Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
82910
Service:
DTV
Call Sign:
KSCC
Channel:
19 (UHF)
File Number:
0000028631
FRN:
0024962136
Date Submitted:
09/24/2020

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

KSCC Licensee, LLC

Doing Business As: KSCC Licensee, LLC

Harvey Arnold

10706 Beaver Dam Road

Cockeysville, MD 21030

United States

+1 (410) 568-1500 FCCContacts@sbgtv.com Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Paul A. Cicelski , Esq .

Lerman Senter PLLC

Paul Cicelski, Esq.

2001 L Street NW

Suite 400

Washington, DC 20036

United States

+1 (202) 416-6756 sinclair399s@summitridgegroup.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan See Exhibit A.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Auxiliary Transmitter

Back to Top

Add Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use KUQI (Backup) Transmitter
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model SSTVU-2000
Year 2001
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 2 kW

Auxiliary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Auxiliary (Backup)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model UAXTE-4
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 2.2 kW
Justification for New Transmitter The current auxiliary transmitter cannot be retuned because the manufacturer is no longer in business.

Auxiliary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 5 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Auxiliary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Quantum QDX1
Year 2009
Type Inductive Output Tube
IOT Power Type Single
Power Capacity 30 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model THU9evo-10
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 15 kW
Justification for New Transmitter Per the manufacturer, the current transmitter cannot be retuned. See Exhibit B.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 300 kVA
Rigid Conduit and Wiring Yes
Size 2 inches
Length 800.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 225.0 square feet
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Additional Parts

Additional Parts

Additional Work

Additional Work

Consolidation

Consolidation

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 50.0 kW
Manufacturer
Model TFU-20JSC-R 3P260
Year 2009

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 32.9 kW
Manufacturer
Model TFU-20JSC/VP-R 3P260
Year 2017
Justification for New Antenna Current antenna is a single channel antenna that cannot be used for the new post-auction channel.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 4 1/16 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Broadband Panel
Number of Stations Supported 1
Number of Panels/Bays 8
Lower Limit 470.00 MHz
Upper Limit 598.00 MHz
Design power capacity in use 10.0 %
Other Antenna Type N/A
ERP: 32.9 kW
Manufacturer
Model TFU-8WB/VP
Year 2017
Justification for New Antenna Interim antenna will be used to support the station and keep it on the air while the main antenna undergoes construction.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? B
Feed Line Size 3 1/8 inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 4 1/16 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 1
Length 875 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 4 1/16 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 905 feet per run
Justification for New Transmission Line The section sizes are frequency-specific and the current transmission line cannot be used with the post-repack channel.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Flexible Air
Diameter 3 inches
Segment Length N/A
Other Segment Length
Number of parallel runs 1
Length 500 feet per run
Justification for New Transmission Line Interim transmission line will feed the interim antenna.

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? No
One or more FM, AM or TV radio broadcaster(s) N/A
Others Types of Users N/A
Is tower documented for structural analysis? No
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1211245
Coordinates (NAD83) Latitude (NAD83) 27° 45' 32.9" N-
Longitude (NAD83) 097° 36' 27.3" W-
Overall Structure Height 833.98 feet
Support Structure Height 830.04 feet
Ground Elevation Above Mean Sea Level (AMSL) 61.02 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner American Towers, LLC
Date Constructed 03/15/2000


Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for undocumented/poorly documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Major Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Broadcast Rent

Broadcast Rent

Tower Permit Drawing Package

Tower permit drawing package

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 470
Explanation Outside consulting engineering, legal work, and accounting services, as well as project management for regional and comprehensive repack execution.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 2
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 2
NEPA Section 106 environmental review Yes
Environmental Assessment Yes
ASR Modification Yes
FAA Consultation (including preparation of FAA Form 7460) Yes
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements No
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Sinclair Internal Costs

Internal Employee Time Costs

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning Yes
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Forklift Rental

Forklift Rental

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,123,876.38 $591,098.88 N/A $190,410.50 N/A
Total for all systems $2,662,152.18 $2,073,307.22 N/A $898,975.41 N/A
Primary Transmitter THU9evo-10 $977,626.38 $451,848.88 $190,410.50
Additional Work $15,850.00 $15,850.00 N/A $15,850.00 N/A
Consolidation $8,100.00 $8,100.00 N/A $8,100.00 N/A
Additional Parts $3,738.00 $3,738.00 N/A $3,738.00 N/A
Other -- Building Addition Size: 225.0 $170,138.38 $170,138.38 This building is too small to accommodate the new equipment, but this addition will not be necessary if a solid state transmitter can be purchased and reimbursed. See Response to August 14 Inquiry. N/A N/A
2" Rigid Conduit and Wiring (Cost per foot) $20,800.00 $20,000.00 N/A N/A N/A
Transformer 3 phase/480v - 300 KVA $36,800.00 $35,000.00 N/A N/A N/A
Switchgear - industrial 800 amp $38,200.00 $36,300.00 N/A N/A N/A
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW $684,000.00 $162,722.50 N/A $162,722.50 N/A
Auxiliary Transmitter UAXTE-4 $146,250.00 $139,250.00 $0.00
5 Ton system $20,250.00 $19,250.00 N/A N/A N/A
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW $126,000.00 $120,000.00 N/A N/A N/A

Components

Actual Information Description File Name
Additional Work

Component Description:
Additional work. #9500122741
Amount:
$15,850.00
Consolidation

Component Description:
Consolidation cost. #9500118312
Amount:
$8,100.00
Additional Parts

Component Description:
Additional parts. #9500117118
Amount:
$3,738.00
Other -- Building Addition Size: 225.0 Information not provided.
2" Rigid Conduit and Wiring (Cost per foot) Information not provided.
Transformer 3 phase/480v - 300 KVA Information not provided.
Switchgear - industrial 800 amp Information not provided.
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW

Component Description:
Transmitter related cost 25%. #9500101103
Amount:
$40,680.62

Component Description:
Transmitter related cost 75%. #9500117274
Amount:
$122,041.88
5 Ton system Information not provided.
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW Information not provided.

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $315,130.22 $313,488.76 N/A $205,618.16 N/A
Total for all systems $2,662,152.18 $2,073,307.22 N/A $898,975.41 N/A
Interim Antenna TFU-8WB/VP $86,544.22 $84,066.62 $53,186.62
Elbow complex, broadband, at antenna input, per 3 1/8. feedline (if needed) $9,340.00 $8,880.00 N/A N/A N/A
Sweep test of existing antenna $6,730.00 $5,862.40 N/A $5,862.40 N/A
UHF - High Power, Side Mount, broadband panel, 8 bay,, 33 kW input, directional,, elliptically or circularly polarized $47,324.22 $47,324.22 ***System Notice: Estimate adjusted and locked because line has been superseded.***This is a Widelity Report Cost Catalog pre-fill cost, however, it did not pre-fill in this section for this cost. This is the corresponding piece of equipment's cost estimate. $47,324.22 N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $22,000.00 N/A N/A N/A
Primary Antenna TFU-20JSC/VP-R 3P260 $228,586.00 $229,422.14 $152,431.54
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) $9,570.00 $12,146.14 See Dielectric Quote. $12,146.14 N/A
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $5,000.00 N/A N/A N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $22,000.00 N/A $15,045.30 N/A
UHF - High Power, Side Mount, basic slot antenna, 33 kW input, directional,, elliptically or circularly polarized $183,876.00 $183,876.00 See Response to August 14 Inquiry. $125,240.10 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A N/A N/A

Components

Actual Information Description File Name
Elbow complex, broadband, at antenna input, per 3 1/8. feedline (if needed) Information not provided.
Sweep test of existing antenna

Component Description:
Antenna related cost reduced by 8.40%. #752028
Amount:
$5,862.40
UHF - High Power, Side Mount, broadband panel, 8 bay,, 33 kW input, directional,, elliptically or circularly polarized

Component Description:
Total invoice amount reduced by 8.40%. #708019
Amount:
$47,324.22
Side mount brackets for high power antennas (if not included in antenna base cost) Information not provided.
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed)

Component Description:
Total invoice amount reduced by 8.40%. #710001
Amount:
$7,674.24

Component Description:
Antenna related cost reduced by 8.40%. #734005
Amount:
$2,304.65

Component Description:
Total invoice amount reduced by 8.40%. #730023
Amount:
$2,167.25
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) Information not provided.
Side mount brackets for high power antennas (if not included in antenna base cost)

Component Description:
Antenna related cost reduced by 8.40%. #722011
Amount:
$15,045.30
UHF - High Power, Side Mount, basic slot antenna, 33 kW input, directional,, elliptically or circularly polarized

Component Description:
Antenna related cost reduced 8.40%. #722011
Amount:
$125,240.10
Sweep test of existing antenna Information not provided.

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $158,010.00 $150,175.00 N/A $98,067.94 N/A
Total for all systems $2,662,152.18 $2,073,307.22 N/A $898,975.41 N/A
Interim Transmission Line $29,500.00 $28,000.00 $15,533.32
Flexible Air Transmission Line - dielectric, 3" $29,500.00 $28,000.00 N/A $15,533.32 N/A
Primary Transmission Line $128,510.00 $122,175.00 $82,534.62
Rigid Transmission Line - copper, 4 1/16" $128,510.00 $122,175.00 N/A $82,534.62 N/A

Components

Actual Information Description File Name
Flexible Air Transmission Line - dielectric, 3"

Component Description:
Transmission line related cost reduced by 25.40%. #620003
Amount:
$15,533.32
Rigid Transmission Line - copper, 4 1/16"

Component Description:
Transmission line related cost reduced by 8.40%. #725011
Amount:
$1,045.15

Component Description:
Total invoice amount reduced by 8.40%. #710001
Amount:
$81,489.47

Component Description:
Transmission line related cost reduced by 8.40%. #730023
Amount:
$2,167.25

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $700,900.00 $686,237.00 N/A $318,216.00 N/A
Total for all systems $2,662,152.18 $2,073,307.22 N/A $898,975.41 N/A
Primary Tower TOWER $700,900.00 $686,237.00 $318,216.00
Tower Permit Drawing Package $4,700.00 $4,700.00 N/A $4,700.00 N/A
Broadcast Rent $38,400.00 $38,400.00 N/A $38,400.00 N/A
Major tower reinforcement/modifications $421,000.00 $400,000.00 N/A $31,979.00 N/A
Tall Tower (greater than 500') $210,500.00 $216,317.00 See FDH quote. $216,317.00 N/A
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study $26,300.00 $26,820.00 See American Tower quote $26,820.00 N/A

Components

Actual Information Description File Name
Tower Permit Drawing Package

Component Description:
Tower permit drawing package. #377991
Amount:
$4,700.00
Broadcast Rent

Component Description:
Tower related cost. #406783459
Amount:
$38,400.00
Major tower reinforcement/modifications

Component Description:
Tower related cost. #SIN005596
Amount:
$15,989.50

Component Description:
Tower related cost. #SIN002045
Amount:
$15,989.50
Tall Tower (greater than 500')

Component Description:
Tower related cost. #460222427
Amount:
$2,500.00

Component Description:
Tower related cost. #SIN002045
Amount:
$106,908.50

Component Description:
Tower related cost. #SIN005596
Amount:
$106,908.50
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study

Component Description:
Tower related cost. #460224953
Amount:
$16,345.00

Component Description:
Tower related cost. #460224952
Amount:
$10,475.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $224,720.00 $193,357.00 N/A $53,475.74 N/A
Total for all systems $2,662,152.18 $2,073,307.22 N/A $898,975.41 N/A
Outside Professional Services $224,720.00 $193,357.00 $53,475.74
Sinclair Internal Costs $4,570.00 $4,570.00 N/A $4,511.52 N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $80,000.00 N/A N/A N/A
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase $2,105.00 $2,000.00 N/A N/A N/A
ASR modification (prepare FCC Form 854) $2,105.00 $0.00 N/A N/A N/A
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet $10,520.00 $10,000.00 N/A N/A N/A
NEPA Section 106 environmental review, if needed $6,310.00 $6,000.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $7,360.00 $0.00 N/A N/A N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $0.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $0.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $122.00 N/A $122.00 N/A
Prepare request for Special Temporary Authorization $4,100.00 $3,000.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,165.00 See Carl T. Jones invoices. $3,165.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $772.50 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A
Prepare and or review reimbursement form $2,630.00 $3,000.00 Updated cost of estimated amount per FCC requirement. $2,055.99 N/A
Project management of the transition $74,260.00 $70,500.00 N/A $42,848.73 The $91.76 line item from August 2017 should be removed due to a requested revision of this invoice by FCC staff.

Components

Actual Information Description File Name
Sinclair Internal Costs

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$15.08

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$7.86

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$25.53

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$16.53

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$9.47

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$33.53

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$17.02

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$23.96

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$6.09

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$8.66

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$5.37

Component Description:
Portion of general repack matter internal time card attributable to this station - divided by 100.
Amount:
$66.55

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$1.69

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$7.96

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$11.39

Component Description:
Internal expense - KSCC - 2-2020
Amount:
$4,227.90

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$26.93

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$32.09
Comprehensive coverage verification via field study, if needed Information not provided.
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase Information not provided.
ASR modification (prepare FCC Form 854) Information not provided.
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet Information not provided.
NEPA Section 106 environmental review, if needed Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees - Negotiation of lease and other matters for shared locations Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 98 stations. #461759
Amount:
$99.92

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 93 stations. #461289
Amount:
$122.00

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 93 stations.
Amount:
$122.35
Prepare request for Special Temporary Authorization Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Outside professional service cost. #878-85-0003
Amount:
$1,425.00

Component Description:
Consulting engineering cost.
Amount:
$1,740.00
Perform engineering study for new channel assignment and antenna development

Component Description:
Consulting engineering cost.
Amount:
$772.50
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Prepare and or review reimbursement form

Component Description:
Legal services cost.
Amount:
$230.00

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 93 stations.
Amount:
$152.01

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 93 stations.
Amount:
$1,315.27

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 98 stations. #461759
Amount:
$869.30

Component Description:
Legal services cost.
Amount:
$362.50

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 93 stations. #461289
Amount:
$1,311.48
Project management of the transition

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #132
Amount:
$589.44

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 98 stations. #467861
Amount:
$470.30

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #477820
Amount:
$320.19

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1117
Amount:
$282.68

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1114
Amount:
$242.25

Component Description:
Legal services cost. #477893
Amount:
$268.75

Component Description:
Legal Service Cost. #470902
Amount:
$221.25

Component Description:
Legal Service Cost. #472657
Amount:
$163.75

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1111
Amount:
$159.58

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #470923
Amount:
$406.65

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 98 stations. #465173
Amount:
$654.26

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 40 stations. #141
Amount:
$1,800.46

Component Description:
Legal services cost. #478843
Amount:
$1,421.50

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 98 stations. #1055
Amount:
$243.38

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1099
Amount:
$266.93

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #118
Amount:
$468.97

Component Description:
Legal services cost. #460914
Amount:
$425.00

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1098
Amount:
$238.07

Component Description:
Project management cost. #377991
Amount:
$9,480.00

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 98 stations.
Amount:
$596.30

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #470237
Amount:
$436.37

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1151
Amount:
$388.07

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1167
Amount:
$313.41

Component Description:
Legal Service Cost. #470306
Amount:
$541.25

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1130
Amount:
$281.49

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1123
Amount:
$342.14

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #469573
Amount:
$377.14

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #472173
Amount:
$311.78

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #473506
Amount:
$421.40

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #476367
Amount:
$364.80

Component Description:
Legal services cost. #474475
Amount:
$51.25

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1161
Amount:
$267.48

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #461759
Amount:
$709.74

Component Description:
Legal services cost. #474893
Amount:
$108.75

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1145
Amount:
$369.98

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1141
Amount:
$406.17

Component Description:
Legal Service Cost. #478332
Amount:
$57.50

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #475283
Amount:
$384.08

Component Description:
Legal services cost. #480225
Amount:
$1,447.50

Component Description:
Legal services cost. #476449
Amount:
$102.50

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 93 stations.
Amount:
$91.76

Component Description:
Legal Service Cost. #467928
Amount:
$50.00

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1093
Amount:
$265.72

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 98 stations. #1069
Amount:
$246.68

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 93 stations.
Amount:
$716.28

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 98 stations. #1058
Amount:
$187.24

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 93 stations.
Amount:
$943.95

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 93 stations.
Amount:
$999.04

Component Description:
Legal Service Cost. #466776
Amount:
$120.00

Component Description:
Legal services cost. #464386
Amount:
$235.00

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 99 stations. #1086
Amount:
$275.35

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #474809
Amount:
$395.77

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 98 stations. #464321
Amount:
$683.07

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 98 stations. #1079
Amount:
$177.14

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1133
Amount:
$307.72

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 98 stations. #463567
Amount:
$566.48

Component Description:
Legal Service Cost. #465261
Amount:
$235.00

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #107
Amount:
$602.28

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 93 stations.
Amount:
$86.88

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 93 stations.
Amount:
$818.59

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #474405
Amount:
$490.56

Component Description:
Legal services cost. #479356
Amount:
$200.00

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 98 stations. #461759
Amount:
$999.20

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 98 stations. #463026
Amount:
$801.57

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #475744
Amount:
$305.99

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 98 stations.
Amount:
$105.97

Component Description:
Legal services cost. #475827
Amount:
$358.75

Component Description:
Legal services cost. #461755
Amount:
$434.00

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #471524
Amount:
$322.83

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 99 stations. #468718
Amount:
$349.51

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 98 stations.
Amount:
$30.47

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #478780
Amount:
$271.41

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 98 stations. #467378
Amount:
$576.96

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 98 stations. #466690
Amount:
$446.87

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1156
Amount:
$399.52

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 93 stations.
Amount:
$836.44

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1143
Amount:
$436.90

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #473885
Amount:
$318.62

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1090
Amount:
$176.70

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 98 stations. #1072
Amount:
$237.64

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 93 stations.
Amount:
$20.65

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 98 stations.
Amount:
$185.10

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 98 stations. #461759
Amount:
$29.98

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 98 stations. #1063
Amount:
$262.29

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #471524
Amount:
$341.18

Component Description:
Legal services cost. #477378
Amount:
$292.50

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 98 stations. #1078
Amount:
$215.68

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 93 stations.
Amount:
$32.35

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #472583
Amount:
$279.89

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 93 stations. #461289
Amount:
$91.50

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 93 stations.
Amount:
$20.91

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1117
Amount:
$282.68

Component Description:
Legal Service Cost. #467464
Amount:
$182.50

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1105
Amount:
$216.88

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 93 stations.
Amount:
$43.72

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #477305
Amount:
$393.53

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #478288
Amount:
$194.86

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $139,515.58 $138,950.58 N/A $33,187.07 N/A
Total for all systems $2,662,152.18 $2,073,307.22 N/A $898,975.41 N/A
Other Expenses $139,515.58 $138,950.58 $33,187.07
Forklift Rental $1,665.48 $1,665.48 N/A $1,665.48 N/A
MVPD Notification of Channel Change $5,000.00 $5,000.00 See Exhibit J. N/A N/A
Develop and air announcement of upcoming channel change $28,050.00 $28,050.00 See Response to August 14 Inquiry. N/A N/A
Equipment Delivery and Handling Charges $19,154.10 $19,154.10 See Exhibit J. $17,076.62 Invoice #699019 with status Need More Information can be removed. An updated version has been uploaded.
Disposal Costs (for equipment and other waste, net of any salvage value) $28,566.00 $28,566.00 See Response to August 14 Inquiry. $1,694.13 N/A
Equipment Storage $15,000.00 $15,000.00 See Exhibit J. $8,800.84 N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A $2,950.00 N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 N/A N/A N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $190.00 N/A N/A N/A
Non-zoning permits $10,000.00 $10,000.00 See Exhibit J. N/A N/A
Local Zoning $20,000.00 $20,000.00 See Exhibit J. $1,000.00 N/A

Components

Actual Information Description File Name
Forklift Rental

Component Description:
Forklift rental cost. #98475282-0001
Amount:
$1,665.48
MVPD Notification of Channel Change Information not provided.
Develop and air announcement of upcoming channel change Information not provided.
Equipment Delivery and Handling Charges

Component Description:
Equipment delivery and handling reduced by 8.40%. #735024
Amount:
$416.65

Component Description:
Total invoice amount reduced by 8.40%. #699019
Amount:
$2,077.48

Component Description:
Total invoice amount reduced by 8.40%. #699019
Amount:
$2,077.48

Component Description:
Total invoice amount reduced by 8.40%. #726018
Amount:
$733.69

Component Description:
Total invoice amount reduced by 8.40%. #838047
Amount:
$13,848.80

Component Description:
Resubmitted under Equipment Storage. #15654326
Amount:
N/A
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
Disposal related cost. #36426
Amount:
$319.34

Component Description:
Disposal related cost. #37750
Amount:
$281.46

Component Description:
Disposal related cost. #37504
Amount:
$54.12

Component Description:
Disposal related cost. #38370
Amount:
$1,039.21
Equipment Storage

Component Description:
Equipment storage related cost. #14208125
Amount:
$146.15

Component Description:
Equipment storage related cost. #14498951
Amount:
$146.15

Component Description:
Equipment delivery and handling cost. #15079640
Amount:
$146.15

Component Description:
Equipment storage cost. #16522790
Amount:
$162.38

Component Description:
Equipment storage cost. #16231262
Amount:
$162.38

Component Description:
Equipment storage cost. #15940130
Amount:
$162.38

Component Description:
Total invoice amount reduced by 8.40%. #838047
Amount:
$1,071.72

Component Description:
Equipment storage cost. #9500122815
Amount:
$6,495.00

Component Description:
Equipment storage cost. #15654326
Amount:
$162.38

Component Description:
Equipment storage cost. #14786015
Amount:
$146.15
DTV Medical Facility Notification

Component Description:
Medical notifications. #1380
Amount:
$2,950.00
FCC Filing Fees - Form 2100 license to cover application Information not provided.
FCC Filing Fees - Special Temporary Authorization request Information not provided.
Non-zoning permits Information not provided.
Local Zoning

Component Description:
Local zoning. #377991
Amount:
$1,000.00

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $2,662,152.18 $2,073,307.22 $898,975.41

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Lucy Rutishauser

CFO


09/24/2020

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Lucy Rutishauser

CFO


09/24/2020

Attachments

Back to Top