Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
WCBI-TV, LLC Doing Business As: WCBI-TV, LLC |
Bobby Berry 201 Poplar Street Macon, GA 31201 United States |
+1 (478) 745-4141 | bberry@morrisnetwork.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Anne Goodwin Crump Communications Counsel Fletcher, Heald & Hildreth, P.L.C. |
Anne Goodwin Crump 1300 N. 17th Street Eleventh Floor Arlington, VA 22209 United States |
+1 (703) 812-0426 | crump@fhhlaw.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | WCBI-TV plans to replace its existing antenna and transmitter with new ones that will accommodate its new channel. In the interim, it will connect its existing transmitter to a new interim antenna. The interim antenna will be reused for other stations. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | DCX Millenium | |
Year | 2002 | |
Type | Inductive Output Tube | |
IOT Power Type | Single | |
Power Capacity | 20 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTE-24 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 24 kW | |
Justification for New Transmitter | The old transmitter is no longer supported and therefore cannot be retuned. While the Form 399 FAQ's instruct that this replacement is an upgrade, it actually is not, but rather a simple replacement. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 4 inches | |
Length | 190.0 feet | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Transmitter Site Survey |
Transmitter site & building layout including electrical drawings |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 708.0 kW | |
Manufacturer | ||
Model | SWEDBM32HSI35 | |
Year | 2016 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 599.0 kW | |
Manufacturer | ||
Model | SWEDBM32PNHS/27 | |
Year | 2017 | |
Justification for New Antenna | The current antenna cannot be retuned to work on Channel 27. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 12 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 608.00 MHz | |
Design power capacity in use | 55.0 % | |
Other Antenna Type | N/A | |
ERP: | 240.0 kW | |
Manufacturer | ||
Model | SWDDP4-4-4-0 | |
Year | 2017 | |
Justification for New Antenna | Interim antenna needed to keep station on air during transition - will be reused for 5 other stations in ownership group in later transition phases. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Installation |
Install interim antenna and transmission line |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | SWR |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1860 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Flexible Air | |
Diameter | 3 inches | |
Segment Length | N/A | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 1000 feet per run | |
Justification for New Transmission Line | Licensee needs to connect to the interim antenna to keep the current channel on air while testing the repack channel that will use the existing line. |
Name | Description |
---|---|
Installation |
Install the interim transmission line |
Interim Sweep |
Sweep interim transmission line |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | Terrain Constrained | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1041013 | |
Coordinates (NAD83) | Latitude (NAD83) | 33° 45' 06.0" N- |
Longitude (NAD83) | 088° 52' 40.0" W- | |
Overall Structure Height | 1799.85 feet | |
Support Structure Height | 1704.70 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 509.84 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | COLUMBUS TELEVISION, INC. | |
Date Constructed | 01/01/1985 |
Facility ID | Call Sign | Service |
---|---|---|
48630 | WSYE | FM |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Major Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Terrain constrained |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 1700 | |
Explanation | Station is one of a group of co-owned stations, all of which are subject to repack. There is no group director of engineering, and station has only IT engineer on staff. Co-ordination is needed for the entire group's transition in different phases. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | Yes | |
Environmental Assessment | Yes | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Attorneys Fees - Other Repack Transition Work |
Assist in the preparation of required reports and advice as to requirements and issues in connection with repack transition |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Additional Legal Fees |
Additional fees to process quarterly progress reports and refiling fees of 399 forms |
Electrical wiring |
wiring needed to install new transmitter |
Removal of old DTV equipment |
removal of old DTV transmitter and all related equipment |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,062,778.24 | $628,116.02 | N/A | $628,116.02 | N/A |
Total for all systems | $2,922,527.72 | $1,547,664.50 | N/A | $1,305,137.20 | N/A |
Primary Transmitter ULXTE-24 | $1,062,778.24 | $628,116.02 | $628,116.02 | ||
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $0.00 | N/A | N/A | N/A |
Transmitter Site Survey | $18,438.24 | $18,438.24 | Please see attached WCBI-TV Site Survey Report. | $18,438.24 | Mississippi state tax, which is required, was added to the cost for the transmitter site survey itself. |
4" Rigid Conduit and Wiring (Cost per foot) | $19,190.00 | $0.00 | N/A | N/A | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $0.00 | N/A | N/A | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $0.00 | N/A | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW | $947,000.00 | $609,677.78 | N/A | $609,677.78 | had to add 6-1/8 to 4-1/8 adapter and 50 to 75OHM transformer to connect transmitter to existing 6-1/8 feed-line |
Actual Information Description | File Name |
---|---|
Service entrance 3 phase/800 amp/208 volt | Information not provided. |
Transmitter Site Survey | |
4" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Transformer 3 phase/480v - 150 KVA | Information not provided. |
Switchgear - industrial 800 amp | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $403,724.00 | $166,704.00 | N/A | $142,279.00 | N/A |
Total for all systems | $2,922,527.72 | $1,547,664.50 | N/A | $1,305,137.20 | N/A |
Interim Antenna SWDDP4-4-4-0 | $283,584.00 | $70,304.00 | $56,704.00 | ||
Installation | $15,000.00 | $15,000.00 | N/A | $7,500.00 | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $0.00 | N/A | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,100.00 | N/A | N/A | N/A |
UHF – Broadband Panel, Side Mount Auxiliary/Interim, 240 horizontally polarized | $0.00 | $0.00 | This line is a duplicate, apparently entered by the filing system for no known reason, and the licensee has no knowledge of why it is here. | N/A | N/A |
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized | $189,500.00 | $0.00 | N/A | N/A | N/A |
UHF – Broadband Panel, Side Mount Auxiliary/Interim, 240 horizontally polarized | $49,204.00 | $49,204.00 | ***System Notice: Estimate adjusted and locked because line has been superseded.***The projected cost of the antenna has been increased because of Shipping | $49,204.00 | N/A |
Primary Antenna SWEDBM32PNHS/27 | $120,140.00 | $96,400.00 | $85,575.00 | ||
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $0.00 | N/A | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $6,100.00 | N/A |
UHF - High Power, Side Mount, basic slot antenna, 599 kW input, directional,, horizontally polarized | $85,000.00 | $85,000.00 | N/A | $79,475.00 | N/A |
Actual Information Description | File Name |
---|---|
Installation | |
Side mount brackets for high power antennas (if not included in antenna base cost) | Information not provided. |
Sweep test of existing antenna | Information not provided. |
UHF – Broadband Panel, Side Mount Auxiliary/Interim, 240 horizontally polarized | Information not provided. |
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized | Information not provided. |
UHF – Broadband Panel, Side Mount Auxiliary/Interim, 240 horizontally polarized | |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | Information not provided. |
Side mount brackets for high power antennas (if not included in antenna base cost) | Information not provided. |
Sweep test of existing antenna | |
UHF - High Power, Side Mount, basic slot antenna, 599 kW input, directional,, horizontally polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $80,100.00 | $79,754.00 | N/A | $72,253.16 | N/A |
Total for all systems | $2,922,527.72 | $1,547,664.50 | N/A | $1,305,137.20 | N/A |
Interim Transmission Line | $80,100.00 | $79,754.00 | $72,253.16 | ||
Interim Sweep | $6,100.00 | $6,100.00 | N/A | $6,100.00 | N/A |
Flexible Air Transmission Line - dielectric, 3" | $59,000.00 | $58,654.00 | price increase because shipping and 6 1/8 75 ohm EIA adapter was left off | $58,653.16 | N/A |
Installation | $15,000.00 | $15,000.00 | N/A | $7,500.00 | N/A |
Primary Transmission Line | $0.00 | $0.00 | $0.00 |
Actual Information Description | File Name |
---|---|
Interim Sweep | |
Flexible Air Transmission Line - dielectric, 3" | |
Installation |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $868,300.00 | $275,000.00 | N/A | $232,055.00 | N/A |
Total for all systems | $2,922,527.72 | $1,547,664.50 | N/A | $1,305,137.20 | N/A |
Primary Tower TOWER | $868,300.00 | $275,000.00 | $232,055.00 | ||
Major tower reinforcement/modifications | $421,000.00 | $250,000.00 | N/A | $212,322.00 | N/A |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $25,000.00 | N/A | $19,733.00 | N/A |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $0.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Major tower reinforcement/modifications | |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $431,495.00 | $331,262.50 | N/A | $198,555.34 | N/A |
Total for all systems | $2,922,527.72 | $1,547,664.50 | N/A | $1,305,137.20 | N/A |
Outside Professional Services | $431,495.00 | $331,262.50 | $198,555.34 | ||
Attorneys Fees - Other Repack Transition Work | $8,000.00 | $8,000.00 | Provide legal advice and assistance with preparation and filing of required reports and completion of required notices, and provide legal advice in connection with other transition issues and opportunities | $5,152.50 | N/A |
RF Exposure Measurements | $21,050.00 | $0.00 | N/A | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $20,000.00 | N/A | $6,757.50 | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $0.00 | N/A | N/A | N/A |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | $10,520.00 | $0.00 | N/A | N/A | N/A |
NEPA Section 106 environmental review, if needed | $6,310.00 | $0.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $1,200.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | $1,122.50 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $1,462.50 | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $1,500.00 | N/A | N/A | N/A |
Project management of the transition | $268,600.00 | $255,000.00 | N/A | $158,747.84 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $25,312.50 | Initial estimates were inadequate because they do not take into account technical difficulties of working with the form, multiple steps needed to correct a typo or other issue, inconsistent and changing requirements, and difficulties in conveying details. | $25,312.50 | The FCC Form 399 experienced technical issues which made modification difficult and time-consuming, and as the first station of a group with the earliest transition, figuring out the correct way to complete the form took considerable time. |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,000.00 | N/A | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $2,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Attorneys Fees - Other Repack Transition Work | |
RF Exposure Measurements | Information not provided. |
Comprehensive coverage verification via field study, if needed | |
ASR modification (prepare FCC Form 854) | Information not provided. |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | Information not provided. |
NEPA Section 106 environmental review, if needed | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | Information not provided. |
Project management of the transition | |
Prepare and or review reimbursement form | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Perform engineering study for new channel assignment and antenna development | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $76,130.48 | $66,827.98 | N/A | $31,878.68 | N/A |
Total for all systems | $2,922,527.72 | $1,547,664.50 | N/A | $1,305,137.20 | N/A |
Other Expenses | $76,130.48 | $66,827.98 | $31,878.68 | ||
Removal of old DTV equipment | $9,420.00 | $9,420.00 | Removal of old DTV equipment needed to have space around new repack transmitter and RF load | $9,420.00 | N/A |
Electrical wiring | $13,550.48 | $13,550.48 | need for transmitter install please see justification | $13,550.48 | N/A |
MVPD Notification of Channel Change | $1,047.50 | $1,047.50 | Cost slightly higher than anticipated due to need for legal advice with regard to certifications and announcements | $1,047.50 | N/A |
Develop and air announcement of upcoming channel change | $562.50 | $562.50 | Costs were slightly greater than anticipated because of need for direction as to content of notice, requirements for airing same, and drafting and posting of required certification of notices | $562.50 | N/A |
Equipment Storage | $2,500.00 | $2,500.00 | STORAGE CONTAINER FOR NEW EQUIPMENT ON SITE | $1,365.45 | N/A |
Equipment Delivery and Handling Charges | $19,000.00 | $19,000.00 | N/A | $3,685.25 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
Non-zoning permits | $0.00 | $0.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $2,247.50 | N/A | $2,247.50 | N/A |
Additional Legal Fees | $8,500.00 | $8,500.00 | legal fees for added expense for re-certifying of 399 forms and station progress reports | N/A | N/A |
Actual Information Description | File Name |
---|---|
Removal of old DTV equipment | |
Electrical wiring | |
MVPD Notification of Channel Change | |
Develop and air announcement of upcoming channel change | |
Equipment Storage | |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Non-zoning permits | Information not provided. |
DTV Medical Facility Notification | |
Additional Legal Fees | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $2,922,527.72 | $1,547,664.50 | $1,305,137.20 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Bobby Berry Chief Operating Officer 11/06/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Bobby Berry Chief Operating Officer 11/06/2020 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|