Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
SOUTHEASTERN OHIO TELEVISION SYSTEM Doing Business As: SOUTHEASTERN OHIO TELEVISION SYSTEM |
Henry C Littick 629 Downard Road Zanesville, OH 43701 United States |
+1 (740) 452-5431 | hlittick@whizmediagroup.com | General Partnership |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Kevin J Buente Chief Engineer Southeastern Ohio Television System |
Kevin Buente 629 Downard Road Zanesville, OH 43701 United States |
+1 (740) 452-5431 | kbuente@whizmediagroup.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Install new Tx, and interim antenna. Switch over to interim antenna with existing Tx. Install new top mount antenna, plumb RF to new antenna. Test. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Sigma CD | |
Year | 2001 | |
Type | Inductive Output Tube | |
IOT Power Type | Two | |
Power Capacity | 50 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | ULXTE-40 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 25.3 kW | |
Justification for New Transmitter | Gates Air unable to retune old IOT transmitter. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Labor and parts to supply power to WHIZ transmitter. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Primary Transmitter - Other Parts |
Other parts required for transmitter installation |
Mask Filter |
40kW UHF, 6-Sections, 3db Ybrid, Channel 30 |
Estimated Tax |
Tax |
Estimated Shipping |
Shipping |
RF Test Load |
40kW broadband UHF Testing Load |
Installation and Proof |
Install and Proof of Performance of new transmitter system. |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels | 40 | |
Design power capacity in use | 100.0 % | |
Lower Limit | 479.00 MHz | |
Upper Limit | 632.00 MHz | |
Other Antenna Type | N/A | |
ERP: | 620.0 kW | |
Manufacturer | ||
Model | TFU-O4-10/40H-1-T | |
Year | 2006 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 506.0 kW | |
Manufacturer | ||
Model | ATW16H2-ETOX-30H | |
Year | 2019 | |
Justification for New Antenna | Existing antenna can not meet pattern requirements of assigned channel. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 16 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 700.00 MHz | |
Design power capacity in use | 95.0 % | |
Other Antenna Type | N/A | |
ERP: | 500.0 kW | |
Manufacturer | ||
Model | 230ECN-16-30/40 | |
Year | 2019 | |
Justification for New Antenna | Move ch.40 over to interim antenna to replace current top mount antenna with new ch.30 top mount antenna. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | Dielectric |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Other Diameter | N/A | |
Segment Length | Broadband | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 585 feet per run |
Name | Description |
---|---|
Line Sweep and Tune |
Tune Elbow Complexes to correct Channel |
Rigid Transmission Line - Copper |
Rigid transmission line piece to connect existing line to antenna |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Flexible Air | |
Diameter | 5 inches | |
Segment Length | N/A | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 491 feet per run | |
Justification for New Transmission Line | Provide RF to interim aux antenna that is being rented. |
Name | Description |
---|---|
threaded rod kit |
3/8-inch threaded rod kit. Includes qty 5 12-inch rod, ceiling mounting plate, nuts/washers for use with EWG or HELIAX. |
Half inch hardware |
1/2-inch hardware, kit of 10, with 1-1/4-inch fillister-head bolts, lock washers and nuts. |
Hoisting Grip Kit |
Hoisting grip hanger kit to attach HELIAX hoisting grips to tower. Includes 18-inches of chain, 12-inch x 12-inch turnbuckle, and two shackles. One required for each hoisting grip and one hoisting grip required for each 200-feet of vertical run |
Round member adapter |
Round member adapter for 4 to 5-inch round members. Kit of 10. Stainless steel clamps to mount 1/2 to 4-inch cable hangers to round support members. Two each are required for 3 and 4-inch cable hangers. |
Standard Hangers |
Standard hangers, kit of 10, for 5-inch coaxial cable and EW20 HELIAX waveguide |
Wall Feed Through |
Wall/Roof Feed Thru, Single Entrance, for 5-inch cable |
EIA Flanges |
6-1/8 in EIA Female Flange with gas barrier for 5-inch air HELIAX (HJ9-series). |
Ground Kit |
Grounding kit, qty. 1, 24-inch cable with 1-hole factory attached lug for 5-inch coax |
Hoisting Grip |
Hoisting Grip for 5-inch coaxial cables |
threaded rod kit |
3/8-inch threaded rod kit. Includes qty 5 24-inch rod, ceiling mounting plate, nuts/washers for use with EWG or HELIAX. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1232923 | |
Coordinates (NAD83) | Latitude (NAD83) | 39° 55' 42.0" N- |
Longitude (NAD83) | 081° 59' 07.0" W- | |
Overall Structure Height | 502.95 feet | |
Support Structure Height | 459.97 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 908.13 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Southeastern Ohio Television System | |
Date Constructed | 06/19/2002 |
Facility ID | Call Sign | Service |
---|---|---|
183304 | WZVL | FM |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Serious Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | Yes |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 595 | |
Explanation | WHIZ-TV requires the aid of outside project management services in order to fulfill the requirements of the repack. WHIZ-TV does not have sufficient resource capacity and expertise in house to handle all of the reimbursement repack tasks. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | Yes | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
DowTherm Removal |
Coolant for existing transmitter has to be properly disposed of. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,237,692.20 | $1,050,264.90 | N/A | $1,049,999.66 | N/A |
Total for all systems | $3,298,681.26 | $2,198,665.29 | N/A | $1,888,845.38 | N/A |
Primary Transmitter ULXTE-40 | $1,237,692.20 | $1,050,264.90 | $1,049,999.66 | ||
Primary Transmitter - Other Parts | $265.17 | $265.17 | Please see WHIZ-TV Primary Transmitter - Other Parts, Equipment Delivery and Handling Budget Justification Cover Letter | $265.17 | N/A |
RF Test Load | $20,637.08 | $20,637.08 | Estimated Cost Justification WHIZ-110-1st Primary Transmitter - RF Test Load v0 | $20,637.08 | N/A |
Other Electrical Service: Labor and parts to supply power to WHIZ transmitter. | $28,948.72 | $28,948.72 | Please see WHIZ-TV Primary Transmitter - Electrical Revision Justification Cover Letter | $28,948.72 | N/A |
Mask Filter | $145,806.75 | $145,806.75 | Estimated Cost Justification WHIZ-110-1st Primary Transmitter - Mask Filter v0 | $145,806.75 | N/A |
Estimated Tax | $0.00 | $0.00 | N/A | $0.00 | N/A |
Estimated Shipping | $0.00 | $0.00 | N/A | $0.00 | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $9,949.83 | per Estimated Cost Justification WHIZ-110-1st Primary Transmitter - Transformer 3-phase/480v - 150 KVA v0 | $9,949.81 | N/A |
Installation and Proof | $69,484.48 | $69,484.48 | See Estimated Cost Justification WHIZ-110-1st Primary Transmitter - Installation and Proof v1 | $69,484.46 | N/A |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW | $947,000.00 | $775,172.87 | per Estimated Cost Justification WHIZ-110-1st Primary Transmitter - UHF Liquid Cooled Solid State 21-31 kW v1 | $774,907.67 | N/A |
Actual Information Description | File Name |
---|---|
Primary Transmitter - Other Parts | |
RF Test Load | |
Other Electrical Service: Labor and parts to supply power to WHIZ transmitter. | |
Mask Filter | |
Estimated Tax | Information not provided. |
Estimated Shipping | Information not provided. |
Transformer 3 phase/480v - 150 KVA | |
Installation and Proof | |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $484,082.04 | $461,070.80 | N/A | $330,589.49 | N/A |
Total for all systems | $3,298,681.26 | $2,198,665.29 | N/A | $1,888,845.38 | N/A |
Interim Antenna 230ECN-16-30/40 | $187,852.04 | $173,320.80 | $173,320.80 | ||
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $8,618.76 | Please see WHIZ-280-Interim Antenna - Side Mount Brackets Cost Increase Justification Cover Letter V.0 | $8,618.76 | N/A |
UHF - High Power, Side Mount, broadband panel, 16 bay,, 500 kW input, directional,, elliptically or circularly polarized | $164,702.04 | $164,702.04 | Please see WHIZ-280-Interim Antenna - UHF High Power Side Mount Direction, E-POL Cost Increase Justification Cover Letter V.0 | $164,702.04 | N/A |
Primary Antenna ATW16H2-ETOX-30H | $296,230.00 | $287,750.00 | $157,268.69 | ||
Sweep test of existing antenna | $6,730.00 | $6,250.00 | N/A | $0.00 | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | $289,500.00 | $281,500.00 | N/A | $157,268.69 | N/A |
Actual Information Description | File Name |
---|---|
Side mount brackets for high power antennas (if not included in antenna base cost) | |
UHF - High Power, Side Mount, broadband panel, 16 bay,, 500 kW input, directional,, elliptically or circularly polarized | |
Sweep test of existing antenna | Information not provided. |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $61,932.06 | $50,609.63 | N/A | $50,609.62 | N/A |
Total for all systems | $3,298,681.26 | $2,198,665.29 | N/A | $1,888,845.38 | N/A |
Interim Transmission Line | $51,555.00 | $40,232.57 | $40,232.56 | ||
Hoisting Grip | $0.00 | $0.00 | N/A | $0.00 | N/A |
Ground Kit | $0.00 | $0.00 | N/A | $0.00 | N/A |
EIA Flanges | $0.00 | $0.00 | N/A | $0.00 | N/A |
Wall Feed Through | $0.00 | $0.00 | N/A | $0.00 | N/A |
Standard Hangers | $0.00 | $0.00 | N/A | $0.00 | N/A |
Round member adapter | $0.00 | $0.00 | N/A | $0.00 | N/A |
Hoisting Grip Kit | $0.00 | $0.00 | N/A | $0.00 | N/A |
Flexible Air Transmission Line - dielectric, 5" | $51,555.00 | $40,232.57 | see Estimated Cost Justification WHIZ-380-Interim Transmission Line - 3_ Flexible Air v1 | $40,232.56 | N/A |
threaded rod kit | $0.00 | $0.00 | N/A | $0.00 | N/A |
Half inch hardware | $0.00 | $0.00 | N/A | $0.00 | N/A |
Primary Transmission Line | $10,377.06 | $10,377.06 | $10,377.06 | ||
Rigid Transmission Line - Copper | $3,673.94 | $3,673.94 | See Estimated Cost Justification WHIZ-310-1st Primary Transmission Line - Rigid Transmission Line v0 | $3,673.94 | N/A |
Line Sweep and Tune | $6,703.12 | $6,703.12 | per Estimated Cost Justification WHIZ-310-Primary Transmission Line - Line Sweep and Tune v0 | $6,703.12 | N/A |
Actual Information Description | File Name |
---|---|
Hoisting Grip | Information not provided. |
Ground Kit | Information not provided. |
EIA Flanges | Information not provided. |
Wall Feed Through | |
Standard Hangers | |
Round member adapter | |
Hoisting Grip Kit | |
Flexible Air Transmission Line - dielectric, 5" | |
threaded rod kit | Information not provided. |
Half inch hardware | |
Rigid Transmission Line - Copper | |
Line Sweep and Tune |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,353,800.00 | $480,700.00 | N/A | $398,700.00 | N/A |
Total for all systems | $3,298,681.26 | $2,198,665.29 | N/A | $1,888,845.38 | N/A |
Primary Tower TOWER | $1,353,800.00 | $480,700.00 | $398,700.00 | ||
Tower Helicopter Lift | $65,000.00 | $65,000.00 | Please see WHIZ Worldwide Communications Consultants Proposal 191029201 | $65,000.00 | N/A |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $12,000.00 | see Estimated Cost Justification WHIZ-410-Existing Primary Tower - Tower Mapping, Undocumented Tower v0 | $12,000.00 | N/A |
Serious tower reinforcement/modifications | $1,052,000.00 | $321,700.00 | Please see WHIZ-TV Proposal 190426-201 Worldwide Comm and WHIZ Proposal 190530-201 | $321,700.00 | N/A |
Tall Tower (greater than 500') | $210,500.00 | $82,000.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Helicopter Lift | |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | |
Serious tower reinforcement/modifications | |
Tall Tower (greater than 500') | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $127,625.00 | $129,225.00 | N/A | $57,641.65 | N/A |
Total for all systems | $3,298,681.26 | $2,198,665.29 | N/A | $1,888,845.38 | N/A |
Outside Professional Services | $127,625.00 | $129,225.00 | $57,641.65 | ||
Project management of the transition | $94,010.00 | $99,675.00 | Please see Widelity Strategic Support proposal | $56,391.65 | N/A |
DowTherm Removal | $800.00 | $800.00 | N/A | $0.00 | N/A |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | $2,105.00 | $0.00 | N/A | $0.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | $375.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $0.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $0.00 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | $0.00 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $0.00 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $3,500.00 | N/A | $0.00 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | $0.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $0.00 | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $1,500.00 | N/A | $875.00 | N/A |
Actual Information Description | File Name |
---|---|
Project management of the transition | |
DowTherm Removal | Information not provided. |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for new channel assignment and antenna development | Information not provided. |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Prepare and or review reimbursement form | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare request for Special Temporary Authorization |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $33,549.96 | $26,794.96 | N/A | $1,304.96 | N/A |
Total for all systems | $3,298,681.26 | $2,198,665.29 | N/A | $1,888,845.38 | N/A |
Other Expenses | $33,549.96 | $26,794.96 | $1,304.96 | ||
Equipment Delivery and Handling Charges | $1,304.96 | $1,304.96 | Please see WHIZ-TV Primary Transmitter - Other Parts, Equipment Delivery and Handling Budget Justification Cover Letter | $1,304.96 | N/A |
DTV Medical Facility Notification | $11,550.00 | $4,800.00 | N/A | $0.00 | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | N/A | $0.00 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $2,000.00 | $2,000.00 | N/A | $0.00 | N/A |
Develop and air announcement of upcoming channel change | $13,500.00 | $13,500.00 | N/A | $0.00 | N/A |
MVPD Notification of Channel Change | $5,000.00 | $5,000.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Equipment Delivery and Handling Charges | |
DTV Medical Facility Notification | Information not provided. |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Develop and air announcement of upcoming channel change | Information not provided. |
MVPD Notification of Channel Change | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $3,298,681.26 | $2,198,665.29 | $1,888,845.38 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Kevin J Buente Chief Engineer 02/01/2021 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Kevin J Buente Chief Engineer 02/01/2021 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Kevin J Buente Chief Engineer 02/01/2021 |