Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
EDUCATIONAL MEDIA FOUNDATION Doing Business As: EDUCATIONAL MEDIA FOUNDATION |
5700 WEST OAKS BOULEVARD ROCKLIN, CA 95765 United States |
+1 (916) 251-1600 | kallison@kloveair1.com | Not-for-Profit |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Interim facility constructed on same tower as main, but lower on the tower to be able to remain on air. This is a temporary facility and will be removed once the Repack work is complete. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Other | |
Other Antenna Type | Rototiller | |
ERP: | 55.0 kW | |
Manufacturer | ||
Model | SHPX | |
Year | 2007 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Cross Dipole | |
ERP: | 2.5 kW | |
Manufacturer | ||
Model | BKG/77 | |
Year | 2019 | |
Justification for New Antenna | This is an interim facility antenna only. Medium power to be able to operate our signal at low power under an STA while REPACK is being performed on tower. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
FM Band Pass Filters | Do you require an FM band pass filter? | No |
Notch Filter | Do you require a Notch filter? | No |
De-Icers | Do you require De-Icers? | No |
Radomes | Do you require Radomes? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Prepare engineering section of Form FCC Construction Permit Application | No |
Prepare engineering section of Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
Prepare and file Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | No | |
Form 399 assistance or other program management costs | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 3 | |
Justification | Tower Crew for installing and removing interim antenna |
Name | Description |
---|---|
Wavepoint Research |
Site Planning and research and analysis of comparable facilities to operate in the interim. |
Sky Tower LLC |
Crew to install temporary interim facility. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No | |
1 pair IP-only Codecs for fiber, internet or IP microwave systems | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,400.00 | $3,520.00 | N/A | $3,520.00 | N/A |
Total for all systems | $20,630.00 | $22,750.00 | N/A | $22,750.00 | N/A |
Primary Antenna BKG/77 | $1,400.00 | $3,520.00 | $3,520.00 | ||
Low Power 1 kW - 2.5 kW Circularly-polarized | $1,400.00 | $3,520.00 | lower power antenna purchased for interim | $3,520.00 | INcluded 3 bay antenna, packaging and shipping costs |
Actual Information Description | File Name |
---|---|
Low Power 1 kW - 2.5 kW Circularly-polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $19,230.00 | $19,230.00 | N/A | $19,230.00 | N/A |
Total for all systems | $20,630.00 | $22,750.00 | N/A | $22,750.00 | N/A |
Outside Professional Services | $19,230.00 | $19,230.00 | $19,230.00 | ||
Additional Field Engineering Service, 3 Days | $8,400.00 | $8,400.00 | Tower crew mobilization to and from site for install and later decommission after REPACK work was over. To install and remove interim antenna and line to operate at low power during repack | $8,400.00 | This was the cost of installation for the coax and 3 bay antenna including Pipe Mount for antenna we did not know was needed until day of installation. I tried adding as a component, but it rejected due to total cost of invoice. |
Sky Tower LLC | $7,830.00 | $7,830.00 | Services for returning to the site to remove antenna after repack work was complete | $7,830.00 | N/A |
Wavepoint Research | $3,000.00 | $3,000.00 | N/A | $3,000.00 | N/A |
Actual Information Description | File Name |
---|---|
Additional Field Engineering Service, 3 Days | |
Sky Tower LLC | |
Wavepoint Research |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $0.00 | $0.00 | N/A | $0.00 | N/A |
Total for all systems | $20,630.00 | $22,750.00 | N/A | $22,750.00 | N/A |
Other Expenses | $0.00 | $0.00 | $0.00 |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $20,630.00 | $22,750.00 | $22,750.00 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Kim Allison Director of Site Development 07/22/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Kim Allison Director of Site Development 07/22/2020 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Kim Allison Director of Site Development 07/22/2020 |