,150.00 | N/A | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $126,000.00 | $53,000.00 | N/A | $51,969.14 | The sales tax was accumulated in this final payment versus distributed among the other 2 payments and so was the freight cost. |
Actual Information Description | File Name |
---|---|
RF SYSTEM | |
Transmitter Installation | |
2" Rigid Conduit and Wiring (Cost per foot) | |
Switchgear - industrial 800 amp | |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | |
Transformer 3 phase/480v - 150 KVA | |
2" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Transformer 3 phase/480v - 150 KVA | Information not provided. |
Switchgear - industrial 800 amp | Information not provided. |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $5,000.00 | $5,000.00 | N/A | $0.00 | N/A |
Total for all systems | $660,720.00 | $526,210.00 | N/A | $321,768.37 | N/A |
Primary Transmission Line | $5,000.00 | $5,000.00 | $0.00 | ||
Transmission line, antenna sweep | $5,000.00 | $5,000.00 | Sweep of existing transmission line and antenna for future use. | $0.00 | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $121,800.00 | $37,600.00 | N/A | $26,927.19 | N/A |
Total for all systems | $660,720.00 | $526,210.00 | N/A | $321,768.37 | N/A |
Primary Tower GTOWER | $121,800.00 | $37,600.00 | $26,927.19 | ||
Remove existing antenna and Line | $20,000.00 | $20,000.00 | Estimate will be followed by quote for removal of all equipment at the present site. | $14,010.00 | N/A |
Tower Structure Analysis | $2,600.00 | $2,600.00 | Please see attached purchase orders and Vertical Structures invoice 20182473 & 20191268. | $2,600.00 | N/A |
Short Tower (less than 500') | $84,200.00 | $0.00 | Applicant is moving to an existing tower and combining into existing antenna so no tower expenses are expected. | N/A | N/A |
STL equipment removal and install. | $15,000.00 | $15,000.00 | N/A | $10,317.19 | N/A |
Actual Information Description | File Name |
---|---|
Remove existing antenna and Line | |
Tower Structure Analysis | |
Short Tower (less than 500') | Information not provided. |
STL equipment removal and install. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $66,520.00 | $84,970.00 | N/A | $51,841.40 | N/A |
Total for all systems | $660,720.00 | $526,210.00 | N/A | $321,768.37 | N/A |
Outside Professional Services | $66,520.00 | $84,970.00 | $51,841.40 | ||
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $3,680.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $4,210.00 | N/A | N/A | N/A |
Project management of the transition | $31,600.00 | $46,200.00 | Project management costs are higher because of the shift to the new location. | $36,831.90 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $0.00 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $1,272.00 | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $2,050.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,580.00 | N/A | $1,575.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $612.50 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $12,000.00 | Relocation for transmission system has required additional FCC filings and redesign of the transmission system parameters and equipment. | $11,550.00 | Change in system design due to WAVE site location has required redesign of transmission system including RF combiner. |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Project management of the transition | |
Prepare and or review reimbursement form | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $20,580.00 | $13,220.00 | N/A | $6,400.00 | N/A |
Total for all systems | $660,720.00 | $526,210.00 | N/A | $321,768.37 | N/A |
Other Expenses | $20,580.00 | $13,220.00 | $6,400.00 | ||
DTV Medical Facility Notification | $11,550.00 | $4,200.00 | N/A | $4,126.00 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $195.00 | N/A | N/A | N/A |
Non-zoning permits | $500.00 | $500.00 | Electrical Work permit. | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $500.00 | $500.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $2,000.00 | $2,000.00 | N/A | N/A | N/A |
Equipment Storage | $2,500.00 | $2,500.00 | N/A | N/A | N/A |
MVPD Notification of Channel Change | $3,000.00 | $3,000.00 | N/A | $2,274.00 | N/A |
Actual Information Description | File Name |
---|---|
DTV Medical Facility Notification | |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
Non-zoning permits | Information not provided. |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Equipment Delivery and Handling Charges | Information not provided. |
Equipment Storage | Information not provided. |
MVPD Notification of Channel Change |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $660,720.00 | $526,210.00 | $321,768.37 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | David Brian Smith , Sr. . Repack General Manager 02/19/2021 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | David Brian Smith , Sr. . Repack General Manager 02/19/2021 |