Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
GRAY TELEVISION LICENSEE, LLC Doing Business As: WAVE TV |
4370 PEACHTREE ROAD, NE ATLANTA, GA 30319 United States |
+1 (404) 504-9828 | robert.folliard@gray.tv | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | Install interim antenna/ Line Remove top mounted antenna and install new antenna. Connect to existing dual broadband lines Install new main and backup transmitters. Combiner, Line, Antenna and tower systems cost divided 50% with WLKY |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | Emergency Backup | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Ranger | |
Year | 2009 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1.1 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Auxiliary (Backup) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | UAXTE-2R 37 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.2 kW | |
Justification for New Transmitter | Existing transmitter can not be retuned EOL letter attached |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Electrical drawings and other electrical work required for Auxiliary transmitter operation | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Sigma | |
Year | 2003 | |
Type | Inductive Output Tube | |
IOT Power Type | Single | |
Power Capacity | 30 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTE-50 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 30.05 kW | |
Justification for New Transmitter | Existing transmitter can not be retuned Headroom analysis attached |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Electrical drawings and other electrical work required for Primary transmitter operation | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Transmitter Installation |
Primary Transmitter Installation |
Primary Transmitter - Additional Parts |
Primary Transmitter - Additional Parts |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 2 | |
Number of Panels | 51 | |
Design power capacity in use | 50.0 % | |
Lower Limit | 545.00 MHz | |
Upper Limit | 695.00 MHz | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | ABBP14H4-HTOC5-26/51 | |
Year | 2003 |
Facility ID | Call Sign |
---|---|
53939 | WLKY |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | Yes | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Broadband Panel | |
Number of Stations Supported | 2 | |
Number of Panels/Bays | 14 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 605.00 MHz | |
Design power capacity in use | 50.0 % | |
Other Antenna Type | N/A | |
ERP: | 890.0 kW | |
Manufacturer | ||
Model | TUM30-AP-S4-14/56H-R-2-T | |
Year | 2019 | |
Justification for New Antenna | Existing antenna can not be retuned Sweep data and ERI response attached |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 2 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | Yes | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Broadband | |
Feed Line Size | 7 3/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
RF Channel Number |
---|
14 |
36 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | Yes | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Slot | |
Number of Stations Supported | 2 | |
Number of Panels/Bays | 24 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 680.00 MHz | |
Design power capacity in use | 100.0 % | |
Other Antenna Type | N/A | |
ERP: | 680.0 kW | |
Manufacturer | ||
Model | TFU-WB24 | |
Year | 2019 | |
Justification for New Antenna | Transition side mount antenna needed to enable removal of existing top mount antenna and installation of new repack channel capable antenna. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | Yes | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | Andrew |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Other Diameter | N/A | |
Segment Length | Broadband | |
Other Segment Length | N/A | |
Number of parallel runs | 2 | |
Length | 1000 feet per run |
Facility ID | Call Sign |
---|---|
53939 | WLKY |
Name | Description |
---|---|
Transmission Line - Other Expenses Not Listed - Nitrogen for Transmission Line |
Nitrogen required to dry transmission line |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Segment Length | Broadband | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 950 feet per run | |
Justification for New Transmission Line | Interim during new antenna installation |
Name | Description |
---|---|
Interim Transmission Line Other Expenses |
Other expenses required for operation of interim transmission line |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1230057 | |
Coordinates (NAD83) | Latitude (NAD83) | 38° 22' 08.4" N- |
Longitude (NAD83) | 085° 49' 47.6" W- | |
Overall Structure Height | 960.95 feet | |
Support Structure Height | 899.92 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 982.93 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | P & B Towers LLC | |
Date Constructed | 03/11/2015 |
Facility ID | Call Sign | Service |
---|---|---|
53939 | WLKY | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | Yes |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 595 | |
Explanation | Pattern analysis Antenna Spec Transmitter Spec Building drawings Installation Supervision Accounting Internal Legal | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | No | |
Address transition timing and coordination issues w/ other stations and wireless providers | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Security |
Armed security provided by vendor to the equipment shelter site |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,240,429.85 | $1,214,658.90 | N/A | $978,540.23 | N/A |
Total for all systems | $3,441,103.31 | $3,754,814.53 | N/A | $2,686,037.65 | N/A |
Primary Transmitter ULXTE-50 | $1,049,867.35 | $1,092,979.60 | $921,843.53 | ||
Other Electrical Service: Electrical drawings and other electrical work required for Primary transmitter operation | $812.50 | $812.50 | Please see WAVE Primary Transmitter - Other Electrical Service Budget Revision Justification Letter | $812.50 | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $6,368.46 | Per Estimated Cost Justification WAVE-110-1st Primary Transmitter - 3 Phase, 480 V, 150 KVA Transformer v0 Per GatesAir Quote Q-73547 (estimates is the quoted amount minus the amount already reimbursed under the primary transmitter category) | $6,368.46 | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $36,300.00 | N/A | $9,243.41 | N/A |
Transmitter Installation | $37,988.00 | $37,988.00 | Please see WAVE Primary Transmitter - Installation Budget Revision Justification Letter | $37,988.00 | N/A |
Primary Transmitter - Additional Parts | $316.85 | $316.85 | Please see Estimated Cost Justification WAVE-110-1st Primary Transmitter - Additional Parts v0 | $316.84 | N/A |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW | $947,000.00 | $1,011,193.79 | see Estimated Cost Justification WAVE-110-1st Primary Transmitter - UHF Liquid Cooled Solid State, 21-31 kW v0 | $867,114.32 | N/A |
Auxiliary Transmitter UAXTE-2R 37 | $190,562.50 | $121,679.30 | $56,696.70 | ||
Other Electrical Service: Electrical drawings and other electrical work required for Auxiliary transmitter operation | $812.50 | $812.50 | Please see WAVE Auxiliary Transmitter - Other Electrical Service Budget Revision Justification Letter | $812.50 | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $24,300.00 | N/A | N/A | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $36,300.00 | N/A | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $126,000.00 | $60,266.80 | Quote attached (GA-00021721) | $55,884.20 | N/A |
Actual Information Description | File Name |
---|---|
Other Electrical Service: Electrical drawings and other electrical work required for Primary transmitter operation | |
Transformer 3 phase/480v - 150 KVA | |
Switchgear - industrial 800 amp | |
Transmitter Installation | |
Primary Transmitter - Additional Parts | |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW | |
Other Electrical Service: Electrical drawings and other electrical work required for Auxiliary transmitter operation | |
Transformer 3 phase/480v - 150 KVA | Information not provided. |
Switchgear - industrial 800 amp | Information not provided. |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,158,960.00 | $1,377,628.37 | N/A | $1,034,146.78 | N/A |
Total for all systems | $3,441,103.31 | $3,754,814.53 | N/A | $2,686,037.65 | N/A |
Interim Antenna TFU-WB24 | $157,180.00 | $156,850.00 | $6,400.00 | ||
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $6,400.00 | N/A |
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 680 kW input, directional,, horizontally polarized | $150,450.00 | $150,450.00 | Dielectric quote attached | N/A | N/A |
Primary Antenna TUM30-AP-S4-14/56H-R-2-T | $1,001,780.00 | $1,220,778.37 | $1,027,746.78 | ||
New combiner, cost per channel (without antenna) | $84,200.00 | $495,700.47 | Please see Estimated Cost Justification WAVE-210-Primary Antenna - New Combiner v0 | $482,639.28 | N/A |
Sweep test of existing antenna | $6,730.00 | $25,600.00 | Estimated Cost Justification WAVE-210-Primary Antenna - Sweep Test v0 | $11,840.00 | N/A |
UHF - High Power Top Mount (200-1000 kW), Two Station broadband panel antenna, elliptically or circularly polarized | $768,000.00 | $519,750.00 | Please see WAVE Primary Antenna revised 700083CMZ-3.pdf | $478,954.60 | N/A |
Elbow complex, broadband, at antenna input, per 7 3/16. feedline (if needed) | $16,850.00 | $30,623.40 | See Estimated Cost Justification WAVE-210-Primary Antenna - Elbow Complex V0 | $30,623.40 | N/A |
Combiner output splitting/switching for dual feed lines, if applicable | $126,000.00 | $149,104.50 | See Estimated Cost Justification WAVE-210-Primary Antenna - Combiner Output Splitting Switching for Dual Lines V0 | $23,689.50 | N/A |
Actual Information Description | File Name |
---|---|
Sweep test of existing antenna | |
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 680 kW input, directional,, horizontally polarized | Information not provided. |
New combiner, cost per channel (without antenna) | |
Sweep test of existing antenna | |
UHF - High Power Top Mount (200-1000 kW), Two Station broadband panel antenna, elliptically or circularly polarized | |
Elbow complex, broadband, at antenna input, per 7 3/16. feedline (if needed) | |
Combiner output splitting/switching for dual feed lines, if applicable |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $247,351.38 | $168,263.18 | N/A | $27,087.25 | N/A |
Total for all systems | $3,441,103.31 | $3,754,814.53 | N/A | $2,686,037.65 | N/A |
Interim Transmission Line | $220,650.00 | $141,561.80 | $2,308.77 | ||
Interim Transmission Line Other Expenses | $250.00 | $250.00 | Please see WAVE Interim Transmission Line Other Expenses Budget Revision Justification Letter | $250.00 | N/A |
Rigid Transmission Line - copper, 6 1/8" broadband | $220,400.00 | $141,311.80 | Quote attached | $2,058.77 | N/A |
Primary Transmission Line | $26,701.38 | $26,701.38 | $24,778.48 | ||
Transmission Line - Other Expenses Not Listed - Nitrogen for Transmission Line | $26,701.38 | $26,701.38 | see Estimated Cost Justification WAVE-310-Primary Transmission Line - Other Expenses Not Listed - Nitrogen for Transmission Line v3 | $24,778.48 | N/A |
Actual Information Description | File Name |
---|---|
Interim Transmission Line Other Expenses | |
Rigid Transmission Line - copper, 6 1/8" broadband | |
Transmission Line - Other Expenses Not Listed - Nitrogen for Transmission Line |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $495,100.00 | $661,776.00 | N/A | $470,861.50 | N/A |
Total for all systems | $3,441,103.31 | $3,754,814.53 | N/A | $2,686,037.65 | N/A |
Primary Tower GTOWER | $495,100.00 | $661,776.00 | $470,861.50 | ||
Structural engineering tower load study for well documented tower | $12,600.00 | $12,000.00 | N/A | $8,662.50 | N/A |
Minor tower reinforcement/modifications | $158,000.00 | $150,000.00 | N/A | N/A | N/A |
Tower Helicopter Lift | $114,000.00 | $114,000.00 | Please see attached Tower King II, Inc. Proposal C-19-010-2 | $114,000.00 | N/A |
Tall Tower (greater than 500') | $210,500.00 | $385,776.00 | Please See Estimated Cost Justification WAVE-410-Existing Primary Tower - Tower Rigging, Tall Tower v0 | $348,199.00 | N/A |
Actual Information Description | File Name |
---|---|
Structural engineering tower load study for well documented tower | |
Minor tower reinforcement/modifications | Information not provided. |
Tower Helicopter Lift | |
Tall Tower (greater than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $207,870.00 | $248,896.00 | N/A | $121,759.81 | N/A |
Total for all systems | $3,441,103.31 | $3,754,814.53 | N/A | $2,686,037.65 | N/A |
Outside Professional Services | $207,870.00 | $248,896.00 | $121,759.81 | ||
Prepare request for Special Temporary Authorization | $2,050.00 | $1,500.00 | N/A | $800.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | $370.83 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $2,950.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $3,526.84 | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $80,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $3,500.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $471.00 | Please see WAVE Attorney Other Matters Budget Revision Justification Cover Letter | $471.00 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $0.00 | N/A |
Project management of the transition | $94,010.00 | $144,675.00 | Widelity Strategic Support Quote | $113,641.14 | N/A |
Actual Information Description | File Name |
---|---|
Prepare request for Special Temporary Authorization | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $91,392.08 | $83,592.08 | N/A | $53,642.08 | N/A |
Total for all systems | $3,441,103.31 | $3,754,814.53 | N/A | $2,686,037.65 | N/A |
Other Expenses | $91,392.08 | $83,592.08 | $53,642.08 | ||
Security | $3,386.26 | $3,386.26 | Armed security provided by vendor to the equipment shelter site. Please see multiple invoices. | $3,386.26 | N/A |
Develop and air announcement of upcoming channel change | $2,850.00 | $2,850.00 | estimate for on air rescan announcement production. Quote attached | N/A | N/A |
Equipment Storage | $30,500.00 | $30,500.00 | Estimate for Dielectric on site antenna storage Dielectric letter attached | $5,842.20 | N/A |
Equipment Delivery and Handling Charges | $40,256.38 | $40,256.38 | see Estimated Cost Justification WAVE-610-Equipment Delivery and Handling v5 | $38,231.44 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $2,849.44 | $2,849.44 | see Estimated Cost Justification WAVE-610-Disposal Costs v2 | $2,432.18 | N/A |
MVPD Notification of Channel Change | $0.00 | $0.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $3,750.00 | Group quote attached | $3,750.00 | N/A |
Actual Information Description | File Name |
---|---|
Security | |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Storage | |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
MVPD Notification of Channel Change | Information not provided. |
DTV Medical Facility Notification |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $3,441,103.31 | $3,754,814.53 | $2,686,037.65 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Robert J. Folliard , III . Assistant Secretary 11/30/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Robert J. Folliard , III . Assistant Secretary 11/30/2020 |