Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
CITADEL COMMUNICATIONS, LLC Doing Business As: CITADEL COMMUNICATIONS, LLC |
117 PONDFIELD ROAD BRONXVILLE, NY 10708 United States |
+1 (914) 793-3400 | CITNYLTD@AOL.COM | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Stephen Hartzell Brooks, Pierce et al. |
150 Fayetteville Street Suite 1700 Raleigh, NC 27601 United States |
+1 (919) 839-0300 | shartzell@brookspierce.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Please see Eligibility Certification and Transition Plan Description Exhibit |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Retune Existing |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | Larkin |
Model | DTT1KSU | |
Year | 2012 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1 kW |
Section | Question | Response |
---|---|---|
New Mask Filter | Does the transmitter require a new mask filter? | No |
New Exciter | Is a new exciter needed? | No |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 8.5 kW | |
Manufacturer | ||
Model | SWLP12OM | |
Year | 2012 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 14.9 kW | |
Manufacturer | ||
Model | CS-2030-5600-12 | |
Year | 2018 | |
Justification for New Antenna | Please see Eligibility Certification and Transition Plan Description Exhibit |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 1 5/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Miscellaneous parts for new antenna |
Miscellaneous parts for new antenna |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1028096 | |
Coordinates (NAD83) | Latitude (NAD83) | 27° 20' 27.0" N- |
Longitude (NAD83) | 082° 27' 54.0" W- | |
Overall Structure Height | 503.93 feet | |
Support Structure Height | 499.99 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 27.89 feet | |
Structure Type | NTOWER - Multiple Structures | |
Tower Owner | Comcast of West Florida, Inc. | |
Date Constructed | 01/01/1966 |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Remove Channel 39 Antenna and Install Channel 26 Antenna |
Remove Channel 39 Antenna and Install Channel 26 Antenna |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
Additional Displacement Legal Services Not Otherwise Specified in Form 399 |
Additional Displacement Legal Services Not Otherwise Specified in Form 399 |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $11,000.00 | $7,550.00 | N/A | $7,550.00 | N/A |
Total for all systems | $236,907.97 | $75,393.35 | N/A | $67,688.00 | N/A |
Primary Transmitter DTT1KSU | $11,000.00 | $7,550.00 | $7,550.00 | ||
Retune - UHF and VHF - minor re-channel issues | $11,000.00 | $7,550.00 | N/A | $7,550.00 | N/A |
Actual Information Description | File Name |
---|---|
Retune - UHF and VHF - minor re-channel issues |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $36,945.47 | $19,690.47 | N/A | $19,690.47 | N/A |
Total for all systems | $236,907.97 | $75,393.35 | N/A | $67,688.00 | N/A |
Primary Antenna CS-2030-5600-12 | $36,945.47 | $19,690.47 | $19,690.47 | ||
Miscellaneous parts for new antenna | $74.27 | $74.27 | N/A | $74.27 | N/A |
Pattern scatter analysis for side mount (if not included in antenna base cost) | $0.00 | $0.00 | N/A | N/A | N/A |
Side Mount antenna brackets | $4,625.00 | $0.00 | N/A | N/A | N/A |
Elbow complex, single channel, 1 5/8” input (if needed) | $6,900.00 | $0.00 | N/A | N/A | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $0.00 | N/A | N/A | N/A |
UHF-Low Power, Side Mount, Slotted Coaxial, 14.9kW input, Horizontal | $19,616.20 | $19,616.20 | N/A | $19,616.20 | Additional expenses were incurred as indicated in the attached invoices. |
Actual Information Description | File Name |
---|---|
Miscellaneous parts for new antenna | |
Pattern scatter analysis for side mount (if not included in antenna base cost) | Information not provided. |
Side Mount antenna brackets | Information not provided. |
Elbow complex, single channel, 1 5/8” input (if needed) | Information not provided. |
Sweep test of transmission line and antenna | Information not provided. |
UHF-Low Power, Side Mount, Slotted Coaxial, 14.9kW input, Horizontal |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $163,750.00 | $6,000.00 | N/A | $6,000.00 | N/A |
Total for all systems | $236,907.97 | $75,393.35 | N/A | $67,688.00 | N/A |
Primary Tower NTOWER | $163,750.00 | $6,000.00 | $6,000.00 | ||
Tower Rigging Tall Tower (greater than 500') | $157,750.00 | $0.00 | N/A | N/A | N/A |
Remove Channel 39 Antenna and Install Channel 26 Antenna | $6,000.00 | $6,000.00 | N/A | $6,000.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Tall Tower (greater than 500') | Information not provided. |
Remove Channel 39 Antenna and Install Channel 26 Antenna |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $23,767.50 | $42,152.88 | N/A | $34,447.53 | N/A |
Total for all systems | $236,907.97 | $75,393.35 | N/A | $67,688.00 | N/A |
Outside Professional Services | $23,767.50 | $42,152.88 | $34,447.53 | ||
Additional Displacement Legal Services Not Otherwise Specified in Form 399 | $10,000.00 | $10,000.00 | N/A | $7,949.65 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $4,061.50 | Additional expenses were incurred as indicated in the attached invoices. | $4,061.50 | Additional expenses were incurred as indicated in the attached invoices. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $600.68 | N/A | $600.68 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | $0.00 | N/A |
Perform engineering study for displacement application | $1,800.00 | $3,250.00 | Additional expenses were incurred as indicated in the attached invoices. | $3,250.00 | Additional expenses were incurred as indicated in the attached invoices. |
Form 399 assistance or other Program Management costs | $2,500.00 | $2,500.00 | N/A | N/A | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $18,585.70 | Additional expenses were incurred as indicated in the attached invoices. | $18,585.70 | Additional expenses were incurred as indicated in the attached invoices. |
Actual Information Description | File Name |
---|---|
Additional Displacement Legal Services Not Otherwise Specified in Form 399 | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for displacement application | |
Form 399 assistance or other Program Management costs | Information not provided. |
Prepare/ Review 399 reimbursement form |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,445.00 | $0.00 | N/A | $0.00 | N/A |
Total for all systems | $236,907.97 | $75,393.35 | N/A | $67,688.00 | N/A |
Other Expenses | $1,445.00 | $0.00 | $0.00 | ||
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $0.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $0.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $236,907.97 | $75,393.35 | $67,688.00 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Daniel D. Ackerman Vice President of Engineering 08/27/2020 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Daniel D. Ackerman Vice President of Engineering 08/27/2020 |