Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
NEW YORK SPECTRUM HOLDING COMPANY, LLC Doing Business As: NEW YORK SPECTRUM HOLDING COMPANY, LLC |
Michael Do 12020 Sunrise Valley Drive Reston, VA 20191 United States |
+1 (571) 471-8806 | michael.do@nybbsat.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | KVFW has obtained a construction permit for displacement from Channel 38 to Channel 7 and entered into an interference acceptance agreement with 3 other broadcasters in order to facilitate transition required as a result of the TV Repack |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | UTX5K | |
Year | 2005 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 5 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | LPTV-5000-1000v3 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1 kW | |
Justification for New Transmitter | New transmitter is required because of change from Channel 38 to Channel 7 - old transmitter could not be retuned from UHF to VHF |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Proof of Performance |
Installation and Proof of Performance of new transmitter |
Sales Tax on Purchase |
Sales Tax on Purchase |
Shipping Cost |
Shipping and Handling to Site |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | ACB16CR | |
Year | 2005 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 3.0 kW | |
Manufacturer | ||
Model | BCH4WRS-7 | |
Year | 2020 | |
Justification for New Antenna | Required for change in channels from 38 to Channel 7 |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Shipping Cost |
Shipping Cost of Antenna to Transmitter Site |
Sales Tax on Purchase |
Sales Tax for Antenna |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Air | |
Diameter | 3 inches | |
Number of parallel runs | 1 | |
Length | 1000 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Air | |
Diameter | 3 inches | |
Number of parallel runs | 1 | |
Length | 980 feet per run | |
Justification for New Transmission Line | Old transmission line is deteriorated beyond repair and new TX line needed between new transmitter and new antenna | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | No |
Name | Description |
---|---|
Shipping Cost |
Shipping Cost |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
Internal Project Mgmt |
Additional time for internal staff to handle displacement issues from Channel 38 to Channel 7 not part of customary duties |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $57,256.21 | $65,256.21 | N/A | $92,194.63 | N/A |
Total for all systems | $265,526.21 | $273,526.21 | N/A | $181,276.63 | N/A |
Primary Transmitter LPTV-5000-1000v3 | $57,256.21 | $65,256.21 | $92,194.63 | ||
Proof of Performance | $10,900.00 | $10,900.00 | N/A | $10,900.00 | N/A |
Transmitter Building Site Survey/Installation | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
High VHF - Air Cooled Solid State Transmitter 400 - 1000 Watts | $30,000.00 | $38,000.00 | Based on actual quote from Comark for new 1000 watt transmitter | $74,938.42 | Installment Payment Invoices as supporting documentation for previously provided quote for new transmitter. |
Shipping Cost | $2,145.00 | $2,145.00 | N/A | $2,145.00 | N/A |
Sales Tax on Purchase | $4,211.21 | $4,211.21 | N/A | $4,211.21 | N/A |
Actual Information Description | File Name |
---|---|
Proof of Performance | |
Transmitter Building Site Survey/Installation | Information not provided. |
High VHF - Air Cooled Solid State Transmitter 400 - 1000 Watts | |
Shipping Cost | |
Sales Tax on Purchase |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $39,190.00 | $39,190.00 | N/A | $28,835.00 | N/A |
Total for all systems | $265,526.21 | $273,526.21 | N/A | $181,276.63 | N/A |
Primary Antenna BCH4WRS-7 | $39,190.00 | $39,190.00 | $28,835.00 | ||
Sales Tax on Purchase | $4,310.00 | $4,310.00 | N/A | $4,310.00 | N/A |
Shipping Cost | $2,525.00 | $2,525.00 | N/A | $2,525.00 | N/A |
Side Mount antenna brackets | $4,625.00 | $4,625.00 | N/A | N/A | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $5,730.00 | N/A | N/A | N/A |
High VHF-Low Power, Side Mount, Slotted Coaxial, 3.0kW input, Horizontal | $22,000.00 | $22,000.00 | N/A | $22,000.00 | N/A |
Actual Information Description | File Name |
---|---|
Sales Tax on Purchase | |
Shipping Cost | |
Side Mount antenna brackets | Information not provided. |
Sweep test of transmission line and antenna | Information not provided. |
High VHF-Low Power, Side Mount, Slotted Coaxial, 3.0kW input, Horizontal |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $60,345.00 | $60,345.00 | N/A | $30,240.00 | N/A |
Total for all systems | $265,526.21 | $273,526.21 | N/A | $181,276.63 | N/A |
Primary Transmission Line | $60,345.00 | $60,345.00 | $30,240.00 | ||
Shipping Cost | $2,525.00 | $2,525.00 | N/A | N/A | N/A |
Flexible Air Transmission Line - dielectric, 3" | $57,820.00 | $57,820.00 | N/A | $30,240.00 | N/A |
Actual Information Description | File Name |
---|---|
Shipping Cost | Information not provided. |
Flexible Air Transmission Line - dielectric, 3" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $0.00 | $0.00 | N/A | $0.00 | N/A |
Total for all systems | $265,526.21 | $273,526.21 | N/A | $181,276.63 | N/A |
Primary Tower GTOWER | $0.00 | $0.00 | $0.00 |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $81,465.00 | $81,465.00 | N/A | $9,487.00 | N/A |
Total for all systems | $265,526.21 | $273,526.21 | N/A | $181,276.63 | N/A |
Outside Professional Services | $81,465.00 | $81,465.00 | $9,487.00 | ||
RF Exposure Measurements | $12,100.00 | $12,100.00 | N/A | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $52,600.00 | $52,600.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $2,235.00 | N/A | $932.00 | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | N/A | $5,005.00 | Based on actual cost for displacement search, interference studies, additional interference study to resolve MX issue arising from repack and confirming solution that was integrated into interference agreement between KVFW and other stations. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | $950.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | $0.00 | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $3,262.50 | N/A | $2,600.00 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
RF Exposure Measurements | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Perform engineering study for displacement application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare/ Review 399 reimbursement form | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $27,270.00 | $27,270.00 | N/A | $20,520.00 | N/A |
Total for all systems | $265,526.21 | $273,526.21 | N/A | $181,276.63 | N/A |
Other Expenses | $27,270.00 | $27,270.00 | $20,520.00 | ||
Internal Project Mgmt | $20,520.00 | $20,520.00 | N/A | $20,520.00 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $305.00 | $305.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Internal Project Mgmt | |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $265,526.21 | $273,526.21 | $181,276.63 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | MICHAEL DO CHIEF OPERATING OFFICER 07/15/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | MICHAEL DO CHIEF OPERATING OFFICER 07/15/2020 |