Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
EASTERN KENTUCKY UNIVERSITY Doing Business As: EASTERN KENTUCKY UNIVERSITY |
Mike Savage 102 PERKINS BUILDING RICHMOND, KY 40475 United States |
+1 (617) 828-9940 | paulshulins@gmail.com | Private Not-for-Profit Educational Institution |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Construct Auxiliary site to be used while work on the TV tower is being done. At times WEKU will reduce power and stay on the TV Tower (WKLE Facility ID 34207) and at other times transition to the aux site at a different location. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | TX 1000 V2 | |
Year | 2019 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Model Type | Analog | |
Solid State Power Capacity | 1000 W |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TX 1000 V2 FM | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Model Type | Analog | |
Solid State Power capacity | 1.0 kW | |
Justification for New Transmitter | Needed for aux site to broadcast from when repack work is taking place on main site. | |
Does the transmitter require the purchase of a new HD Importer? | No | |
Does the transmitter require the purchase of a new HD Exporter? | No |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | Does the transmitter installation require an Additional Exciter? | No |
Does the transmitter installation require any additional transmitter installation costs? | No | |
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Other Transmitter-Related Expenses | Does the replacement transmitter require a Remote Control? | No |
Does the replacement transmitter require an RDS Encoder? | No | |
Does the replacement transmitter require Audio Processing? | No |
Name | Description |
---|---|
Transmitter Installation |
Cost to install the new transmitter at the aux site |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Top | |
Polarization | Circular | |
Type | Cross Dipole | |
ERP: | 1.0 kW | |
Manufacturer | ||
Model | FMC-01 | |
Year | 2018 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Cross Dipole | |
ERP: | 0.4 kW | |
Manufacturer | ||
Model | FMC-01 | |
Year | 2018 | |
Justification for New Antenna | Stations Aux facility requires purchase and installation of a new FM antenna. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
FM Band Pass Filters | Do you require an FM band pass filter? | No |
Notch Filter | Do you require a Notch filter? | No |
De-Icers | Do you require De-Icers? | No |
Radomes | Do you require Radomes? | No |
Name | Description |
---|---|
Install Antenna |
Cost to install the new Dipole antenna for the Aux facility |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 60 | |
Explanation | Planning, organization and tasks related to the displacement project and need to construct an aux facility. | |
Outside RF consulting Engineering Services | Prepare engineering section of Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | No | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | No | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
Prepare and file Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No | |
1 pair IP-only Codecs for fiber, internet or IP microwave systems | Yes |
Name | Description |
---|---|
Consulting Engineer |
Consulting engineer to license aux site |
Radio Station Engineering Services |
Labor for radio station engineers dedicated to repack project labor |
STL |
Internet Connectivity to aux site. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $12,775.00 | $9,434.30 | N/A | $6,434.30 | N/A |
Total for all systems | $39,059.26 | $34,278.92 | N/A | $18,888.56 | N/A |
Primary Transmitter TX 1000 V2 FM | $12,775.00 | $9,434.30 | $6,434.30 | ||
Transmitter Installation | $3,000.00 | $3,000.00 | Costs to install the new transmitter for the aux facility | N/A | N/A |
Air Cooled Solid State FM Transmitter 600 - 1000 Watts Analog | $9,775.00 | $6,434.30 | Transmitter costs for aux facility | $6,434.30 | Transmitter shipping needed to be included |
Actual Information Description | File Name |
---|---|
Transmitter Installation | Information not provided. |
Air Cooled Solid State FM Transmitter 600 - 1000 Watts Analog |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $4,300.00 | $3,795.00 | N/A | $795.00 | N/A |
Total for all systems | $39,059.26 | $34,278.92 | N/A | $18,888.56 | N/A |
Primary Antenna FMC-01 | $4,300.00 | $3,795.00 | $795.00 | ||
Install Antenna | $3,000.00 | $3,000.00 | Install new FM antenna at aux site. | N/A | N/A |
Low Power 200 Watt - 1000 Watt Circularly-polarized | $1,300.00 | $795.00 | Cost for new antenna for aux facility | $795.00 | N/A |
Actual Information Description | File Name |
---|---|
Install Antenna | Information not provided. |
Low Power 200 Watt - 1000 Watt Circularly-polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $9,795.00 | $11,905.00 | N/A | $7,701.24 | N/A |
Total for all systems | $39,059.26 | $34,278.92 | N/A | $18,888.56 | N/A |
Outside Professional Services | $9,795.00 | $11,905.00 | $7,701.24 | ||
Form 399 assistance or other Program Management costs | $1,755.00 | $1,755.00 | Costs to prepare 399 eligibility and broadcaster relocation forms for the station and submit to the FCC for approval. | $1,755.00 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $3,900.00 | Prepare, review, submit, revise 399 invoices for the WEKU displacement project. | $3,900.00 | Took longer than estimated to fill out forms. |
Project management of the transition | $6,330.00 | $6,250.00 | Various project management tasks to construct the aux facility. | $2,046.24 | N/A |
Actual Information Description | File Name |
---|---|
Form 399 assistance or other Program Management costs | |
Prepare/ Review 399 reimbursement form | |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $12,189.26 | $9,144.62 | N/A | $3,958.02 | N/A |
Total for all systems | $39,059.26 | $34,278.92 | N/A | $18,888.56 | N/A |
Other Expenses | $12,189.26 | $9,144.62 | $3,958.02 | ||
STL | $2,400.52 | $2,400.52 | N/A | $2,400.52 | N/A |
Consulting Engineer | $1,557.50 | $1,557.50 | Outside consulting engineering services for WEKU Aux Facility project | $1,557.50 | N/A |
Radio Station Engineering Services | $2,046.24 | $2,046.24 | N/A | $0.00 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
Point to Point Microwave (STL/ICR): 1 pair IP-only Codecs for fiber, internet or IP microwave systems | $5,850.00 | $2,805.36 | STL | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
STL | |
Consulting Engineer | |
Radio Station Engineering Services | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
Point to Point Microwave (STL/ICR): 1 pair IP-only Codecs for fiber, internet or IP microwave systems | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $39,059.26 | $34,278.92 | $18,888.56 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | PAUL STANLEY SHULINS Engineering Consultant 09/02/2020 |