Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
UHF TV ASSOCIATION Applicant Doing Business As: UHF TV ASSOCIATION |
PO BOX 187 TUCUMCARI, NM 88401 United States |
+1 (806) 331-9852 | zdavis@newschannel10.com | Other |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Tony Zummallen Anywave Communication Technologies |
Tony zumMallen 300 Knightsbridge Parkway, Suite 150 Lincolnshire, IL 60069 United States |
+1 (816) 882-5600 | tony.zummallen@anywavecom.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | Replace the transmitter per the channel reassignment project. Replace line and antenna per channel reassignment project which is shared with 3 other stations listed above. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | 20 Watts | |
Year | 2007 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 20 W |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TRN-U-100-FA | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 160 W | |
Justification for New Transmitter | New channel requires new combiner with sharper tuning, resulting in more loss. Larger transmitter required to overcome that loss. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 5 tons | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Decommission Old Transmitter |
Disconnect and deinstall old transmitter to prepare for new transmitter |
Shipping |
Estimated shipping not included on quote |
Transmitter Site Prep |
Prepare site for new transmitter |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Slotted Coaxial | |
ERP: | 0.61 kW | |
Manufacturer | ||
Model | SL-8 | |
Year | 2007 |
Facility ID | Call Sign |
---|---|
68704 | K38FP-D |
68703 | K46BU-D |
68705 | K40DK-D |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | Yes | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Slotted Coaxial | |
ERP: | 0.61 kW | |
Manufacturer | ||
Model | SL-8-4 | |
Year | 2019 | |
Justification for New Antenna | Original antenna cannot support new channels |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 4 | |
Frequencies of channels supported | Upper and lower frequency | |
Frequency | 512.0 MHz - 548.0 MHz | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Combiner Shipping fees |
Estimated Shipping cost for combiner |
Antenna Shipping fees |
Estimated Shipping cost for antenna |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | Yes | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 100 feet per run |
Facility ID | Call Sign |
---|---|
68704 | K38FP-D |
68703 | K46BU-D |
68705 | K40DK-D |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 100 feet per run | |
Justification for New Transmission Line | Line being replaced due to the length required for new channel and to attach to new antenna | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | No |
Name | Description |
---|---|
Shipping |
Estimated Shipping for transmission line not included on quote |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
Coordinates (NAD83) | Latitude (NAD83) | 35° 08' 12.0" N- |
Longitude (NAD83) | 103° 41' 56.9" W- | |
Overall Structure Height | 39.00 feet | |
Support Structure Height | 39.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 4777.00 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | UHF TV Association | |
Date Constructed | 01/01/1990 |
Facility ID | Call Sign | Service |
---|---|---|
68704 | K38FP-D | LPT |
68703 | K46BU-D | LPT |
68705 | K40DK-D | LPT |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | No study needed |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 50 | |
Explanation | Required to assist in the turnkey management of the channel relocation project in order that the existing internal personnel can maintain and operate the station's daily operational requirements and plans. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Prepare Form 601 | Yes | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | Yes |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $62,050.00 | $31,595.90 | N/A | $13,060.00 | N/A |
Total for all systems | $240,787.42 | $149,946.01 | N/A | $17,353.60 | N/A |
Primary Transmitter TRN-U-100-FA | $62,050.00 | $31,595.90 | $13,060.00 | ||
Shipping | $500.00 | $500.00 | Estimated shipping and freight not included on quote | N/A | N/A |
Decommission Old Transmitter | $3,000.00 | $3,000.00 | Estimated labor to de-install and disconnect old transmitter in preparation for installation of new transmitter. | N/A | N/A |
Transmitter Building Site Survey/Installation | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
5 Ton system | $20,250.00 | $1,035.90 | Attached quote for $4143.61, shared equally between (4) stations | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 160 - 300 Watts | $24,300.00 | $13,060.00 | Per attached Anywave quote. | $13,060.00 | N/A |
Transmitter Site Prep | $4,000.00 | $4,000.00 | Estimated costs to prepare site for new transmitter. Includes items such as receiving and inventory of transmitter and all components; pre-assembly of cabinets and subassemblies; ensuring site has all materials ready for installation crew. | N/A | N/A |
Actual Information Description | File Name |
---|---|
Shipping | Information not provided. |
Decommission Old Transmitter | Information not provided. |
Transmitter Building Site Survey/Installation | Information not provided. |
5 Ton system | Information not provided. |
UHF - Air Cooled Solid State Transmitter 160 - 300 Watts | |
Transmitter Site Prep | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $28,177.42 | $28,177.42 | N/A | $0.00 | N/A |
Total for all systems | $240,787.42 | $149,946.01 | N/A | $17,353.60 | N/A |
Primary Antenna SL-8-4 | $28,177.42 | $28,177.42 | $0.00 | ||
Antenna Shipping fees | $500.00 | $500.00 | Estimated shipping fees for antenna (1/4 of total cost, per shared station). | N/A | N/A |
Combiner Shipping fees | $500.00 | $500.00 | Estimated shipping fees for combiner (1/4 of total cost, per shared station). | N/A | N/A |
1 kW UHF Combiner (per channel) | $18,800.00 | $18,800.00 | N/A | N/A | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $5,730.00 | N/A | N/A | N/A |
UHF-Low Power, Top Mount, Slotted Coaxial, 0.61kW input, Circular | $2,647.42 | $2,647.42 | 1/4 of attached quote # RFPQ6510 from RF Specialties of Texas dated 10/2/19. Three other stations to share the costs. | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,900.00 | $1,140.45 | N/A | $0.00 | N/A |
Total for all systems | $240,787.42 | $149,946.01 | N/A | $17,353.60 | N/A |
Primary Transmission Line | $2,900.00 | $1,140.45 | $0.00 | ||
Shipping | $500.00 | $500.00 | 1/4 of estimated shipping costs not included on quote. | N/A | N/A |
Flexible Foam Transmission Line - dielectric, 1 5/8" | $2,400.00 | $640.45 | 1/4 of line purchase (shared with 3 other stations) per attached RFS quote. | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $56,190.00 | $3,215.24 | N/A | $0.00 | N/A |
Total for all systems | $240,787.42 | $149,946.01 | N/A | $17,353.60 | N/A |
Primary Tower TOWER | $56,190.00 | $3,215.24 | $0.00 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $3,215.24 | Cost determined from Quote uploaded on 4.13.20 | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $82,565.00 | $76,912.00 | N/A | $4,293.60 | N/A |
Total for all systems | $240,787.42 | $149,946.01 | N/A | $17,353.60 | N/A |
Outside Professional Services | $82,565.00 | $76,912.00 | $4,293.60 | ||
Form 399 assistance or other Program Management costs | $5,890.00 | $5,890.00 | Per Anywave Proposal # PR1910-0492 | $1,793.60 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $2,235.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $3,262.50 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | N/A | N/A |
Prepare Form 601 | $755.00 | $755.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $1,280.00 | $1,280.00 | N/A | N/A | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | N/A | N/A | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $2,500.00 | Required to assist in the 399 form preparation in order that the existing internal personnel can maintain and operate the station's daily operational requirements and plans. | $2,500.00 | N/A |
Project management of the transition | $5,275.00 | $7,700.00 | 50 hours at $154/hour | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $52,600.00 | $43,732.00 | Per-attached quote. | N/A | N/A |
Actual Information Description | File Name |
---|---|
Form 399 assistance or other Program Management costs | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare Form 601 | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
Perform engineering study for displacement application | Information not provided. |
Prepare/ Review 399 reimbursement form | |
Project management of the transition | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $8,905.00 | $8,905.00 | N/A | $0.00 | N/A |
Total for all systems | $240,787.42 | $149,946.01 | N/A | $17,353.60 | N/A |
Other Expenses | $8,905.00 | $8,905.00 | $0.00 | ||
Equipment Storage | $500.00 | $500.00 | Estimated storage costs. Expecting multiple staggered equipment deliveries from different vendors and need to store and stage new equipment prior to installation date. Anticipate from 6-24 of storage time. | N/A | N/A |
Equipment Delivery and Handling Charges | $1,000.00 | $1,000.00 | Estimated transport, forklift rental and handling fees from staging area to transmitter site. | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $1,000.00 | $1,000.00 | 4-6 yard disposal bin on site to capture all waste from on site system integration and tower vendors. | N/A | N/A |
FCC Filing Fees - Form 2100 Major change CP application | $4,960.00 | $4,960.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $240,787.42 | $149,946.01 | $17,353.60 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Zachary Davis Engineer 09/14/2020 |