Facility ID:
22591
Service:
DTV
Call Sign:
WLNE-TV
Channel:
24 (UHF)
File Number:
0000026593
FRN:
0028489094
Date Submitted:
09/17/2020

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

WLNE Providence License LLC

Doing Business As: WLNE Providence License LLC

Andrew C. Carington

3102 West End Ave., Suite 400

Nashville, TN 37203

United States

+1 (629) 777-5511 acarington@standardmedia.com Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Jessica T. Nyman

FCC Counsel

Pillsbury Winthrop Shaw Pittman LLP

Jessica Nyman

1200 Seventeenth Street, NW

Washington, DC 20036

United States

+1 (202) 663-8810 jessica.nyman@pillsburylaw.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan Purchase transmitter, antenna, combiner, and transmission line. Current transmitter cannot be retuned to the new channel. Installation of interim antenna, transmission line, and combiner on co-located tower while main antenna is replaced.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Sigma CD
Year 2005
Type Inductive Output Tube
IOT Power Type Two
Power Capacity 40 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model Maxiva Series ULXTE-30
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 19.2 kW
Justification for New Transmitter Current transmitter cannot be retuned to the new channel. Cost estimate of comparable IOT is significantly more than upgrade to solid state (see attachments). Estimates are from two different vendors because GatesAir does not make IOT transmitters.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) Yes
Power 150 kVA
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service Yes
Description Installation of parallel surge suppressor for 3PH WYE, installation of 208-240v pump module.
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Installation and Proof

See GatesAir Proposal Q-60990

Transmitter Parts

See Graybar Invoice #9312508971

Mask Filter System

See GatesAir Proposal Q-60990

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Leased
Owner WJAR
Site N/A
Is the existing antenna shared with another station or stations? Yes
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 350.0 kW
Manufacturer
Model RFU-24DSB-R 4C170TC
Year 2005

Facility ID's and Call Signs of all stations with whom the antenna is shared.

Facility ID Call Sign
50780 WJAR

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Leased
Owner WJAR
Is antenna shared? Yes
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 220.0 kW
Manufacturer
Model TFU-21JCC-R 4C170DC
Year 2017
Justification for New Antenna Present antenna cannot be tuned to new channel 24.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 2
Frequencies of channels supported Upper and lower frequency
Frequency 530.0 MHz - 542.0 MHz
Do you need a combiner output splitter/switcher for dual feed lines? No
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Broadband
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? Yes
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 350.0 kW
Manufacturer
Model TFU-21JSC-R 04 DC
Year 2018
Justification for New Antenna To keep WLNE on the air when the Primary old antenna is taken down and the new Primary put up. The interim antenna can be used for the new (24)channel or the old channel (50)

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? B
Feed Line Size 6 1/8 inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Transmission Line - Other Related

Transmission Line Test 6-75

Rigid Transmission Line

Transmission Line 6-75 EIA Length 15 to 20 Feed Fixed

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? No

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Move Equipment
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? Terrain Constrained
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1005123
Coordinates (NAD83) Latitude (NAD83) 41° 51' 55.4" N-
Longitude (NAD83) 071° 17' 12.7" W-
Overall Structure Height 922.89 feet
Support Structure Height 872.04 feet
Ground Elevation Above Mean Sea Level (AMSL) 197.83 feet
Structure Type LTOWER - Lattice Tower
Tower Owner WJAR Licensee, LLC
Date Constructed 04/01/2013

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
56092 WSBE-TV DTV
70184 WRIW-CD DTV
50780 WJAR DTV

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Terrain constrained
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

install aux. antenna

install interim antenna so old antenna can be taken down and new one put up

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 80
Explanation WLNE-TV was sold by Citadel Communications LLC to a subsidiary of Standard Media Group LLC on 9/5/2019, at which time the new licensee retained Dan Ackerman as an engineering consultant/project manager to assist with completion of the station's transition
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Additional Repack Legal Services Not Otherwise Specified in Form 399

6-2017 Pillsbury Invoice Breakout

Additional Repack Legal Services Not Otherwise Specified in Form 399

Non-Catalog Legal Services

Additional Repack Professional Services Not Otherwise Specified in Form 399

Arthur J. Gallagher Insurance/Risk Management Services

Additional Repack Legal Services Not Otherwise Specified in Form 399

4-2017 Pillsbury Invoice Breakout

Additional Repack Professional Services Not Otherwise Specified in Form 399

Non-Catalog Professional Services

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? Yes
Is Remediation needed? Yes
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning Yes
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application No
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? No
Does this relocation require Equipment Storage? No
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Other Expenses

Antenna/Transmitter Freight Charges and Sales Tax

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $779,768.27 $744,518.27 N/A $555,210.08 N/A
Total for all systems $2,038,839.78 $1,316,151.11 N/A $930,129.75 N/A
Primary Transmitter Maxiva Series ULXTE-30 $779,768.27 $744,518.27 $555,210.08
Installation and Proof $30,395.25 $30,395.25 N/A $24,153.78 N/A
Other Electrical Service: Installation of parallel surge suppressor for 3PH WYE, installation of 208-240v pump module. $10,000.00 $10,000.00 N/A $4,309.03 N/A
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW $684,000.00 $650,000.00 N/A $493,273.91 N/A
Transmitter Parts $1,430.00 $1,430.00 N/A $830.34 N/A
Mask Filter System $28,393.02 $28,393.02 N/A $28,393.02 N/A
Transformer 3 phase/480v - 150 KVA $25,550.00 $24,300.00 N/A $4,250.00 N/A

Components

Actual Information Description File Name
Installation and Proof

Component Description:
Installation and Proof
Amount:
$14,022.03

Component Description:
Installation and Proof
Amount:
$10,131.75

Component Description:
Installation and Proof (remaining balance)
Amount:
$6,241.47
Other Electrical Service: Installation of parallel surge suppressor for 3PH WYE, installation of 208-240v pump module.

Component Description:
Electrical - remaining balance
Amount:
$1,436.35

Component Description:
Electrical
Amount:
$1,436.34

Component Description:
Electrical
Amount:
$1,436.35

Component Description:
Electrical
Amount:
$1,436.34
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW

Component Description:
ULXTE-30 Transmitter (see Proposal and Change Order Q-80888)
Amount:
$174,940.11

Component Description:
ULXTE-30 Transmitter
Amount:
$144,703.39

Component Description:
ULXTE-30 Transmitter, Change Order 83858 (with explanation of cost and additional documentation) - Hose, Rubber 1.500" IDx100ft
Amount:
$1,186.35

Component Description:
Change Order Q-80915 (Dual Switch Controller)
Amount:
$3,890.28

Component Description:
ULXTE-30 Transmitter(accounting for remaining freight charges and sales tax)
Amount:
$36,966.54

Component Description:
ULXTE-30 Transmitter (see Change Orders)
Amount:
$164,808.36

Component Description:
ULXTE-30 Transmitter (see Change Order)
Amount:
$1,186.35

Component Description:
Graybar transmitter parts - 2nd order (Removing Request)
Amount:
N/A

Component Description:
ULXTE-30 Transmitter
Amount:
$135,477.52

Component Description:
Graybar transmitter parts (Moved to correct category)
Amount:
N/A
Transmitter Parts

Component Description:
Graybar transmitter equipment
Amount:
$830.34
Mask Filter System

Component Description:
Mask Filter System
Amount:
$9,464.34

Component Description:
Mask Filter System
Amount:
$9,464.35

Component Description:
Mask Filter - remaining balance
Amount:
$9,464.33

Component Description:
Mask Filter System
Amount:
$9,464.33
Transformer 3 phase/480v - 150 KVA

Component Description:
Dielectric - 2 transformers (XFMR 6-50/6-75 UHF 3ST)
Amount:
$4,250.00

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $629,197.00 $326,406.00 N/A $181,026.40 N/A
Total for all systems $2,038,839.78 $1,316,151.11 N/A $930,129.75 N/A
Interim Antenna TFU-21JSC-R 04 DC $274,417.00 $205,006.00 $181,026.40
Rigid Transmission Line $1,719.00 $1,719.00 N/A $1,719.00 N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $16,425.00 N/A $14,782.50 N/A
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) $13,700.00 $11,970.00 N/A $10,773.00 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $6,400.00 N/A
UHF - Lower Power Side Mount, One station antenna -- 200-500 kW, elliptically or circularly polarized $227,000.00 $166,374.00 N/A $145,445.70 N/A
Transmission Line - Other Related $2,118.00 $2,118.00 N/A $1,906.20 N/A
Primary Antenna TFU-21JCC-R 4C170DC $354,780.00 $121,400.00 $0.00
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $22,000.00 N/A N/A N/A
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) $13,700.00 $13,000.00 N/A N/A N/A
New combiner, cost per channel (without antenna) $84,200.00 $80,000.00 N/A N/A N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A N/A N/A
UHF - Lower Power Side Mount, One station antenna -- 200-500 kW, elliptically or circularly polarized $227,000.00 $0.00 N/A $0.00 N/A

Components

Actual Information Description File Name
Rigid Transmission Line

Component Description:
Rigid Transmission Line
Amount:
$773.55

Component Description:
Rigid Transmission Line - balance
Amount:
$171.90

Component Description:
Rigid Transmission Line
Amount:
$773.55
Side mount brackets for high power antennas (if not included in antenna base cost)

Component Description:
Side Mount Brackets
Amount:
$7,391.25

Component Description:
Side Mount Brackets
Amount:
$7,391.25
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed)

Component Description:
Elbow Complex Kit
Amount:
$5,386.50

Component Description:
Elbow Complex Kit
Amount:
$5,386.50
Sweep test of existing antenna

Component Description:
Sweep Test
Amount:
$2,880.00

Component Description:
Sweep Test - 10% Balance
Amount:
$640.00

Component Description:
Sweep Test
Amount:
$2,880.00
UHF - Lower Power Side Mount, One station antenna -- 200-500 kW, elliptically or circularly polarized

Component Description:
Dielectric Side Mount Antenna
Amount:
$66,532.05

Component Description:
Dielectric - 2 transformers (XFMR 6-50/6-75 UHF 3ST)(Updated component and moved invoice per 1-6-2020 email from repack administrator)
Amount:
N/A

Component Description:
Side Mount Antenna - VPOL included towards antenna price
Amount:
$66,532.05

Component Description:
Dielectric - Antenna - Balance
Amount:
$12,381.60
Transmission Line - Other Related

Component Description:
Transmission Line Test 6-75
Amount:
$953.10

Component Description:
Transmission Line Test 6-75
Amount:
$953.10
Side mount brackets for high power antennas (if not included in antenna base cost) Information not provided.
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) Information not provided.
New combiner, cost per channel (without antenna) Information not provided.
Sweep test of existing antenna Information not provided.
UHF - Lower Power Side Mount, One station antenna -- 200-500 kW, elliptically or circularly polarized Information not provided.

Cost Information

Back to Top

Transmission Line

Information not provided.

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $421,000.00 $0.00 N/A $0.00 N/A
Total for all systems $2,038,839.78 $1,316,151.11 N/A $930,129.75 N/A
Primary Tower LTOWER $421,000.00 $0.00 $0.00
install aux. antenna $0.00 $0.00 This is a shared site, and all costs are to be borne by WJAR (Fac. ID No. 50780). Please see WJAR's Form 399 to ensure consistency. N/A N/A
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $0.00 This is a shared site, and all costs are to be borne by WJAR (Fac. ID No. 50780). Please see WJAR's Form 399 to ensure consistency. N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $137,618.66 $175,965.99 N/A $170,227.42 N/A
Total for all systems $2,038,839.78 $1,316,151.11 N/A $930,129.75 N/A
Outside Professional Services $137,618.66 $175,965.99 $170,227.42
Project management of the transition $12,640.00 $15,750.88 Additional expenses incurred as detailed in attached invoices. $15,750.88 Additional expenses incurred as detailed in attached invoices.
Additional Repack Legal Services Not Otherwise Specified in Form 399 $23,308.66 $23,308.66 N/A $23,308.66 N/A
Additional Repack Professional Services Not Otherwise Specified in Form 399 $51,500.00 $51,500.00 N/A $50,500.00 N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $5,661.50 Additional cost incurred as set forth in attached invoices. $5,661.50 N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $923.00 N/A $923.00 N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A $276.00 N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,391.54 ***System Notice: Estimate adjusted and locked because line has been superseded.*** $5,391.54 Additional expenses incurred as detailed in attached invoices.
Perform engineering study for new channel assignment and antenna development $7,360.00 $125.00 ***System Notice: Estimate adjusted and locked because line has been superseded.*** $125.00 N/A
Prepare and or review reimbursement form $2,630.00 $29,754.02 ***System Notice: Estimate adjusted and locked because line has been superseded.***Additional expenses incurred as detailed in attached invoices $29,754.02 Additional expenses incurred as detailed in the attached invoices.
Prepare request for Special Temporary Authorization $2,050.00 $1,500.00 N/A $3,235.43 Additional expenses incurred as detailed in the attached invoices.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A $0.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $0.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $3,375.00 ***System Notice: Estimate adjusted and locked because line has been superseded.*** $3,375.00 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $3,351.50 Additional costs incurred as detailed in the attached invoices. $3,351.50 N/A
Prepare and or review reimbursement form $2,630.00 $22,072.33 ***System Notice: Estimate adjusted and locked because line has been superseded.***Additional expenses incurred as detailed in the attached invoices. $22,072.33 Additional expenses incurred, as detailed in attached invoices.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $6,502.56 ***System Notice: Estimate adjusted and locked because line has been superseded.***Additional expenses were incurred as indicated in the attached invoices. $6,502.56 N/A

Components

Actual Information Description File Name
Project management of the transition

Component Description:
D. Ackerman Project Manager Hours Related to WLNE Repack after Station Sale.
Amount:
$3,076.80

Component Description:
D. Ackerman Travel and Expenses for WLNE Project Management after Station Sale.
Amount:
$12,674.08
Additional Repack Legal Services Not Otherwise Specified in Form 399

Component Description:
Non-Catalog Legal Services such as preparation and review of quarterly transition status reports and other miscellaneous non-catalog legal fees
Amount:
$377.65

Component Description:
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellaneous non-catalog legal fees
Amount:
$178.00

Component Description:
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellaneous non-catalog legal fees
Amount:
$5,719.44

Component Description:
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellaneous non-catalog legal fees
Amount:
$784.00

Component Description:
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellaneous non-catalog legal fees
Amount:
$390.50

Component Description:
Non-Catalog Legal Services such as review of quarterly transition status reports
Amount:
$3,605.00

Component Description:
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellaneous non-catalog legal fees
Amount:
$721.50

Component Description:
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellaneous non-catalog legal fees
Amount:
$392.00

Component Description:
Non-catalog repack legal services such as drafting and posting of station certification with viewer notice requirements.
Amount:
$377.65

Component Description:
Non-Catalog Legal Services such as preparation and review of quarterly transition status reports and other miscellaneous non-catalog legal fees
Amount:
$2,670.53

Component Description:
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellaneous non-catalog legal fees
Amount:
$515.10

Component Description:
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellaneous non-catalog legal fees
Amount:
$222.50

Component Description:
June Invoice from Pillsbury revised 5-9-18
Amount:
$7,617.27

Component Description:
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellaneous non-catalog legal fees
Amount:
$35.50

Component Description:
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellaneous non-catalog legal fees
Amount:
$44.50

Component Description:
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellaneous non-catalog legal fees
Amount:
$133.50

Component Description:
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellaneous non-catalog legal fees
Amount:
$934.50

Component Description:
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellaneous non-catalog legal fees
Amount:
$2,385.90

Component Description:
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellaneous non-catalog legal fees
Amount:
$578.50

Component Description:
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellaneous non-catalog legal fees
Amount:
$768.50

Component Description:
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellaneous non-catalog legal fees
Amount:
$178.00

Component Description:
FCC Rules regarding repack; review coverage maps; FCC correspondence
Amount:
$1,708.39

Component Description:
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellaneous non-catalog legal fees
Amount:
$784.00

Component Description:
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellaneous non-catalog legal fees
Amount:
$44.50

Component Description:
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellaneous non-catalog legal fees
Amount:
$44.50

Component Description:
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellaneous non-catalog legal fees
Amount:
$489.50

Component Description:
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellaneous non-catalog legal fees
Amount:
$98.00

Component Description:
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellaneous non-catalog legal fees
Amount:
$89.00
Additional Repack Professional Services Not Otherwise Specified in Form 399

Component Description:
Installation Floater Policy - Extension to November 26, 2019
Amount:
$1,000.00

Component Description:
Total Material and Labor to Install New Electrical Work for Transmitter and Related Equipment
Amount:
$49,500.00

Component Description:
Installation Floater Policy - Extension to November 26, 2019
Amount:
$1,000.00

Component Description:
Installation Floater Policy (Federal Insurance Company( 9/27/2019-10/26/2019)
Amount:
$1,000.00
Attorney Fees - Prepare and File request for Special Temporary Authorization

Component Description:
Draft and file repack-related waiver/STA request; call and emails with client, engineers, and FCC staff relating to same.
Amount:
$5,661.50
Attorney Fees - Negotiation of lease and other matters for shared locations

Component Description:
leased antenna and line on Rehoboth tower
Amount:
$923.00
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application

Component Description:
Work on Form 2100 License to Cover Application
Amount:
$276.00
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
Correspondence regarding CP modification.
Amount:
$95.04

Component Description:
Correspondence regarding WLNE CP and potential need for modification work on CP extension.
Amount:
$1,267.00

Component Description:
form 2100 and schedule 399
Amount:
$4,029.50
Perform engineering study for new channel assignment and antenna development

Component Description:
du Triel, Lundin, Rackley 4-30-17 invoice
Amount:
$125.00
Prepare and or review reimbursement form

Component Description:
Prepare and or review reimbursement form
Amount:
$496.00

Component Description:
Prepare and or review reimbursement form
Amount:
$2,869.40

Component Description:
Legal fees for review and submission of WLNE Form 399 and correspondence with FCC staff regarding same.
Amount:
$8,556.00

Component Description:
Prepare and file post-assignment Form 1876 and validate in CORES II; emails with FCC staff regarding same
Amount:
$1,444.50

Component Description:
Modification of Form 399
Amount:
$745.50

Component Description:
Prepare and/or review reimbursement form
Amount:
$74.10

Component Description:
Prepare and/or review reimbursement form
Amount:
$543.40

Component Description:
Prepare and or review reimbursement form
Amount:
$567.70

Component Description:
Prepare and or review reimbursement form
Amount:
$172.90

Component Description:
Prepare and or review reimbursement form
Amount:
$3,699.00

Component Description:
Reimbursement Questions
Amount:
$1,044.12

Component Description:
Prepare and or review reimbursement form
Amount:
$178.00

Component Description:
Prepare and or review reimbursement form
Amount:
$1,847.70

Component Description:
Prepare and or review reimbursement form
Amount:
$2,427.50

Component Description:
Prepare and or review reimbursement form
Amount:
$1,477.90

Component Description:
Prepare and or review reimbursement form
Amount:
$719.30

Component Description:
Prepare and or review reimbursement form
Amount:
$1,230.60

Component Description:
Form 399 Construction Permit
Amount:
$852.00

Component Description:
Prepare and or review reimbursement form
Amount:
$325.30

Component Description:
Prepare and/or review Reimbursement form
Amount:
$740.60

Component Description:
Prepare and or review reimbursement form
Amount:
$35.50

Component Description:
Prepare and or review reimbursement form
Amount:
$196.80

Component Description:
Prepare and or review reimbursement form
Amount:
$532.70

Component Description:
Prepare and or review reimbursement form
Amount:
$370.50

Component Description:
Prepare and or review reimbursement form
Amount:
$199.60
Prepare request for Special Temporary Authorization

Component Description:
Prepare engineering STA and submit filing fee.
Amount:
$890.00

Component Description:
Work on Engineering STA Request and related filing fees and reproduction costs
Amount:
$1,814.23

Component Description:
Review of STA and correspondence regarding same.
Amount:
$531.20
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application Information not provided.
Perform engineering study for new channel assignment and antenna development

Component Description:
Coverage studies and map
Amount:
$375.00

Component Description:
Engineering study for new channel assignment and antenna development
Amount:
$2,500.00

Component Description:
WLNE updated application to specify elliptical polarization
Amount:
$250.00

Component Description:
du Treil, Lundin, Rackley 4-30-17 invoice
Amount:
$125.00

Component Description:
Engineering Study for New Channel Assignment and Antenna Development
Amount:
$500.00
Address transition timing and coordination issues w/ other stations and wireless

Component Description:
Address repack transition and timing issues with co-located station and wireless
Amount:
$3,306.50

Component Description:
Address transition timing and coordination issues w/ other stations and wireless
Amount:
$45.00
Prepare and or review reimbursement form

Component Description:
Work on Form 399 invoice review and reimbursement submissions; correspondence regarding same.
Amount:
$7,560.48

Component Description:
Work on Form 399 and correspondence regarding vendor invoices.
Amount:
$307.80

Component Description:
Prepare and/or review Reimbursement form
Amount:
$740.60

Component Description:
Review and prepare Form 399 invoices and reimbursement requests; respond to administrator emails regarding same
Amount:
$2,326.91

Component Description:
Work on Form 399 invoice review and reimbursement submissions; correspondence regarding same.
Amount:
$3,213.76

Component Description:
Work on Form 399 invoice review and reimbursement submissions; correspondence regarding same.
Amount:
$6,464.04

Component Description:
Work on Form 399; correspondence regarding same.
Amount:
$606.74

Component Description:
form 399 construction permit
Amount:
$852.00
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
Review and draft repack construction permit
Amount:
$6,247.50

Component Description:
Review WLNE Construction Permit
Amount:
$255.06

Component Description:
form 2100 and schedule 399
Amount:
$4,029.50

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $71,255.85 $69,260.85 N/A $23,665.85 N/A
Total for all systems $2,038,839.78 $1,316,151.11 N/A $930,129.75 N/A
Other Expenses $71,255.85 $69,260.85 $23,665.85
MVPD Notification of Channel Change $1,666.00 $1,666.00 N/A $1,666.00 N/A
Develop and air announcement of upcoming channel change $2,319.00 $2,319.00 N/A $2,319.00 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $10,000.00 $10,000.00 N/A N/A N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $190.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A $4,095.00 N/A
AM Pattern Disturbance -- Remedy $21,050.00 $20,000.00 N/A N/A N/A
AM Pattern Disturbance -- Impact study $7,890.00 $7,500.00 N/A N/A N/A
Local Zoning $1,000.00 $1,000.00 N/A N/A N/A
Other Expenses $15,585.85 $15,585.85 N/A $15,585.85 N/A

Components

Actual Information Description File Name
MVPD Notification of Channel Change

Component Description:
MVPD Notification of Channel Change
Amount:
$1,666.00

Component Description:
MVPD Notification of Channel Change
Amount:
$1,666.00
Develop and air announcement of upcoming channel change

Component Description:
Develop and air announcement of upcoming channel change
Amount:
$2,319.00
Disposal Costs (for equipment and other waste, net of any salvage value) Information not provided.
FCC Filing Fees - Special Temporary Authorization request Information not provided.
DTV Medical Facility Notification

Component Description:
Legal fees related to medical facility notifications
Amount:
$345.00

Component Description:
WLNE-TV Medical Notification Mailing
Amount:
$3,750.00
AM Pattern Disturbance -- Remedy Information not provided.
AM Pattern Disturbance -- Impact study Information not provided.
Local Zoning Information not provided.
Other Expenses

Component Description:
Dielectric Freight and Shipping - WLNE-TV AUX
Amount:
$484.62

Component Description:
Dielectric - Freight and Shipping (Rigid Transmission Line)
Amount:
$452.37

Component Description:
Dielectric - MA Sales Tax on Invoice 635024 (2 transformers)
Amount:
$265.63

Component Description:
Dielectric - MA Sales Tax on Invoice 648003 (Rigid Transmission Line)
Amount:
$107.44

Component Description:
Dielectric - MA Sales Tax on Invoice 606046 (Antenna)
Amount:
$11,147.63

Component Description:
Dielectric Freight and Shipping - WLNE-TV Antenna
Amount:
$2,558.36

Component Description:
Other transmitter expenses (Acetylene tank, oxygen tank, security deposit, delivery, and haz mat)
Amount:
$284.80

Component Description:
Flat bed tow for transmitter parts
Amount:
$285.00

Component Description:
Dielectric Freight and Shipping - WLNE-TV AUX
Amount:
$484.62

Component Description:
Dielectric - Freight and Shipping (Rigid Transmission Line)
Amount:
$452.37

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $2,038,839.78 $1,316,151.11 $930,129.75

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Deborah A. McDermott

President and CEO


09/17/2020

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Deborah A. McDermott

President and CEO


09/17/2020

Attachments