Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
WSOC TELEVISION, LLC Doing Business As: WSOC TELEVISION, LLC |
Director of Engineering 235 West 23rd Street CHARLOTTE, NC 28206 United States |
+1 (704) 335-4732 | ted.hand@cmg.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Ted Hand WSOC-TV, LLC |
Ted Hand 235 West 23rd Street Charlotte, NC 28206 United States |
+1 (704) 335-4732 | ted.hand@cmg.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Install new antenna, mask filter, transmitter |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | UAX-1000T | |
Year | 2009 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 2 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | VAXTE-2R37 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 2 kW | |
Justification for New Transmitter | Channel moved from UHF to VHF |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
New Mask Filter |
New Mask Filter for channel 12 |
Freight |
Freight |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 5.0 kW | |
Manufacturer | ||
Model | ALP-HSW-36 | |
Year | 2009 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Cross Dipole | |
ERP: | 3.0 kW | |
Manufacturer | ||
Model | 4X1K523057 | |
Year | 2019 | |
Justification for New Antenna | Moved from UHF to VHF |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Ownership | ||
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | ||
Is tower documented for structural analysis? | ||
Is tower compliant with Rev G? | ||
Existing Tower Structure Registration | Do you have a tower registration number? | |
Coordinates (NAD83) | Latitude (NAD83) | - - |
Longitude (NAD83) | - - | |
Overall Structure Height | ||
Support Structure Height | ||
Ground Elevation Above Mean Sea Level (AMSL) | ||
Structure Type | - | |
Tower Owner | ||
Date Constructed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
SkyHi Communications |
Remove and Install antenna |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | No |
Prepare engineering section of Form FCC Construction Permit Application | No | |
Prepare engineering section of Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
Prepare and file Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | No | |
Form 399 assistance or other program management costs | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
Merrill Weiss Group |
Engineering Study |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $107,800.00 | $48,800.00 | N/A | $44,658.06 | N/A |
Total for all systems | $122,720.00 | $72,544.54 | N/A | $68,157.16 | N/A |
Primary Transmitter VAXTE-2R37 | $107,800.00 | $48,800.00 | $44,658.06 | ||
Freight | $3,100.00 | $3,100.00 | N/A | $3,073.04 | N/A |
New Mask Filter | $3,700.00 | $3,700.00 | N/A | $3,635.10 | based on actual invoices |
High VHF - Air Cooled Solid State Transmitter 1.1 - 4.4 kW | $101,000.00 | $42,000.00 | N/A | $37,949.92 | N/A |
Actual Information Description | File Name |
---|---|
Freight | |
New Mask Filter | |
High VHF - Air Cooled Solid State Transmitter 1.1 - 4.4 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,120.00 | $9,944.54 | N/A | $9,782.11 | N/A |
Total for all systems | $122,720.00 | $72,544.54 | N/A | $68,157.16 | N/A |
Primary Antenna 4X1K523057 | $1,120.00 | $9,944.54 | $9,782.11 | ||
High-VHF, Low Power, Yagi/Cross-Dipole/Log Periodic Transmit Antenna | $1,120.00 | $9,944.54 | Based on actual invoice | $9,782.11 | based on actual invoices |
Actual Information Description | File Name |
---|---|
High-VHF, Low Power, Yagi/Cross-Dipole/Log Periodic Transmit Antenna |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $7,500.00 | $7,500.00 | N/A | $7,500.00 | N/A |
Total for all systems | $122,720.00 | $72,544.54 | N/A | $68,157.16 | N/A |
Primary Tower | $7,500.00 | $7,500.00 | $7,500.00 | ||
SkyHi Communications | $7,500.00 | $7,500.00 | N/A | $7,500.00 | N/A |
Actual Information Description | File Name |
---|---|
SkyHi Communications |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $0.00 | $0.00 | N/A | $0.00 | N/A |
Total for all systems | $122,720.00 | $72,544.54 | N/A | $68,157.16 | N/A |
Outside Professional Services | $0.00 | $0.00 | $0.00 |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $6,300.00 | $6,300.00 | N/A | $6,216.99 | N/A |
Total for all systems | $122,720.00 | $72,544.54 | N/A | $68,157.16 | N/A |
Other Expenses | $6,300.00 | $6,300.00 | $6,216.99 | ||
Merrill Weiss Group | $6,300.00 | $6,300.00 | Engineering Study for Channel 12 | $6,216.99 | N/A |
Actual Information Description | File Name |
---|---|
Merrill Weiss Group |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $122,720.00 | $72,544.54 | $68,157.16 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Ted Hand Director of Engineering/Operations 08/04/2020 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Ted Hand Director of Engineering /Operations 08/04/2020 |