Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
VICTORY COMMUNICATIONS, INC. Doing Business As: VICTORY COMMUNICATIONS, INC. |
P. O. BOX 177 CENTERTON, AR 72719 United States |
+1 (479) 640-4316 | fam45@centurytel.net | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Applicant was displaced from Ch 48 into the core. Applicant has licensed Ch 28 FI 70105 as K28NT-D. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Retune Existing |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | Superior |
Model | SAU-31 | |
Year | 2012 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1 kW |
Section | Question | Response |
---|---|---|
New Mask Filter | Does the transmitter require a new mask filter? | Yes |
Mask Filter Type | Full Service | |
Power | 500-750W | |
New Exciter | Is a new exciter needed? | Yes |
Exciter Type | Single frequency agile |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 35.0 kW | |
Manufacturer | ||
Model | ACS16E | |
Year | 2003 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 12.5 kW | |
Manufacturer | ||
Model | PSILP12BE-28 | |
Year | 2017 | |
Justification for New Antenna | Channel change from Ch 48 to Ch 28. Ch 48 antenna was cut to frequency and can't be used for Ch 28. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
Coordinates (NAD83) | Latitude (NAD83) | 36° 21' 56.2" N- |
Longitude (NAD83) | 094° 20' 24.7" W- | |
Overall Structure Height | 61.00 feet | |
Support Structure Height | 61.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 418.00 feet | |
Structure Type | BANT - Building with an Antenna | |
Tower Owner | Victory Communications, Inc. | |
Date Constructed | 11/15/1996 |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | No | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
Prepare and file Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | Yes | |
Type | Unlicensed |
Name | Description |
---|---|
B. W. St. Clair |
Engineering Study related to cable head end reception interference issue on Ch 28 |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $34,700.00 | $10,365.84 | N/A | $8,544.52 | N/A |
Total for all systems | $115,353.00 | $36,911.49 | N/A | $35,090.17 | N/A |
Primary Transmitter SAU-31 | $34,700.00 | $10,365.84 | $8,544.52 | ||
Single frequency agile exciter | $21,050.00 | $0.00 | N/A | N/A | N/A |
500-750W w mask filter Full Service | $2,650.00 | $1,821.32 | N/A | $1,821.32 | N/A |
Retune - UHF and VHF - minor re-channel issues | $11,000.00 | $8,544.52 | Transmitter modifications to retune from Ch 48 to Ch 28. | $6,723.20 | N/A |
Actual Information Description | File Name |
---|---|
Single frequency agile exciter | Information not provided. |
500-750W w mask filter Full Service | |
Retune - UHF and VHF - minor re-channel issues |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $13,075.50 | $13,075.50 | N/A | $13,075.50 | N/A |
Total for all systems | $115,353.00 | $36,911.49 | N/A | $35,090.17 | N/A |
Primary Antenna PSILP12BE-28 | $13,075.50 | $13,075.50 | $13,075.50 | ||
UHF-Low Power, Side Mount, Slotted Coaxial, 12.5kW input, Horizontal | $13,075.50 | $13,075.50 | N/A | $13,075.50 | N/A |
Actual Information Description | File Name |
---|---|
UHF-Low Power, Side Mount, Slotted Coaxial, 12.5kW input, Horizontal |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $56,190.00 | $4,200.00 | N/A | $4,200.00 | N/A |
Total for all systems | $115,353.00 | $36,911.49 | N/A | $35,090.17 | N/A |
Primary Tower BANT | $56,190.00 | $4,200.00 | $4,200.00 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $4,200.00 | N/A | $4,200.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Short Tower (less than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $8,122.50 | $4,810.00 | N/A | $4,810.00 | N/A |
Total for all systems | $115,353.00 | $36,911.49 | N/A | $35,090.17 | N/A |
Outside Professional Services | $8,122.50 | $4,810.00 | $4,810.00 | ||
Prepare request for Special Temporary Authorization | $2,560.00 | $250.00 | N/A | $250.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $50.00 | N/A | $50.00 | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | N/A | $1,800.00 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | $1,710.00 | N/A |
Form 399 assistance or other Program Management costs | $1,000.00 | $1,000.00 | Advise necessary documents, review and file form 399 Eligibility Form See B. W. St. Clair Estimate 201990826 | $1,000.00 | N/A |
Actual Information Description | File Name |
---|---|
Prepare request for Special Temporary Authorization | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Perform engineering study for displacement application | |
Prepare/ Review 399 reimbursement form | |
Form 399 assistance or other Program Management costs |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $3,265.00 | $4,460.15 | N/A | $4,460.15 | N/A |
Total for all systems | $115,353.00 | $36,911.49 | N/A | $35,090.17 | N/A |
Other Expenses | $3,265.00 | $4,460.15 | $4,460.15 | ||
B. W. St. Clair | $375.00 | $375.00 | Interference study due to actual incoming interference see Invoice 6152 | $375.00 | N/A |
New Point to Point Microwave System: Unlicensed | $2,250.00 | $3,730.15 | Link required to feed signal to cable head end due to intermittent interference from Full Service Ch 28 | $3,730.15 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $165.00 | N/A | $165.00 | N/A |
FCC Filing Fees - Special Temporary Authorization request | $305.00 | $190.00 | N/A | $190.00 | N/A |
Actual Information Description | File Name |
---|---|
B. W. St. Clair | |
New Point to Point Microwave System: Unlicensed | |
FCC Filing Fees - Form 2100 license to cover application | |
FCC Filing Fees - Special Temporary Authorization request |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $115,353.00 | $36,911.49 | $35,090.17 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Susan Hansen Consultant 07/21/2020 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Bryan Holland President 07/21/2020 |