Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
KING KONG BROADCASTING, INC. Doing Business As: KING KONG BROADCASTING, INC. |
452 E. SILVERADO RANCH BLVD. #471 LAS VEGAS, NV 89183 United States |
+1 (702) 642-8847 | HUNTL47@YAHOO.COM | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Tony Zummallen QCommunications, LLC |
Tony Zummallen 705B SE Melody Lane #314 Lee's Summit, MO 64063 United States |
+1 (816) 729-1177 | tony@Qcomm.tv |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Replace the transmitter, antenna and transmission line per the channel relocation project using reasonable and customary engineering and business practices. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | DTXPRO-1.2KU | |
Year | 2009 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1.2 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | DTXPRO-1.2KU | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.2 kW | |
Justification for New Transmitter | Replace the transmitter per the channel relocation project using reasonable and customary engineering and business practices. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | Yes | |
Size | 1 inches | |
Length | 20.0 feet | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Decommission |
Estimated costs to decommission old transmitter |
Shipping |
Estimated Freight |
Taxes |
Estimated sales tax |
Site Prep |
Prepare site for installation |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Middle | |
Polarization | Elliptical | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels | 9 | |
Design power capacity in use | 90.0 % | |
Lower Limit | 470.00 MHz | |
Upper Limit | 860.00 MHz | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | K72314 Series | |
Year | 2008 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Middle | |
Polarization | Elliptical | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 9 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 860.00 MHz | |
Design power capacity in use | 50.0 % | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | K72314 Series | |
Year | 2016 | |
Justification for New Antenna | Replace the antenna per the channel relocation project using reasonable and customary engineering and business practices. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Power Dividers | Does the panel antenna require power dividers? | No |
Cable Harness | Does the panel antenna require cable harness? | No |
Name | Description |
---|---|
Shipping |
Estimated freight |
Taxes |
Estimated freight |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 318 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 162 feet per run | |
Justification for New Transmission Line | Had to move to new tower; could not go off air long enough to move old antenna and replace with new antenna. Required to maintain EAS for Korean, Mexican, and Filipino viewership. Loss of revenue would have been unsustainable for station and programmers | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | Yes |
Name | Description |
---|---|
Taxes |
Estimated sales tax |
Shipping |
Estimated freight |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
Coordinates (NAD83) | Latitude (NAD83) | 35° 56' 43.9" N- |
Longitude (NAD83) | 115° 02' 35.9" W- | |
Overall Structure Height | 100.00 feet | |
Support Structure Height | 100.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 1311.00 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Unknown | |
Date Constructed | 01/01/1990 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | No study needed |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 200 | |
Explanation | Required to assist in the turnkey management of the channel relocation project in order that the existing internal personnel can maintain and operate the stations daily operational requirements and plans. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | Yes | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 5 | |
Justification | Estimated field engineering services during transition activities. Actual costs to be determined. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | Yes |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $137,380.00 | $94,177.06 | N/A | $41,577.06 | N/A |
Total for all systems | $338,664.59 | $238,516.65 | N/A | $48,966.06 | N/A |
Primary Transmitter DTXPRO-1.2KU | $137,380.00 | $94,177.06 | $41,577.06 | ||
Site Prep | $7,000.00 | $7,000.00 | 4/1/2020- Working to obtain quote which may be delayed due to coronavirus pandemic. | N/A | N/A |
Taxes | $8,400.00 | $8,400.00 | Estimated sales tax. Actual costs to be determined. | N/A | N/A |
Shipping | $2,580.00 | $2,580.00 | Per attached Pineapple Distribution invoice #KINGKONG26 dated 10/20/17 | $2,580.00 | Actual invoice submitted. |
Decommission | $6,000.00 | $6,000.00 | Estimated costs to de-install, disconnect and decommission old transmitter. | N/A | N/A |
Transmitter Building Site Survey/Installation | $10,000.00 | $25,000.00 | Estimated costs for site survey and transmitter installation. Revised upon Site Survey. 4/2/2020- Working to obtain quote which may be delayed due to coronavirus pandemic. | N/A | N/A |
1" Rigid Conduit and Wiring | $5,000.00 | $5,000.00 | Estimated costs to replace conduit and wiring. Actual costs to be determined. | N/A | N/A |
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $1,200.00 | N/A | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $38,997.06 | Cost determined per invoice #KINGKONG26 | $38,997.06 | Actual invoices uploaded. |
Actual Information Description | File Name |
---|---|
Site Prep | Information not provided. |
Taxes | Information not provided. |
Shipping | |
Decommission | Information not provided. |
Transmitter Building Site Survey/Installation | Information not provided. |
1" Rigid Conduit and Wiring | Information not provided. |
Service entrance 3 phase/800 amp/208 volt | Information not provided. |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $20,778.75 | $20,778.75 | N/A | $0.00 | N/A |
Total for all systems | $338,664.59 | $238,516.65 | N/A | $48,966.06 | N/A |
Primary Antenna K72314 Series | $20,778.75 | $20,778.75 | $0.00 | ||
Taxes | $2,000.00 | $2,000.00 | Estimated sales tax. Actual costs to be determined. 4/13/2020 - Working to obtain more information which may be delayed due to coronavirus pandemic. | N/A | N/A |
Shipping | $2,000.00 | $2,000.00 | Estimate of shipping fees for new antenna. Actual costs to be determined. 4/13/2020 - Working to obtain more information which may be delayed due to coronavirus pandemic. | N/A | N/A |
UHF-Low Power, Side Mount, Broadband Panel, 9 bay, 15.0kW input, Elliptical | $16,778.75 | $16,778.75 | Per Total Antenna Invoice # TA-120516 dated 12/5/17. 4/13/2020 - Working to obtain more information which may be delayed due to coronavirus pandemic. | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $6,145.84 | $12,655.84 | N/A | $0.00 | N/A |
Total for all systems | $338,664.59 | $238,516.65 | N/A | $48,966.06 | N/A |
Primary Transmission Line | $6,145.84 | $12,655.84 | $0.00 | ||
Shipping | $150.00 | $150.00 | Per attached Wholesale Electric Supply Invoice #: KGNG26 dated 12/21/2017. 4/13/2020 - Working to obtain more information which may be delayed due to coronavirus pandemic. | N/A | N/A |
Taxes | $857.84 | $857.84 | Per Wholesale Electric Supply Invoice # KGNG26 dated 12/21/17 4/13/2020 - Working to obtain more information which may be delayed due to coronavirus pandemic. | N/A | N/A |
Interior RF Systems: Inside RF system including switching, patch panels and dehydrators | $1,250.00 | $1,250.00 | Estimated costs. Actual costs to be determined. 4/2/2020- Working to obtain quote which may be delayed due to coronavirus pandemic. | N/A | N/A |
Flexible Foam Transmission Line - dielectric, 1 5/8" | $3,888.00 | $10,398.00 | Per Invoice #KGNG26 from Wholesale Electric Supply dated 12/21/17. 4/13/2020 - Working to obtain more information which may be delayed due to coronavirus pandemic. | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $56,190.00 | $8,900.00 | N/A | $0.00 | N/A |
Total for all systems | $338,664.59 | $238,516.65 | N/A | $48,966.06 | N/A |
Primary Tower TOWER | $56,190.00 | $8,900.00 | $0.00 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $8,900.00 | Cost determined from JT3 Telecom invoice uploaded on 4.9.20 | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $109,610.00 | $93,445.00 | N/A | $7,389.00 | N/A |
Total for all systems | $338,664.59 | $238,516.65 | N/A | $48,966.06 | N/A |
Outside Professional Services | $109,610.00 | $93,445.00 | $7,389.00 | ||
Form 399 assistance or other Program Management costs | $5,890.00 | $5,890.00 | Per QCommunications proposal QC-KGNG-1 dated 10/30/2019 | $4,889.00 | N/A |
Additional Field Engineering Service, 5 Days | $12,500.00 | $12,500.00 | Estimated field engineering services during transition activities. Actual costs to be determined. | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $52,600.00 | $52,600.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $2,235.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $3,262.50 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | N/A | N/A |
Prepare Form 601 | $755.00 | $0.00 | 4/15/2020- Form 601 not required for this project. | N/A | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | N/A | N/A | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $2,500.00 | Per attached quote from QCommunications #QC-KGNG-1 dated 10/30/2019 | $2,500.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | N/A | N/A |
Project management of the transition | $21,100.00 | $4,900.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Form 399 assistance or other Program Management costs | |
Additional Field Engineering Service, 5 Days | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare Form 601 | Information not provided. |
Perform engineering study for displacement application | Information not provided. |
Prepare/ Review 399 reimbursement form | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Project management of the transition | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $8,560.00 | $8,560.00 | N/A | $0.00 | N/A |
Total for all systems | $338,664.59 | $238,516.65 | N/A | $48,966.06 | N/A |
Other Expenses | $8,560.00 | $8,560.00 | $0.00 | ||
Equipment Delivery and Handling Charges | $1,850.00 | $1,850.00 | Transport, forklift rental and handling fees from staging area to transmitter site. | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $305.00 | $305.00 | 4/2/2020- Working to obtain quote which may be delayed due to coronavirus pandemic. | N/A | N/A |
FCC Filing Fees - Form 2100 Major change CP application | $4,960.00 | $4,960.00 | 4/2/2020- Working to obtain quote which may be delayed due to coronavirus pandemic. | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $338,664.59 | $238,516.65 | $48,966.06 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Larry Hunt CEO 08/04/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Larry Hunt CEO 08/04/2020 |