Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
Steward Doing Business As: DAWN STEWART |
310 NORTH CENTER AVE HARDIN, MT 59034 United States |
+1 (406) 665-1832 | Montana@Digitaldevelopment.net | Individual |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Tony zumMallen Anywave Communications Technologies |
Tony zumMallen 705B SE Melody LN Lees SUmmit, MO 64063 United States |
+1 (816) 729-1177 | tony.zummallen@anywavecom.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | To migrate the transmission from Ch 43 to Ch 33 as efficiently and with as little downtime as possible in order to preserve customer satisfaction and meet the FCC requirements for reimbursement and licensing |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | MXi 100 | |
Year | 2005 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 100 W |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TRN-U-200-FA | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 280 W | |
Justification for New Transmitter | EXISTING TRANSMITTER NOT CAPABLE OF OPERATING ON NEW CHANNEL ASSIGNMENT |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
SITE PREPARATION |
PREPARE SITE FOR NEW SYSTEM INTEGRATION |
SALES TAX |
EXPECTED SALES TAX FOR EQUIPMENT |
SHIPPING AND HANDLING |
EXPECTED SHIPPING AND HANDLING OF NEW EQUIPMENT |
DECOMMISSIONING |
DECOMMISSION AND REMOVE EXISTING EQUIPMENT |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 75 | |
Explanation | Required to assist in the turnkey management of the channel relocation project in order that the existing internal personnel can maintain and operate the stations daily operational requirements and plans | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Prepare Form 601 | Yes | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 3 | |
Justification | Estimated field engineering services during transition activities. Actual costs to be determined. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | Yes |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $51,200.00 | $42,785.00 | N/A | $23,385.00 | N/A |
Total for all systems | $145,960.00 | $129,467.00 | N/A | $26,385.00 | N/A |
Primary Transmitter TRN-U-200-FA | $51,200.00 | $42,785.00 | $23,385.00 | ||
SALES TAX | $3,000.00 | $3,000.00 | N/A | N/A | N/A |
SITE PREPARATION | $5,000.00 | $5,000.00 | Estimated costs to prepare site for installation. Includes receiving and inventory of transmitter and its components; pre-assembly of cabinets and subassemblies; ensuring site has materials required by installation crew. | N/A | N/A |
SHIPPING AND HANDLING | $1,000.00 | $1,000.00 | N/A | $300.00 | N/A |
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $7,200.00 | 3/30/2020- Working to obtain quote which may be delayed due to coronavirus pandemic | N/A | N/A |
DECOMMISSIONING | $3,500.00 | $3,500.00 | Estimated costs to de-install, disconnect and decommission old transmitter. | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 160 - 300 Watts | $24,300.00 | $23,085.00 | Cost determined from Anywave Invoice (with attached proposal) submitted on 4/10/20 | $23,085.00 | N/A |
Actual Information Description | File Name |
---|---|
SALES TAX | Information not provided. |
SITE PREPARATION | Information not provided. |
SHIPPING AND HANDLING | |
Service entrance 3 phase/800 amp/208 volt | Information not provided. |
DECOMMISSIONING | Information not provided. |
UHF - Air Cooled Solid State Transmitter 160 - 300 Watts |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $86,050.00 | $77,972.00 | N/A | $3,000.00 | N/A |
Total for all systems | $145,960.00 | $129,467.00 | N/A | $26,385.00 | N/A |
Outside Professional Services | $86,050.00 | $77,972.00 | $3,000.00 | ||
Comprehensive coverage verification via field study, if needed | $52,600.00 | $43,732.00 | Per-attached quote number 721-R for Coverage Verification | N/A | N/A |
Additional Field Engineering Service, 3 Days | $7,500.00 | $7,500.00 | 3 DAYS OF FIELD ENGINEERING TO AFFET THE TRANSITION AT 2,500 DAY | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $2,235.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | N/A | N/A |
Prepare Form 601 | $755.00 | $755.00 | 3/30/2020- Working to obtain quote which may be delayed due to coronavirus pandemic | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $1,280.00 | $1,280.00 | N/A | N/A | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | N/A | N/A | N/A |
Form 399 assistance or other Program Management costs | $2,500.00 | $2,500.00 | PER ATTACHED ANYWAVE QUOTE | $500.00 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $2,500.00 | PER ATTACHED ANYWAVE QUOTE | $2,500.00 | N/A |
Project management of the transition | $7,912.50 | $7,912.50 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Comprehensive coverage verification via field study, if needed | Information not provided. |
Additional Field Engineering Service, 3 Days | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare Form 601 | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
Perform engineering study for displacement application | Information not provided. |
Form 399 assistance or other Program Management costs | |
Prepare/ Review 399 reimbursement form | |
Project management of the transition | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $8,710.00 | $8,710.00 | N/A | $0.00 | N/A |
Total for all systems | $145,960.00 | $129,467.00 | N/A | $26,385.00 | N/A |
Other Expenses | $8,710.00 | $8,710.00 | $0.00 | ||
Disposal Costs (for equipment and other waste, net of any salvage value) | $2,000.00 | $2,000.00 | 3/30/2020- Working to obtain quote which may be delayed due to coronavirus pandemic | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $305.00 | $305.00 | 3/30/2020- Working to obtain quote which may be delayed due to coronavirus pandemic | N/A | N/A |
FCC Filing Fees - Form 2100 Major change CP application | $4,960.00 | $4,960.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $145,960.00 | $129,467.00 | $26,385.00 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | AL Sargent Applicant 08/28/2020 |