Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
WISN Hearst Television Inc. Doing Business As: WISN Hearst Television Inc. |
PO Box 1800 Raleigh, NC 27602 United States |
+1 (919) 839-0300 | shartzell@brookspierce.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | See attached document |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Sigma CD3200P2 | |
Year | 2001 | |
Type | Inductive Output Tube | |
IOT Power Type | Two | |
Power Capacity | 40 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTE-72 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 47.2 kW | |
Justification for New Transmitter | Existing IOT transmitter cannot be converted to post-transition channel, see GatesAir EOL and HTV IOT to Solid-State Justification statements. An IOT replacement is more expensive than proposed SS transmitter. See attached Comark IOT Transmitter quote. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | transmitter installation electrical service See attached quote | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Heating and Cooling | |
Size | 10 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 600.0 square feet | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Exterior Modifications |
Changes to ice shield, concrete pad and fencing to accommodate repack transmitter and associated equipment |
Shipping |
Transmitter shipping |
Change Order |
Changes in transmitter accessories & configuration |
RF Accessories |
Additional RF components required for transmitter |
Sales Tax |
transmitter sales tax |
Remote Control |
Remote Control equipment to integrated repack transmitter |
Installation incidentals |
supplies and equipment needed for transmitter installation |
Electrical Accessories |
Surge Protection required by manufacturer |
Transmitter de-install |
Remove old transmitter |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Auxiliary (Backup) | |
Description of Use | backup to main antenna | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this antenna currently shared with any other stations? | No | |
Is this antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 850.0 kW | |
Manufacturer | ||
Model | TFU-26GTH-R CT160 | |
Year | 2001 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Auxiliary (Backup) |
Description of Use | Interim/Aux | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Slot | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 24 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 698.00 MHz | |
Design power capacity in use | 65.0 % | |
Other Antenna Type | N/A | |
ERP: | 882.0 kW | |
Manufacturer | ||
Model | TFU-24WB-1-R C160 | |
Year | 2019 | |
Justification for New Antenna | Current antenna is channel specific and cannot be used on post-transition channel. Antenna must be replaced. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Broadband | |
Feed Line Size | 6 1/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Custom line section |
custom length transmission line to connect antenna to existing line |
Sales Tax |
antenna sales tax |
Shipping |
antenna shipping |
Line Reducer |
REDUCER 6-75 X 7-75 EIA CU. FOR ANTENNA INPUT |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | TFU-31ETT/VP-R 4C160 | |
Year | 2010 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 882.0 kW | |
Manufacturer | ||
Model | TFU-29ETT/VP-R 4C160 | |
Year | 2019 | |
Justification for New Antenna | Current antenna is channel specific and cannot be used on post-transition channel. Antenna must be replaced. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 6 1/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Shipping |
Antenna shipping |
Sales Tax |
antenna sales tax |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Auxiliary (Backup) | |
Description of Use | Auxiliary/Backup | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmission currently shared with any other stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | Dielectric |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | Broadband | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1000 feet per run |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1160 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1160 feet per run | |
Justification for New Transmission Line | Current transmission line segment length is not compatible with post-transition channel (28) and must be replaced. |
Name | Description |
---|---|
Sales Tax |
transmission line sales tax |
Additional Transmission line |
transmission line components needed to complete installation |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1035766 | |
Coordinates (NAD83) | Latitude (NAD83) | 43° 06' 42.0" N- |
Longitude (NAD83) | 087° 55' 42.0" W- | |
Overall Structure Height | 1107.93 feet | |
Support Structure Height | 1032.80 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 623.35 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | WISN Hearst Television Inc. | |
Date Constructed | 07/24/1955 |
Facility ID | Call Sign | Service |
---|---|---|
26609 | WRNW | FM |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Change Orders |
Change Orders associated with antenna installations |
Tower Consulting |
tower consulting and tower project management |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Number of Hours | N/A | |
Explanation | N/A | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Transmitter Site Survey |
Transmitter planning survey & transmitter building drawings |
Non-Catalog legal expenses |
Non-Catalog expenses for legal advice and services, including financial/reimbursement review, transition reporting, transition procedures, and other transition-related issues |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Contract Labor |
labor directly related to the station channel change |
in-house labor |
in-house labor directly related to station's repack |
Grounds Restoration |
Restore grounds around transmitter site after damage by heavy equipment. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,860,817.53 | $1,524,406.85 | N/A | $1,524,406.85 | N/A |
Total for all systems | $3,325,999.14 | $2,804,309.63 | N/A | $2,679,060.06 | N/A |
Primary Transmitter ULXTE-72 | $1,860,817.53 | $1,524,406.85 | $1,524,406.85 | ||
Transmitter de-install | $30,344.50 | $30,344.50 | Old transmitter removal costs | $30,344.50 | N/A |
Electrical Accessories | $13,430.49 | $13,430.49 | Manufacturer required surge protection and transformers | $13,430.49 | N/A |
Installation incidentals | $2,093.34 | $2,093.34 | per invoices | $2,093.34 | N/A |
Remote Control | $595.00 | $595.00 | per invoice and quote | $595.00 | N/A |
Sales Tax | $82,380.22 | $82,380.22 | transmitter sales tax per GatesAir invoices | $82,380.22 | N/A |
RF Accessories | $76,720.12 | $76,720.12 | Additional RF components required for transmitter operation and integration into current RF environment. | $76,720.12 | N/A |
Change Order | $46,640.57 | $46,640.57 | transmitter change orders | $46,640.57 | N/A |
Exterior Modifications | $15,051.54 | $15,051.54 | exterior changes to transmitter facility to accommodate repack transmitter equipment | $15,051.54 | N/A |
Other Electrical Service: transmitter installation electrical service See attached quote | $47,855.00 | $47,855.00 | per transmitter installation electrical service invoices | $47,855.00 | N/A |
10 Ton system | $60,500.00 | $0.00 | N/A | N/A | N/A |
Other -- Building Addition Size: 600.0 | $1,393.92 | $1,393.92 | Building modifications need for repack transmitter | $1,393.92 | N/A |
Shipping | $10,812.83 | $10,812.83 | Transmitter shipping | $10,812.83 | N/A |
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW | $1,473,000.00 | $1,197,089.32 | GatesAir quote sections A, B & E. Plus change orders | $1,197,089.32 | N/A |
Actual Information Description | File Name |
---|---|
Transmitter de-install | |
Electrical Accessories | |
Installation incidentals | |
Remote Control | |
Sales Tax | |
RF Accessories | |
Change Order | |
Exterior Modifications | |
Other Electrical Service: transmitter installation electrical service See attached quote | |
10 Ton system | Information not provided. |
Other -- Building Addition Size: 600.0 | |
Shipping | |
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $538,700.61 | $527,655.61 | N/A | $426,311.83 | N/A |
Total for all systems | $3,325,999.14 | $2,804,309.63 | N/A | $2,679,060.06 | N/A |
Primary Antenna TFU-29ETT/VP-R 4C160 | $337,453.65 | $335,438.65 | $244,880.87 | ||
Sales Tax | $16,704.00 | $16,704.00 | estimated sales tax based on the Wisconsin state and local sales tax rate of 5.6% | N/A | N/A |
Shipping | $12,219.65 | $12,219.65 | Antenna shipping per Dielectric invoices | $12,219.65 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $6,400.00 | N/A |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | $12,300.00 | $10,984.00 | N/A | $10,984.00 | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | $289,500.00 | $289,131.00 | Antenna price for comparable antenna per attached Dielectric quote | $215,277.22 | N/A |
Auxiliary Antenna TFU-24WB-1-R C160 | $201,246.96 | $192,216.96 | $181,430.96 | ||
Custom line section | $7,326.46 | $7,326.46 | Custom length line for antenna installation plus shipping | $7,323.46 | N/A |
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | $13,700.00 | $0.00 | Part of antenna | N/A | N/A |
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 882 kW input, directional,, horizontally polarized | $157,474.00 | $157,474.00 | auxiliary antenna with elbow complex - cost per Dielectric quote | $157,474.00 | Includes components not yet itemized |
Sweep test of existing antenna | $6,730.00 | $11,400.00 | two sweeps required due to timing issues | $11,400.00 | N/A |
Line Reducer | $2,100.00 | $2,100.00 | Required RF component for antenna installation. See Dielectric quote. | N/A | N/A |
Sales Tax | $8,683.00 | $8,683.00 | estimated antenna sales tax based on Wisconsin state sales tax rate | N/A | N/A |
Shipping | $5,233.50 | $5,233.50 | Shipping per Dielectric quote | $5,233.50 | N/A |
Actual Information Description | File Name |
---|---|
Sales Tax | Information not provided. |
Shipping | |
Sweep test of existing antenna | |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | |
Custom line section | |
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | Information not provided. |
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 882 kW input, directional,, horizontally polarized | |
Sweep test of existing antenna | |
Line Reducer | Information not provided. |
Sales Tax | Information not provided. |
Shipping |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $260,420.21 | $190,219.71 | N/A | $177,965.71 | N/A |
Total for all systems | $3,325,999.14 | $2,804,309.63 | N/A | $2,679,060.06 | N/A |
Primary Transmission Line | $260,420.21 | $190,219.71 | $177,965.71 | ||
Additional Transmission line | $13,846.21 | $13,846.21 | per Dielectric invoices | $13,846.21 | N/A |
Rigid Transmission Line - copper, 6 1/8" | $234,320.00 | $164,119.50 | N/A | $164,119.50 | N/A |
Sales Tax | $12,254.00 | $12,254.00 | estimated transmission line sales tax based on Wisconsin state and local sales tax rate of 5.6% | $0.00 | N/A |
Auxiliary Transmission Line | $0.00 | $0.00 | $0.00 | ||
null | $0.00 | $0.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Additional Transmission line | |
Rigid Transmission Line - copper, 6 1/8" | |
Sales Tax | Information not provided. |
null | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $417,019.69 | $441,354.66 | N/A | $441,354.16 | N/A |
Total for all systems | $3,325,999.14 | $2,804,309.63 | N/A | $2,679,060.06 | N/A |
Primary Tower TOWER | $417,019.69 | $441,354.66 | $441,354.16 | ||
Tall Tower (greater than 500') | $210,500.00 | $338,165.21 | contract price plus change order | $338,164.71 | N/A |
Change Orders | $18,606.69 | $18,606.69 | actual | $18,606.69 | N/A |
Tower Consulting | $3,613.00 | $3,613.00 | per tower consulting invoices | $3,613.00 | N/A |
Minor tower reinforcement/modifications | $158,000.00 | $61,469.76 | N/A | $61,469.76 | N/A |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $19,500.00 | N/A | $19,500.00 | N/A |
Actual Information Description | File Name |
---|---|
Tall Tower (greater than 500') | |
Change Orders | |
Tower Consulting | |
Minor tower reinforcement/modifications | |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $182,978.60 | $61,858.70 | N/A | $50,207.41 | N/A |
Total for all systems | $3,325,999.14 | $2,804,309.63 | N/A | $2,679,060.06 | N/A |
Outside Professional Services | $182,978.60 | $61,858.70 | $50,207.41 | ||
Non-Catalog legal expenses | $20,000.00 | $20,000.00 | Non-Catalog expenses for legal advice and services, including financial/reimbursement review, transition reporting, transition procedures, and other transition-related issues | $15,371.42 | N/A |
Transmitter Site Survey | $21,753.60 | $21,753.60 | Transmitter planning survey & transmitter building drawings quote attached | $21,753.60 | N/A |
RF Exposure Measurements | $21,050.00 | $0.00 | N/A | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $0.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $592.60 | N/A | $592.60 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | N/A | N/A |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | $4,210.00 | $4,000.00 | N/A | $2,575.20 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $1,999.43 | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $550.00 | N/A | $550.00 | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | $1,580.00 | $250.00 | N/A | $250.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $400.00 | N/A | $400.00 | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | $2,105.00 | $650.00 | N/A | $650.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $1,937.50 | N/A | $1,937.50 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $1,975.00 | N/A | $1,975.00 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $2,152.66 | N/A |
Actual Information Description | File Name |
---|---|
Non-Catalog legal expenses | |
Transmitter Site Survey | |
RF Exposure Measurements | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Prepare and or review reimbursement form |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $66,062.50 | $58,814.10 | N/A | $58,814.10 | N/A |
Total for all systems | $3,325,999.14 | $2,804,309.63 | N/A | $2,679,060.06 | N/A |
Other Expenses | $66,062.50 | $58,814.10 | $58,814.10 | ||
Grounds Restoration | $18,885.11 | $18,885.11 | per David J Frank Landscaping invoices | $18,885.11 | N/A |
in-house labor | $13,019.93 | $13,019.93 | per invoices | $13,019.93 | N/A |
Contract Labor | $4,209.46 | $4,209.46 | accounting labor directly related to the Spectrum Repack project | $4,209.46 | N/A |
MVPD Notification of Channel Change | $2,732.80 | $2,732.80 | see invoice | $2,732.80 | N/A |
Develop and air announcement of upcoming channel change | $0.00 | $0.00 | Attorney review to ensure FCC compliance | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | $1,110.00 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $2,485.20 | $2,485.20 | per invoices | $2,485.20 | N/A |
DTV Medical Facility Notification | $11,550.00 | $3,961.60 | N/A | $3,961.60 | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $200.00 | per FCC receipt | $200.00 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $670.00 | per receipts | $670.00 | N/A |
Equipment Storage | $11,540.00 | $11,540.00 | antenna storage per Dielectric invoices | $11,540.00 | N/A |
Actual Information Description | File Name |
---|---|
Grounds Restoration | |
in-house labor | |
Contract Labor | |
MVPD Notification of Channel Change | |
Develop and air announcement of upcoming channel change | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
DTV Medical Facility Notification | |
FCC Filing Fees - Special Temporary Authorization request | |
FCC Filing Fees - Form 2100 license to cover application | |
Equipment Storage |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $3,325,999.14 | $2,804,309.63 | $2,679,060.06 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | John Drain Hearst Television SVP Chief Financial Officer 02/10/2021 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Douglas Durkee Hearst Television Manager of Spectrum Repack 02/10/2021 |