Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
UNIVISION TUCSON LLC Doing Business As: UNIVISION TUCSON LLC |
Christopher G. Wood 5999 CENTER DRIVE LOS ANGELES, CA 90045 United States |
+1 (310) 348-3600 | CWOOD@UNIVISION.NET | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Theodore Stoner VP Distribution Technology Strategy Univision Management Company |
Theodore Stoner 9405 NW 41st Street Miami, FL 33178 United States |
+1 (513) 608-0308 | tstoner@univision.net |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Commence operation on channel 36 using temporary antenna installed by KHRR, using existing transmitter and new mask filter. Replace existing antenna. Cut over to new antenna and remove temporary antenna. See attached Implementation Plan document. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Retune Existing |
Use | Primary (Main) | |
Ownership | Owned | |
Owner | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | Rohde & Schwarz |
Model | TMU9-1 | |
Year | 2015 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 0.6 kW |
Section | Question | Response |
---|---|---|
New IOT Tubes | Number of Tubes (including accessories) needed | N/A |
New Mask Filter | ||
Power | 1.5 kW | |
Other Power | N/A | |
New Exciter | Is a new exciter needed? | No |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Class A |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 10.0 kW | |
Manufacturer | ||
Model | RD8UB | |
Year | 2001 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Class A |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | TLP-12M/VP | |
Year | 2017 | |
Justification for New Antenna | Newly assigned channel is outside the 38-48 design range of the existing antenna. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Rent Temporary | |
Ownership | Leased | |
Owner | NBC Universal | |
Is antenna shared? | Yes | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 2 | |
Number of Panels/Bays | 10 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 860.00 MHz | |
Design power capacity in use | 43.0 % | |
Other Antenna Type | N/A | |
ERP: | 8.9 kW | |
Manufacturer | ||
Model | TUA-C2-5/10H-1-S | |
Year | 2018 | |
Justification for New Antenna | Maintain continuity of operation of KHRR and KUVE-CD during replacement of existing main antennas |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Flexible Foam | |
Diameter | 7/8 inches | |
Segment Length | N/A | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 100 feet per run | |
Justification for New Transmission Line | Connection to temporary antenna, from KUVE-CD transmitter room to that of KHRR, to maintain continuity of operation from cutover date until existing antenna is replaced. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1002407 | |
Coordinates (NAD83) | Latitude (NAD83) | 32° 24' 54.0" N- |
Longitude (NAD83) | 110° 42' 57.9" W- | |
Overall Structure Height | 258.86 feet | |
Support Structure Height | 217.85 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 8494.32 feet | |
Structure Type | LTOWER - Lattice Tower | |
Tower Owner | American Tower, LLC | |
Date Constructed | 01/01/1988 |
Facility ID | Call Sign | Service |
---|---|---|
30601 | KHRR | DTV |
Users |
---|
K239CF |
K232FD |
KPCE-LP |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Tower Project Management |
ATC fee for management of tower work |
Site Permit Drawings |
ATC fee for drawing package supporting permit applications |
Tower Permit Drawings |
ATC fee for drawing package supporting permit applications |
Section | Question | Response |
---|---|---|
Construct New Tower | Use | Interim |
Description of Use | N/A | |
Height | 197.00 feet | |
Justification for New Tower | Maintain continuity of operation during replacement of antenna by hosting temporary antenna |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Removal of Existing Standby Antenna, Crate and Ship |
Removal of Existing standby antenna to be shipped to a separate location |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 80 | |
Explanation | Univision stations are only staffed for daily station operations and minor equipment changes, major projects are contracted out externally. The large volume of work associated with repack schedule requires using external project management resources. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
ATC Meeting Fee |
ATC fee for on-site coordination meeting |
Transition timing and coordination |
Address transition timing and coordination issues with other stations and wireless |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | No | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | No | |
Does this relocation require MVPD Notification of a Channel Change? | No |
Name | Description |
---|---|
Tower Lessor Administration |
Tower lessor's fee for administration of antenna change & lease modification |
Station Coordination |
Coordination and transition planning with all stations at the site |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $108,230.00 | $15,910.77 | N/A | $7,580.31 | N/A |
Total for all systems | $736,224.00 | $400,789.24 | N/A | $242,354.20 | N/A |
Primary Transmitter TMU9-1 | $108,230.00 | $15,910.77 | $7,580.31 | ||
UHF and VHF - minor banding issues | $105,200.00 | $10,000.00 | N/A | $7,580.31 | N/A |
1.5 kW mask filter | $3,030.00 | $5,910.77 | per Estimated Cost Justification KUVE-CD-110-1st Primary Transmitter - Retune Existing Transmitter - 1.5 kW Mask Filter v0, Justifying Quote - KUVE-CD Radio Frequency Systems #20063995; Justifying Invoice - KUVE-CD Radio Frequency Systems 16435048 | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
UHF and VHF - minor banding issues | |
1.5 kW mask filter | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $155,260.00 | $62,223.00 | N/A | $46,899.31 | N/A |
Total for all systems | $736,224.00 | $400,789.24 | N/A | $242,354.20 | N/A |
Interim Antenna TUA-C2-5/10H-1-S | $122,230.00 | $25,696.00 | $19,296.00 | ||
Interim antenna rental and installation - Cost will depend on antenna size and height and/or complexity of tower. | $115,500.00 | $19,296.00 | see Estimated Cost Justification KUVE-CD-280-Interim Antenna - Antenna Rental and Installation v0 | $19,296.00 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
UHF – Broadband Panel, Side Mount Auxiliary/Interim, 9 horizontally polarized | $0.00 | $0.00 | N/A | N/A | N/A |
Primary Antenna TLP-12M/VP | $33,030.00 | $36,527.00 | $27,603.31 | ||
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $3,656.78 | N/A |
UHF - Lower Power Side Mount, Class A One Station antenna -- basic | $26,300.00 | $30,127.00 | UHF - ANTENNA SIDE MOUNT, ELLIPTICALLY POLARIZED, DIRECTIONAL, TLP-12M/VP FOR CH36/34. Price total for Antenna is $21,927 (expansion portion excluded). Freight is $8,200. | $23,946.53 | N/A |
Actual Information Description | File Name |
---|---|
Interim antenna rental and installation - Cost will depend on antenna size and height and/or complexity of tower. | |
Sweep test of existing antenna | Information not provided. |
UHF – Broadband Panel, Side Mount Auxiliary/Interim, 9 horizontally polarized | Information not provided. |
Sweep test of existing antenna | |
UHF - Lower Power Side Mount, Class A One Station antenna -- basic |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,100.00 | $1,000.00 | N/A | $0.00 | N/A |
Total for all systems | $736,224.00 | $400,789.24 | N/A | $242,354.20 | N/A |
Interim Transmission Line | $1,100.00 | $1,000.00 | $0.00 | ||
Flexible Foam Transmission Line - dielectric, 7/8" | $1,100.00 | $1,000.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $379,004.00 | $152,382.00 | N/A | $54,368.00 | N/A |
Total for all systems | $736,224.00 | $400,789.24 | N/A | $242,354.20 | N/A |
Interim Tower | $98,604.00 | $72,444.00 | $38,830.00 | ||
Removal of Existing Standby Antenna, Crate and Ship | $14,404.00 | $14,404.00 | Please see attached International Tower Inc Proposal #KUVE032618 and Univision PO 53502 | $14,404.00 | N/A |
New tower | $0.00 | $0.00 | Existing tower (ATC #4 at Tucson Mountain) | N/A | N/A |
Short Tower (less than 500') | $84,200.00 | $58,040.00 | Total of fees per attached ATC Tower #4 cost spreadsheet | $24,426.00 | N/A |
Primary Tower LTOWER | $280,400.00 | $79,938.00 | $15,538.00 | ||
Tower Permit Drawings | $4,700.00 | $4,700.00 | See attached ATC Tower 3 cost spreadsheet | N/A | N/A |
Site Permit Drawings | $4,700.00 | $4,700.00 | See attached ATC Tower #3 cost spreadsheet | N/A | N/A |
Tower Project Management | $2,500.00 | $2,500.00 | See ATC Tower 3 cost spreadsheet | N/A | N/A |
Short Tower (less than 500') | $84,200.00 | $27,500.00 | N/A | $0.00 | N/A |
Minor tower reinforcement/modifications | $158,000.00 | $25,000.00 | N/A | N/A | N/A |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $15,538.00 | see Estimated Cost Justification KUVE-CD-410-Existing Primary Tower - Tower Mapping, Undocumented Tower V0 | $15,538.00 | N/A |
Actual Information Description | File Name |
---|---|
Removal of Existing Standby Antenna, Crate and Ship | |
New tower | Information not provided. |
Short Tower (less than 500') | |
Tower Permit Drawings | Information not provided. |
Site Permit Drawings | Information not provided. |
Tower Project Management | Information not provided. |
Short Tower (less than 500') | |
Minor tower reinforcement/modifications | Information not provided. |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $73,635.00 | $150,333.47 | N/A | $133,506.58 | N/A |
Total for all systems | $736,224.00 | $400,789.24 | N/A | $242,354.20 | N/A |
Outside Professional Services | $73,635.00 | $150,333.47 | $133,506.58 | ||
Project management of the transition | $12,640.00 | $113,870.97 | KUVE-CD Widelity Strategic Support Quote | $113,870.97 | Please see submitted invoices. |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $1,000.00 | N/A | $243.45 | N/A |
Transition timing and coordination | $2,512.50 | $2,512.50 | N/A | $2,512.49 | N/A |
ATC Meeting Fee | $2,512.50 | $2,512.50 | See attached ATC Tower #3 cost estimate | $2,512.49 | N/A |
RF Exposure Measurements | $21,050.00 | $12,500.00 | N/A | $8,953.68 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $2,000.00 | N/A | $1,984.50 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | $279.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $2,500.00 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $1,500.00 | N/A | $1,500.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $1,462.50 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $187.50 | Please see KUVE-CD RF Eng - New Channel Study Budget Justification Cover Letter | $187.50 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Project management of the transition | |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Transition timing and coordination | |
ATC Meeting Fee | |
RF Exposure Measurements | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare request for Special Temporary Authorization | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Prepare and or review reimbursement form | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $18,995.00 | $18,940.00 | N/A | $0.00 | N/A |
Total for all systems | $736,224.00 | $400,789.24 | N/A | $242,354.20 | N/A |
Other Expenses | $18,995.00 | $18,940.00 | $0.00 | ||
Tower Lessor Administration | $9,480.00 | $9,480.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $5,000.00 | $5,000.00 | See attached ATC Tower #3 cost estimate | N/A | N/A |
Non-zoning permits | $375.00 | $375.00 | See attached ATC Tower #3 cost estimate | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,070.00 | N/A | N/A | N/A |
Station Coordination | $2,500.00 | $2,500.00 | Please see the attached ATC invoice # 460211209 | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $736,224.00 | $400,789.24 | $242,354.20 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jose Franchi VP Finance 11/16/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jose Franchi VP Finance 11/16/2020 |