Facility ID:
74211
Service:
DTV
Call Sign:
WMYD
Channel:
31 (UHF)
File Number:
0000027261
FRN:
0002710192
Date Submitted:
02/11/2021

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

SCRIPPS BROADCASTING HOLDINGS LLC

David Giles

312 WALNUT STREET

28TH FLOOR

CINCINNATI, OH 45202

United States

+1 (512) 977-3000 DAVE.GILES@SCRIPPS.COM Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Ray Thurber

Vice President Engineering

SCRIPPS BROADCASTING HOLDINGS LLC

Ray Thurber

312 Walnut St.

Cincinnati, OH 45202

United States

+1 (248) 827-9202 ray.thurber@scripps.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan WMYD must replace its main antenna and transmitter in order to move it its new channel. It will need to install interim facilities in order to be able to replace the main facility. See attached narrative for a more detailed explanation

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Auxiliary Transmitter

Back to Top

Add Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use Auxiliary
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Sigma CD 3
Year 1998
Type Inductive Output Tube
IOT Power Type Single
Power Capacity 23 kW

Auxiliary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Auxiliary (Backup)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model ULXTE-50
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 31.7 kW
Justification for New Transmitter Current transmitter is no longer supported by the manufacturer except for maintenance. Available parts are in very limited supply and in some cases are no longer available. Manufacturer says it cannot be re-tuned.

Auxiliary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring Yes
Size 2 inches
Length 100.0 feet
Other Electrical Service Yes
Description Auxiliary Transmitter - Install switch gear, transformers, wiring, and other necessary electrical work
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Heating and Cooling
Size 10 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 1500.0 square feet
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Auxiliary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Aux New Electrical Sub-Panels

New electrical sub-panels for aux transmitter

Aux Transmitter HVAC Ice Shield

HVAC Ice Shield for Auxiliary Transmitter

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Sigma CD 3
Year 2004
Type Inductive Output Tube
IOT Power Type Single
Power Capacity 23.0 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model ULXTE-80
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 50.1 kW
Justification for New Transmitter Current transmitter is no longer supported by the manufacturer except for maintenance. Available parts are in very limited supply and in some cases are no longer available. Manufacturer says it cannot be re-tuned.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service Yes
Description Necessary switchgear, transformer, conduit, wiring and fuse disconnects as quoted by electrical contractor for main and auxiliary transmitter.
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 500.0 kW
Manufacturer
Model TFU-23ETT-R CT3 DC
Year 2004

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 935.0 kW
Manufacturer
Model TFU-23ETT-R/VP CT3
Year 2019
Justification for New Antenna Existing main antenna is a coaxial slot antenna that is channel specific and cannot be reused on the new channel.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna?
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna?
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Michigan Sales Tax

Michigan Sales Tax on Antenna Expenses.

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? Yes
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Broadband Slot
Number of Stations Supported 4
Number of Panels/Bays 24
Lower Limit 470.00 MHz
Upper Limit 698.00 MHz
Design power capacity in use 52.8 %
Other Antenna Type N/A
ERP: 60.0 kW
Manufacturer
Model TFU-24 WB/VP-C160
Year 2018
Justification for New Antenna Candelabra will need extensive upgrades for repack of 3 stations 1 in phase 3 two in phase 8

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 3
Frequencies of channels supported RF channel
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? No
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? B
Feed Line Size 7 3/16 inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Enter a list of RF channel numbers.

RF Channel Number
31
20
21

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Interim Antenna Ice Shield

Interim Antenna Ice Shield

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Add Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Utilize Existing
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmission currently shared with any other stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer Dielectric
Type Rigid
Diameter 7 3/16 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1280 feet per run

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Primary Transmission Line - Additional Pieces

Primary Transmission Line - Additional Pieces

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Rigid
Diameter 7 3/16 inches
Segment Length Broadband
Other Segment Length
Number of parallel runs 1
Length 995 feet per run
Justification for New Transmission Line WMYD does not have an auxiliary transmission line and requires an interim transmission line to remain on air during the transition.

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Interim Transmission Line Nitrogen Generator

Interim Transmission Line Nitrogen Generator

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? Candelabra
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Yes
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1003429
Coordinates (NAD83) Latitude (NAD83) 42° 26' 52.5" N-
Longitude (NAD83) 083° 10' 23.1" W-
Overall Structure Height 1086.93 feet
Support Structure Height 1012.13 feet
Ground Elevation Above Mean Sea Level (AMSL) 662.07 feet
Structure Type GTOWER - Guyed Structure Used for Communication Purposes
Tower Owner American Tower, LLC
Date Constructed 06/11/1999

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
16817 WTVS DTV
72123 WWJ-TV DTV

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for tower with candelabra
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Candelabra
Helicopter Services Required Are helicopter services required? Yes

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Tower Permit Drawing Package

Tower Permit Drawing Package

Primary Antenna Installation

Tower Equipment and Rigging Costs - Primary Antenna Installation

Michigan Sales Tax

Michigan Sales Tax on Tower Expenses

Ground and Building Permit Drawing Package

Ground and Building Permit Drawing Package

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 595
Explanation Project manager needed to manage all work at transmitter site required to transition to new channel (both the main and interim facilities). With the size of the current engineering staff, WMYD cannot spare personnel to ensure these tasks are completed.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements Yes
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Michigan Sales Tax

Michigan Sales Tax on Professional Services

Site Survey

GatesAir performed a site survey to access changes to facility as necessary to transition to new channel including, power and HVAC requirements, available transmitter room space and existing antenna and transmission line RF characteristics at new channel.

RF System Test

RF System Test

ASR Modification

ASR Modification - prepare FCC form 854 - Attorney cost

Site Coordination

Site Coordination

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning Yes
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? No
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Employee Time

Time needed by Scripps corporate and WMYD employees to work on the transition to a new channel.

Interim Facility

American Tower (site owner) will provide the interim facility for WMYD. They will be taking care of purchase of antenna and transmission line and all necessary permits, structural analysis, rigging, and installation for a flat fee.

Michigan Sales Tax

Michigan Sales Tax on Other Expenses

ATC One-Time Tower Rental

ATC One-Time Tower Rental

Site Security

Site Security

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $2,340,689.42 $2,298,423.09 N/A $1,825,055.84 N/A
Total for all systems $4,833,054.28 $4,167,123.71 N/A $2,395,241.33 N/A
Primary Transmitter ULXTE-80 $1,351,574.77 $1,351,574.77 $922,926.39
Other Electrical Service: Necessary switchgear, transformer, conduit, wiring and fuse disconnects as quoted by electrical contractor for main and auxiliary transmitter. $103,230.00 $103,230.00 N/A $50,118.00 N/A
UHF - Liquid Cooled Solid State Transmitter 50.1 kW $1,247,485.77 $1,247,485.77 Please see GatesAir quotes Q-74235 and Q-73307, less amount already reimbursed in superseded category $871,949.39 N/A
UHF - Liquid Cooled Solid State Transmitter 31.7 kW $859.00 $859.00 ***System Notice: Estimate adjusted and locked because line has been superseded.***see Estimated Cost Justification WMYD-110-1st Primary Transmitter - UHF Liquid Cooled Solid State, 31.7 kW v0 $859.00 N/A
Auxiliary Transmitter ULXTE-50 $989,114.65 $946,848.32 $902,129.45
Aux Transmitter HVAC Ice Shield $1,333.33 $1,333.33 Please see WMYD American Towers Customer Project Cost Estimation $0.00 N/A
Aux New Electrical Sub-Panels $1,666.67 $1,666.67 Please see WMYD American Towers Customer Project Cost Estimation $0.00 N/A
Other -- Building Addition Size: 1500.0 $8,355.67 $8,355.67 Please see WMYD American Towers Customer Project Cost Estimation $0.00 N/A
10 Ton system $60,500.00 $19,167.00 Please see WMYD American Towers Customer Project Cost Estimation $0.00 N/A
Other Electrical Service: Auxiliary Transmitter - Install switch gear, transformers, wiring, and other necessary electrical work $62,647.50 $62,647.50 Please see Center Line Electric, Inc. quote dated 7-20-18 (costs split between primary and auxiliary transmitter electrical) $50,118.00 N/A
2" Rigid Conduit and Wiring (Cost per foot) $2,600.00 $1,666.67 Please see WMYD American Towers Customer Project Cost Estimation $0.00 N/A
UHF - Liquid Cooled Solid State Transmitter 31.7 kW $852,011.48 $852,011.48 Please see GatesAir quotes Q-73308, Q-80112, Q-80112-1, and Q-77062, plus actual freight and taxes on invoice US0325041 $852,011.45 N/A

Components

Actual Information Description File Name
Other Electrical Service: Necessary switchgear, transformer, conduit, wiring and fuse disconnects as quoted by electrical contractor for main and auxiliary transmitter.

Component Description:
Electrical Work
Amount:
$31,323.75

Component Description:
Electrical Work
Amount:
$6,264.75

Component Description:
Electrical Work
Amount:
$12,529.50
UHF - Liquid Cooled Solid State Transmitter 50.1 kW

Component Description:
"ULXTE-50 per Quote Q-73307"
Amount:
$271,943.24

Component Description:
A. Transmitter
Amount:
$209,247.34

Component Description:
Transmitter
Amount:
$13,251.60

Component Description:
WMYD Repack Transmitter Package
Amount:
$288,708.81

Component Description:
ULXTE-50
Amount:
$88,798.40
UHF - Liquid Cooled Solid State Transmitter 31.7 kW

Component Description:
SNMP Manager for V5 ARC PLUS Touch
Amount:
$539.00

Component Description:
Transmitter Delivery
Amount:
$320.00

Component Description:
Gates AIr WMYD 1st Installment Transmitter. Excluding the space in the invoice because site is not accepting it as valid. I was told to make it a space and submit
Amount:
$546,319.05
Aux Transmitter HVAC Ice Shield

Component Description:
5. WMYD-150-Auxiliary Transmitter - HVAC Ice Shield
Amount:
$666.66

Component Description:
5. WMYD-150-Auxiliary Transmitter - HVAC Ice Shield
Amount:
$333.33
Aux New Electrical Sub-Panels

Component Description:
4. WMYD-150-Auxiliary Transmitter - New Electrical Sub-Panels
Amount:
$833.33

Component Description:
4. WMYD-150-Auxiliary Transmitter - New Electrical Sub-Panels
Amount:
$416.66
Other -- Building Addition Size: 1500.0

Component Description:
3. WMYD-150-Auxiliary Transmitter - Other -- Building Addition Size: 1500.0
Amount:
$1,000.00

Component Description:
3. WMYD-150-Auxiliary Transmitter - Other -- Building Addition Size: 1500.0
Amount:
$500.00
10 Ton system

Component Description:
2. WMYD-150-Auxiliary Transmitter - 10 Ton system
Amount:
$9,583.50

Component Description:
2. WMYD-150-Auxiliary Transmitter - 10 Ton system
Amount:
$4,791.75
Other Electrical Service: Auxiliary Transmitter - Install switch gear, transformers, wiring, and other necessary electrical work

Component Description:
Electrical Work
Amount:
$12,529.50

Component Description:
CAPITAL CONTRIBUTION - DETROIT - OAK PARK T1
Amount:
$3,025.00

Component Description:
CAPITAL CONTRIBUTION - DETROIT - OAK PARK T1
Amount:
$1,512.50

Component Description:
WMYD-150-Auxiliary Transmitter - Other Electrical
Amount:
$6,264.75

Component Description:
WMYD-150-Auxiliary Transmitter - Other Electrical
Amount:
$31,323.75
2" Rigid Conduit and Wiring (Cost per foot)

Component Description:
1. WMYD-150-Auxiliary Transmitter - 2" Rigid Conduit and Wiring (Cost per foot)
Amount:
$833.33

Component Description:
1. WMYD-150-Auxiliary Transmitter - 2" Rigid Conduit and Wiring (Cost per foot)
Amount:
$416.66
UHF - Liquid Cooled Solid State Transmitter 31.7 kW

Component Description:
A. Transmitter
Amount:
$142,829.59

Component Description:
A. Transmitter
Amount:
$194,105.02

Component Description:
WMYD Repack Transmitter Package
Amount:
$257,610.18

Component Description:
ULXTE-50
Amount:
$257,466.66

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $482,876.14 $469,058.23 N/A $233,624.38 N/A
Total for all systems $4,833,054.28 $4,167,123.71 N/A $2,395,241.33 N/A
Interim Antenna TFU-24 WB/VP-C160 $172,162.14 $214,130.13 $0.00
Elbow complex, broadband, at antenna input, per 7 3/16. feedline (if needed) $16,850.00 $5,260.00 Please see WMYD American Towers Customer Project Cost Estimation $0.00 N/A
Sweep test of existing antenna $6,730.00 $3,333.33 Please see WMYD American Towers Customer Project Cost Estimation $0.00 N/A
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 60 - 65 kW input, directional,, elliptically or circularly polarized $63,637.33 $63,637.33 Please see WMYD American Towers Customer Project Cost Estimation $0.00 N/A
New combiner, cost per channel (without antenna) $84,200.00 $141,154.66 Please see WMYD American Towers Customer Project Cost Estimation $0.00 N/A
Interim Antenna Ice Shield $744.81 $744.81 Please see WMYD American Towers Customer Project Cost Estimation N/A N/A
Primary Antenna TFU-23ETT-R/VP CT3 $310,714.00 $254,928.10 $233,624.38
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized $289,500.00 $227,475.00 N/A $219,679.41 N/A
Sweep test of existing antenna $6,730.00 $12,969.10 see Estimated Cost Justification WMYD-210-Primary Antenna - Sweep Test v0 $12,969.10 N/A
Michigan Sales Tax $14,484.00 $14,484.00 N/A $975.87 N/A

Components

Actual Information Description File Name
Elbow complex, broadband, at antenna input, per 7 3/16. feedline (if needed)

Component Description:
9. WMYD-280-Interim Antenna - Elbow Complex
Amount:
$1,666.66

Component Description:
9. WMYD-280-Interim Antenna - Elbow Complex
Amount:
$833.33
Sweep test of existing antenna

Component Description:
8. WMYD-280-Interim Antenna - Sweep Test
Amount:
$1,666.66

Component Description:
8. WMYD-280-Interim Antenna - Sweep Test
Amount:
$833.33
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 60 - 65 kW input, directional,, elliptically or circularly polarized

Component Description:
6. WMYD-280-Interim Antenna - UHF - High Power, Side Mount, basic slot antenna
Amount:
$30,000.00

Component Description:
6. WMYD-280-Interim Antenna - UHF - High Power, Side Mount, basic slot antenna
Amount:
$15,000.00
New combiner, cost per channel (without antenna)

Component Description:
7. WMYD-280-Interim Antenna - New Combiner
Amount:
$17,500.00

Component Description:
7. WMYD-280-Interim Antenna - New Combiner
Amount:
$8,750.00
Interim Antenna Ice Shield Information not provided.
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized

Component Description:
FREIGHT, SHIPPING, AND HANDLING UPS NDA (EARLY)
Amount:
$12,184.42

Component Description:
UHF - HIGH POWER TOP MOUNT
Amount:
$95,538.75

Component Description:
RIGID TRANSMISSION LINE - COPPER
Amount:
$4,080.00

Component Description:
UHF - HIGH POWER TOP MOUNT (200 - 1,000 KW)
Amount:
$107,876.24

Component Description:
Invoice moved to correct budget category.
Amount:
N/A
Sweep test of existing antenna

Component Description:
Other
Amount:
$12,235.00

Component Description:
MI Sales Tax- Invoice 491036
Amount:
$734.10
Michigan Sales Tax

Component Description:
MI Sales Tax - Invoice 479009
Amount:
$244.80

Component Description:
MI Sales Tax- Invoice 502008
Amount:
$731.07

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $355,292.67 $118,566.34 N/A $19,980.00 N/A
Total for all systems $4,833,054.28 $4,167,123.71 N/A $2,395,241.33 N/A
Interim Transmission Line $335,312.67 $98,586.34 $0.00
Interim Transmission Line Nitrogen Generator $3,977.67 $3,977.67 Please see WMYD American Towers Customer Project Cost Estimation N/A N/A
Rigid Transmission Line - copper, 7 3/16" broadband $331,335.00 $94,608.67 Please see WMYD American Towers Customer Project Cost Estimation $0.00 N/A
Primary Transmission Line $19,980.00 $19,980.00 $19,980.00
Primary Transmission Line - Additional Pieces $19,980.00 $19,980.00 Please see Dielectric order confirmation 1198002 $19,980.00 N/A

Components

Actual Information Description File Name
Interim Transmission Line Nitrogen Generator Information not provided.
Rigid Transmission Line - copper, 7 3/16" broadband

Component Description:
10. WMYD-380-Interim Transmission Line
Amount:
$35,488.33

Component Description:
10. WMYD-380-Interim Transmission Line
Amount:
$17,744.16
Primary Transmission Line - Additional Pieces

Component Description:
WMYD-310-Primary Transmission Line - Additional Pieces
Amount:
$9,705.00

Component Description:
Additional Pieces
Amount:
$8,745.00

Component Description:
WMYD-310-Primary Transmission Line - Additional Pieces
Amount:
$1,530.00

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $846,297.00 $471,297.00 N/A $203,307.00 N/A
Total for all systems $4,833,054.28 $4,167,123.71 N/A $2,395,241.33 N/A
Primary Tower GTOWER $846,297.00 $471,297.00 $203,307.00
Structural engineering tower load study for a documented tower with candelabra $20,000.00 $19,000.00 N/A $0.00 N/A
Minor tower reinforcement/modifications $158,000.00 $150,000.00 N/A $0.00 N/A
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $55,000.00 per American Towers LLC quote Detroit-Oak Park $0.00 N/A
Tower Helicopter Lift $43,400.00 $43,400.00 Please see the attached ERI Proposal 20180322-479, the invoices WMYD-53376 and # 53262 and the PO #3003033483 $43,400.00 N/A
Michigan Sales Tax $34,590.00 $34,590.00 N/A N/A N/A
Ground and Building Permit Drawing Package $4,700.00 $4,700.00 Please see WMYD American Towers Customer Project Cost Estimation $0.00 N/A
Tower Permit Drawing Package $4,700.00 $4,700.00 Please see WMYD American Towers Customer Project Cost Estimation $0.00 N/A
Primary Antenna Installation $159,907.00 $159,907.00 see Estimated Cost Justification WMYD-410-Existing Primary Tower - Tower Equipment and Rigging Costs - Primary Antenna Installation v0 $159,907.00 N/A

Components

Actual Information Description File Name
Structural engineering tower load study for a documented tower with candelabra

Component Description:
14. WMYD-410-Existing Primary Tower - Tower Load Study, Documented Tower with Candelabra
Amount:
$7,299.83

Component Description:
14. WMYD-410-Existing Primary Tower - Tower Load Study, Documented Tower with Candelabra
Amount:
$3,649.91
Minor tower reinforcement/modifications

Component Description:
15. WMYD-410-Existing Primary Tower - Minor Tower Reinforcement/Modifications
Amount:
$17,500.16

Component Description:
15. WMYD-410-Existing Primary Tower - Minor Tower Reinforcement/Modifications
Amount:
$8,750.08
Complex Tower (includes, for example, those with candelabras and/or stacked antennas)

Component Description:
11. WMYD-410-Existing Primary Tower - Tower Rigging, Complex Tower
Amount:
$27,500.00

Component Description:
11. WMYD-410-Existing Primary Tower - Tower Rigging, Complex Tower
Amount:
$13,750.00

Component Description:
American Tower 1st installment
Amount:
$97,901.75
Tower Helicopter Lift

Component Description:
WEATHER DAY (4/6/19) HELICOPTER LIFT
Amount:
$43,400.00
Michigan Sales Tax Information not provided.
Ground and Building Permit Drawing Package

Component Description:
17. WMYD-410-Existing Primary Tower - Ground and Building Permit Drawing Package
Amount:
$2,350.00

Component Description:
17. WMYD-410-Existing Primary Tower - Ground and Building Permit Drawing Package
Amount:
$1,175.00
Tower Permit Drawing Package

Component Description:
WMYD-410-Existing Primary Tower - Tower Permit Drawing Package
Amount:
$2,350.00

Component Description:
16. WMYD-410-Existing Primary Tower - Tower Permit Drawing Package
Amount:
$1,175.00
Primary Antenna Installation

Component Description:
ANTENNA INSTALLATION
Amount:
$79,793.50

Component Description:
WMYD-410-Existing Primary Tower - Tower Equipment and Rigging Costs - Primary Antenna Installation
Amount:
$320.00

Component Description:
Antenna Installation
Amount:
$79,793.50

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $181,800.00 $184,245.00 N/A $99,813.70 N/A
Total for all systems $4,833,054.28 $4,167,123.71 N/A $2,395,241.33 N/A
Outside Professional Services $181,800.00 $184,245.00 $99,813.70
Project management of the transition $94,010.00 $99,675.00 see Estimated Cost Justification WMYD-510-Project Management v0 $81,904.70 N/A
Site Coordination $2,500.00 $2,500.00 Please see WMYD American Towers Customer Project Cost Estimation $0.00 N/A
RF System Test $5,000.00 $5,000.00 Please see WMYD American Towers Customer Project Cost Estimation N/A N/A
Site Survey $17,684.00 $17,684.00 N/A $17,684.00 N/A
Michigan Sales Tax $6,386.00 $6,386.00 N/A N/A N/A
RF Exposure Measurements $21,050.00 $20,000.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A N/A N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $4,000.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A N/A N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,500.00 N/A $225.00 N/A
ASR Modification $250.00 $250.00 Please see WMYD American Towers Customer Project Cost Estimation $0.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A N/A N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A N/A N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A

Components

Actual Information Description File Name
Project management of the transition

Component Description:
Project Management
Amount:
$6,419.95

Component Description:
Project Management
Amount:
$680.00

Component Description:
Project Management
Amount:
$5,928.05

Component Description:
Electrical Survey Meeting
Amount:
$448.00

Component Description:
Project Management
Amount:
$5,357.65

Component Description:
FOR SERVICES RENDERED
Amount:
$150.00

Component Description:
Project Management
Amount:
$3,092.20

Component Description:
Project Management
Amount:
$650.30

Component Description:
FCC Repack
Amount:
$450.00

Component Description:
Project Management
Amount:
$4,050.15

Component Description:
Project Management
Amount:
$2,010.20

Component Description:
WMYD - Preparation of STA Application for Interim Operation
Amount:
$375.00

Component Description:
Project Management
Amount:
$93.55

Component Description:
Project Management
Amount:
$4,836.65

Component Description:
Project Management
Amount:
$5,370.55

Component Description:
FOR SERVICES RENDERED
Amount:
$75.00

Component Description:
18. WMYD-510-Project Management
Amount:
$4,740.00

Component Description:
18. WMYD-510-Project Management
Amount:
$2,370.00

Component Description:
Project Management
Amount:
$1,974.00

Component Description:
Project Management
Amount:
$4,184.55

Component Description:
FOR SERVICES RENDERED
Amount:
$225.00

Component Description:
Project management
Amount:
$4,410.30

Component Description:
WMYD - Interference Studies of Interim Facility for STA.
Amount:
$2,700.00

Component Description:
Project Management
Amount:
$64.95

Component Description:
Project Management
Amount:
$5,412.20

Component Description:
FOR SERVICES RENDERED
Amount:
$75.00

Component Description:
Project Management
Amount:
$4,342.45

Component Description:
WMYD 387
Amount:
$75.00

Component Description:
Project Management
Amount:
$3,253.95

Component Description:
Project Management
Amount:
$373.30

Component Description:
Misc. communications with scrap yards and labor to preocess old antenna
Amount:
$1,480.00

Component Description:
Project Management
Amount:
$7,190.95

Component Description:
Project Management
Amount:
$6,155.80
Site Coordination

Component Description:
20. WMYD-590-Other Professional Service Fees - Site Coordination
Amount:
$1,250.00

Component Description:
20. WMYD-590-Other Professional Service Fees - Site Coordination
Amount:
$625.00
RF System Test Information not provided.
Site Survey

Component Description:
Field Service
Amount:
$17,684.00
Michigan Sales Tax Information not provided.
RF Exposure Measurements Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees - Negotiation of lease and other matters for shared locations Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare request for Special Temporary Authorization

Component Description:
WMYD-530-RF Eng - Special Temporary Authorization
Amount:
$225.00
ASR Modification

Component Description:
19. WMYD-590-Other Professional Service Fees - ASR Modification
Amount:
$125.00

Component Description:
19. WMYD-590-Other Professional Service Fees - ASR Modification
Amount:
$62.50
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare and or review reimbursement form Information not provided.
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Perform engineering study for new channel assignment and antenna development Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $626,099.05 $625,534.05 N/A $13,460.41 N/A
Total for all systems $4,833,054.28 $4,167,123.71 N/A $2,395,241.33 N/A
Other Expenses $626,099.05 $625,534.05 $13,460.41
Site Security $2,500.00 $2,500.00 Please see WMYD American Towers Customer Project Cost Estimation $0.00 N/A
ATC One-Time Tower Rental $57,600.00 $57,600.00 Please see WMYD American Towers Customer Project Cost Estimation $0.00 N/A
Michigan Sales Tax $21,356.00 $21,356.00 N/A N/A N/A
Interim Facility $315,933.00 $315,933.00 N/A $1,620.56 N/A
Employee Time $125,000.00 $125,000.00 N/A N/A N/A
MVPD Notification of Channel Change $5,130.05 $5,130.05 see Estimated Cost Justification WMYD-610-MVPD Notifications v0 $5,130.05 N/A
Develop and air announcement of upcoming channel change $5,000.00 $5,000.00 N/A $171.00 N/A
Equipment Delivery and Handling Charges $6,500.00 $6,500.00 N/A N/A N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $25,000.00 $25,000.00 N/A $480.00 N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $190.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 N/A N/A N/A
Non-zoning permits $25,000.00 $25,000.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A $6,058.80 N/A
Local Zoning $25,000.00 $25,000.00 N/A $0.00 N/A

Components

Actual Information Description File Name
Site Security

Component Description:
12. WMYD-610-Site Security
Amount:
$1,250.00

Component Description:
12. WMYD-610-Site Security
Amount:
$625.00
ATC One-Time Tower Rental

Component Description:
13. WMYD-610-ATC One-Time Tower Rental
Amount:
$28,800.00

Component Description:
13. WMYD-610-ATC One-Time Tower Rental
Amount:
$14,400.00
Michigan Sales Tax Information not provided.
Interim Facility

Component Description:
Low Loss Flexible LMR-400 Outdoor Rated Coax Cable Double Shielded
Amount:
$1,620.56
Employee Time Information not provided.
MVPD Notification of Channel Change

Component Description:
MVPD Notification Services
Amount:
$5,130.05
Develop and air announcement of upcoming channel change

Component Description:
Services and Applications: Labor
Amount:
$171.00
Equipment Delivery and Handling Charges Information not provided.
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
Supervise antenna removal to scrapyard
Amount:
$480.00
FCC Filing Fees - Special Temporary Authorization request Information not provided.
FCC Filing Fees - Form 2100 license to cover application Information not provided.
Non-zoning permits Information not provided.
DTV Medical Facility Notification

Component Description:
DTV Notification Service
Amount:
$6,058.80
Local Zoning

Component Description:
21. WMYD-610-Local Zoning
Amount:
$375.00

Component Description:
21. WMYD-610-Local Zoning
Amount:
$187.50

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $4,833,054.28 $4,167,123.71 $2,395,241.33

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Sravan V Reddy , Reddy .

Senior Director, General Accounting


02/11/2021

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Sravan V Reddy , Reddy .

Senior Director, General Accounting


02/11/2021