Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
TOWNSQUARE MEDIA PORTLAND LICENSE, LLC Doing Business As: TOWNSQUARE MEDIA PORTLAND LICENSE, LLC |
1 MANHATTANVILLE ROAD SUITE 202 PURCHASE, NY 10577 United States |
+1 (203) 861-0900 | hliberman@wbklaw.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | To accommodate tower work for repack station WGME, WBLM was required to shut down its licensed main facility during daylight hours for several weeks in the spring and summer of 2019. The WBLM aux transmitter required replacement to meet the demand. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | 20H3 | |
Year | 1970 | |
Type | Other Type | |
Other Transmitter Type | Tube | |
Power Capacity | 20 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | FAX20K | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Model Type | Analog | |
Solid State Power capacity | 20 kW | |
Justification for New Transmitter | Existing aux transmitter unable to perform as needed and no longer supported by manufacturer. Replaced with current, equivalent model. | |
Does the transmitter require the purchase of a new HD Importer? | No | |
Does the transmitter require the purchase of a new HD Exporter? | No |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | Does the transmitter installation require an Additional Exciter? | No |
Does the transmitter installation require any additional transmitter installation costs? | No | |
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Other Transmitter-Related Expenses | Does the replacement transmitter require a Remote Control? | No |
Does the replacement transmitter require an RDS Encoder? | No | |
Does the replacement transmitter require Audio Processing? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Prepare engineering section of Form FCC Construction Permit Application | No |
Prepare engineering section of Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
Prepare and file Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 6 | |
Justification | Installation and commissioning of new transmitter. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No | |
1 pair IP-only Codecs for fiber, internet or IP microwave systems | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $94,700.00 | $94,700.00 | N/A | $0.00 | N/A |
Total for all systems | $101,753.00 | $101,753.00 | N/A | $7,683.00 | N/A |
Primary Transmitter FAX20K | $94,700.00 | $94,700.00 | $0.00 | ||
Air Cooled Solid State FM Transmitter 15 - 20 kW Analog Analog | $94,700.00 | $94,700.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Air Cooled Solid State FM Transmitter 15 - 20 kW Analog Analog |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $5,803.00 | $5,803.00 | N/A | $2,383.00 | N/A |
Total for all systems | $101,753.00 | $101,753.00 | N/A | $7,683.00 | N/A |
Outside Professional Services | $5,803.00 | $5,803.00 | $2,383.00 | ||
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | $0.00 | N/A |
Additional Field Engineering Service, 6 Days | $2,383.00 | $2,383.00 | N/A | $2,383.00 | N/A |
Form 399 assistance or other Program Management costs | $1,710.00 | $1,710.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Prepare/ Review 399 reimbursement form | Information not provided. |
Additional Field Engineering Service, 6 Days | |
Form 399 assistance or other Program Management costs | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,250.00 | $1,250.00 | N/A | $5,300.00 | N/A |
Total for all systems | $101,753.00 | $101,753.00 | N/A | $7,683.00 | N/A |
Other Expenses | $1,250.00 | $1,250.00 | $5,300.00 | ||
Equipment Delivery and Handling Charges | $1,250.00 | $1,250.00 | N/A | $5,300.00 | The actual freight cost was incorrectly categorized originally. It had been factored into the transmitter cost. That component cost has now been adjusted to $0 and the invoice has been resubmitted to the Equipment Delivery and Handling Charges category. |
Actual Information Description | File Name |
---|---|
Equipment Delivery and Handling Charges |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $101,753.00 | $101,753.00 | $7,683.00 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Martin Stabbert Vice President of Engineering 07/14/2020 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Martin Stabbert Vice President of Engineering 07/14/2020 |