Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
COCOLA BROADCASTING COMPANIES, LLC Doing Business As: COCOLA BROADCASTING COMPANIES, LLC |
Gary M. Cocola 706 W. HERNDON AVENUE FRESNO, CA 93650 United States |
+1 (559) 269-0425 | garyc@cocolatv.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | Station granted CP RF 32 to RF 14 and CP Mod to move to new transmit site; will install an existing RYMSA antenna for RF 14 from another site; needs a new transmitter and tx line to connect to the antenna being moved; shares tx building only; not facility |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | SSTVU-3000 | |
Year | 1998 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1.5 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TRN-U-1000-FA | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.4 kW | |
Justification for New Transmitter | Existing SBP transmitter currently operating on RF 32 cannot support the stations displaced channel on RF 14. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | Yes | |
Size | 1 inches | |
Length | 25.0 feet | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Contract Engineering |
Costs for contract engineering to install the new transmitter |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 150 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 150 feet per run | |
Justification for New Transmission Line | Station was granted a CP mod to move this facility to a new transmit site where they can use an existing RYMSA antenna but station will need to place new tx line for this installation; reflects overall savings for this displacement project. | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
Coordinates (NAD83) | Latitude (NAD83) | 36° 44' 45.4" N- |
Longitude (NAD83) | 119° 17' 02.5" W- | |
Overall Structure Height | 130.00 feet | |
Support Structure Height | 120.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 3350.00 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Cocola Broadcasting Companies, LLC | |
Date Constructed | 01/01/1989 |
Facility ID | Call Sign | Service |
---|---|---|
68406 | KFAZ-CA | DTV |
65762 | KMSG-LD | LPD |
20560 | KMCF-LD | LPT |
17831 | KJKZ-LP | LPT |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 90 | |
Explanation | Costs to manage material and contractors and associated tasks for this displacement project. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | Yes | |
Number of Days | 3 | |
Justification | Additional interference engineering for RF channel 14. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $286,760.00 | $94,550.00 | N/A | $81,300.00 | N/A |
Total for all systems | $438,857.50 | $214,095.00 | N/A | $85,125.00 | N/A |
Primary Transmitter TRN-U-1000-FA | $286,760.00 | $94,550.00 | $81,300.00 | ||
Contract Engineering | $5,000.00 | $5,000.00 | Contract engineering costs to install the new Anywave transmitter for RF channel 14. | N/A | N/A |
RF Consulting Engineer | $5,260.00 | $5,250.00 | N/A | N/A | N/A |
1" Rigid Conduit and Wiring | $500.00 | $500.00 | Electrical material required for new transmitter. | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $81,300.00 | Attached Anywave quote for this transmitter. | $81,300.00 | N/A |
Channel 14 -- Additional field engineering time, 3 days | $2,500.00 | $2,500.00 | Contract engineering labor for interference evaluation and analysis for RF channel 14. | N/A | N/A |
Channel 14 Mask Filter | $189,500.00 | $0.00 | Mask filter provided with Anywave transmitter quote. | N/A | N/A |
Actual Information Description | File Name |
---|---|
Contract Engineering | Information not provided. |
RF Consulting Engineer | Information not provided. |
1" Rigid Conduit and Wiring | Information not provided. |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | |
Channel 14 -- Additional field engineering time, 3 days | Information not provided. |
Channel 14 Mask Filter | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $3,600.00 | $0.00 | N/A | $0.00 | N/A |
Total for all systems | $438,857.50 | $214,095.00 | N/A | $85,125.00 | N/A |
Primary Transmission Line | $3,600.00 | $0.00 | $0.00 | ||
Flexible Foam Transmission Line - dielectric, 1 5/8" | $3,600.00 | $0.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $56,190.00 | $30,000.00 | N/A | $0.00 | N/A |
Total for all systems | $438,857.50 | $214,095.00 | N/A | $85,125.00 | N/A |
Primary Tower TOWER | $56,190.00 | $30,000.00 | $0.00 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $30,000.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $90,362.50 | $87,600.00 | N/A | $3,825.00 | N/A |
Total for all systems | $438,857.50 | $214,095.00 | N/A | $85,125.00 | N/A |
Outside Professional Services | $90,362.50 | $87,600.00 | $3,825.00 | ||
Project management of the transition | $9,495.00 | $9,450.00 | N/A | $850.00 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,700.00 | N/A | $1,075.00 | N/A |
Additional Field Engineering Service, 3 Days | $3,000.00 | $3,000.00 | Contract engineering costs for additional field engineering associated with RF channel 14 interference and analysis. | N/A | N/A |
RF Exposure Measurements | $12,100.00 | $12,000.00 | N/A | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $52,600.00 | $50,000.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,575.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,050.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,100.00 | N/A | N/A | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | N/A | N/A | N/A |
Form 399 assistance or other Program Management costs | $1,900.00 | $1,900.00 | Prepare 399 Eligibility and Broadcaster Relocation Document | $1,900.00 | N/A |
Actual Information Description | File Name |
---|---|
Project management of the transition | |
Prepare/ Review 399 reimbursement form | |
Additional Field Engineering Service, 3 Days | Information not provided. |
RF Exposure Measurements | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for displacement application | Information not provided. |
Form 399 assistance or other Program Management costs |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,945.00 | $1,945.00 | N/A | $0.00 | N/A |
Total for all systems | $438,857.50 | $214,095.00 | N/A | $85,125.00 | N/A |
Other Expenses | $1,945.00 | $1,945.00 | $0.00 | ||
Disposal Costs (for equipment and other waste, net of any salvage value) | $500.00 | $500.00 | Dispose of boxes, crates and packing material from the transmit site. | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $438,857.50 | $214,095.00 | $85,125.00 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Gary M Cocola Managing Member 12/16/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Gary M Cocola Managing Member 12/16/2020 |