(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
6837
Service:
DCA
Call Sign:
WJYL-CD
Channel:
29 (UHF)
File Number:
0000025705
FRN:
0032881088
Date Submitted:
07/30/2020

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

WJYL, LLC

Doing Business As: WJYL, LLC

John W. Smith Jr.

5555 Arnie Loop

Lakewood Ranch, FL 34211

United States

+1 (502) 693-3146 jwschampion@mac.com Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Greg Best

Consulting Engineer

Greg Best Consulting, Inc.

Greg Best

16100 Outlook Avenue

Stilwell, KS 66085

United States

+1 (816) 792-2913 gbconsulting54@gmail.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan See attached transition plan document. Tower owner will not make modifications to meet upgraded standard. Station must relocate to new tower. Nor can agreeable lease terms for tower owner and tenant be met.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Auxiliary Transmitter

Back to Top

Add Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use Backup
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model SC500UB
Year 2005
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 1.2 kW

Auxiliary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Auxiliary (Backup)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model UAXTE-2
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 1.2 kW
Justification for New Transmitter This transmitter replaces an existing backup transmitter. Existing backup transmitter supplier is no longer in business.

Auxiliary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 150 kVA
Rigid Conduit and Wiring Yes
Size 2 inches
Length 50.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Auxiliary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model SC500UB
Year 2005
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 1.2 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model UAXTE-2
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 1.2 kW
Justification for New Transmitter Existing Screen Service transmitter manufacturer no longer in business.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 150 kVA
Rigid Conduit and Wiring Yes
Size 2 inches
Length 50.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

RF SYSTEM COMBINER

RF system to combine with WMYO-CD.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? No

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Utilize Existing
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer andrew
Type Flexible Foam
Diameter 1 5/8 inches
Other Diameter N/A
Segment Length N/A
Other Segment Length N/A
Number of parallel runs 1
Length 350 feet per run

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Transmission line, antenna sweep.

Sweep of existing transmission line, antenna to determine potential for future use.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Move Equipment
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1052448
Coordinates (NAD83) Latitude (NAD83) 38° 22' 10.1" N-
Longitude (NAD83) 085° 49' 45.5" W-
Overall Structure Height 517.71 feet
Support Structure Height 517.71 feet
Ground Elevation Above Mean Sea Level (AMSL) 989.82 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner P & B TOWERS, LLC
Date Constructed 04/01/2002

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
6838 WWJS-CD DTV

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Tower Structure Analysis

Structure Analysis for new tower.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 350
Explanation Supervision of Transmitter installation, RF system installation, commissioning, and coordination of electrical contractor, and other normal site-related expenses.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Information not provided.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? No
Does this relocation require MVPD Notification of a Channel Change? No

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $438,320.00 $336,223.00 N/A $219,498.74 N/A
Total for all systems $761,010.00 $468,393.00 N/A $298,894.59 N/A
Primary Transmitter UAXTE-2 $247,270.00 $213,320.00 $167,529.60
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW $126,000.00 $87,250.00 The main-alternate transmission system uses a single mask filter and switches either transmitter to the mask filter. This figure is the transmitter cost including one half the mask filter cost. $105,989.60 Original estimate did not include tax and freight.
Switchgear - industrial 800 amp $38,200.00 $36,300.00 N/A $10,147.00 N/A
Transformer 3 phase/480v - 150 KVA $25,550.00 $25,550.00 N/A $6,214.00 N/A
2" Rigid Conduit and Wiring (Cost per foot) $1,300.00 $8,000.00 Change in location of transmitters and breaker panel required more parts and labor. $7,699.00 N/A
RF SYSTEM COMBINER $56,220.00 $56,220.00 The total combiner cost is split between WJYL-CD & WMYO-CD. This figure is 50% of the total cost. See quote Q-83086. $37,480.00 N/A
Auxiliary Transmitter UAXTE-2 $191,050.00 $122,903.00 $51,969.14
2" Rigid Conduit and Wiring (Cost per foot) $1,300.00 $1,300.00 N/A N/A N/A
Transformer 3 phase/480v - 150 KVA $25,550.00 $25,550.00 N/A N/A N/A
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW $126,000.00 $57,853.00 The main-alternate transmission system uses a single mask filter and switches either transmitter to the mask filter. This figure is the transmitter cost including one half the mask filter cost. $51,969.14 N/A
Switchgear - industrial 800 amp $38,200.00 $38,200.00 N/A N/A N/A

Components

Actual Information Description File Name
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW

Component Description:
Final invoice amount due for main transmitter.
Amount:
$54,788.84

Component Description:
This invoice is not valid. Please reject.
Amount:
N/A

Component Description:
WJYL-CD main transmitter second invoice for 1/3 of amount of invoice exclusive of RF combiner.
Amount:
$25,600.38

Component Description:
WJYL-CD main transmitter first invoice for 1/3 of amount of invoice exclusive of RF combiner.
Amount:
$25,600.38

Component Description:
Freight amount for delivery of transmitter.
Amount:
$1,110.54

Component Description:
Sales tax associated with transmitter.
Amount:
$8,849.91
Switchgear - industrial 800 amp

Component Description:
AC Panels and switchgear for transmitter.
Amount:
$10,147.00
Transformer 3 phase/480v - 150 KVA

Component Description:
Stepdown transformer for transmitter.
Amount:
$6,214.00
2" Rigid Conduit and Wiring (Cost per foot)

Component Description:
Wire, conduit, and labor for transmitter connection to breaker panel.
Amount:
$7,699.00
RF SYSTEM COMBINER

Component Description:
WJYL-CD RF Combiner second invoice for 1/3 of amount of RF combiner portion of invoice ($56220).
Amount:
$18,740.00

Component Description:
final invoice amount for RF combiner.
Amount:
$18,740.00

Component Description:
WJYL-CD RF Combiner first invoice for 1/3 of amount of RF combiner portion of invoice ($56220).
Amount:
$18,740.00
2" Rigid Conduit and Wiring (Cost per foot) Information not provided.
Transformer 3 phase/480v - 150 KVA Information not provided.
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW

Component Description:
WJYL-CD backup transmitter first invoice for 1/3 of total amount of invoice.
Amount:
$15,998.23

Component Description:
Final invoice amount for alternate transmitter.
Amount:
$19,972.68

Component Description:
Freight costs associated with transmitter.
Amount:
$1,110.54

Component Description:
This invoice is not valid. Please reject this invoice.
Amount:
N/A

Component Description:
Sales tax associated with alternate transmitter.
Amount:
$2,863.90

Component Description:
WJYL-CD backup transmitter second invoice for 1/3 of total amount of invoice.
Amount:
$15,998.23
Switchgear - industrial 800 amp Information not provided.

Cost Information

Back to Top

Antennas

Information not provided.

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $5,000.00 $5,000.00 N/A $0.00 N/A
Total for all systems $761,010.00 $468,393.00 N/A $298,894.59 N/A
Primary Transmission Line $5,000.00 $5,000.00 $0.00
Transmission line, antenna sweep. $5,000.00 $5,000.00 N/A $0.00 N/A

Components

Actual Information Description File Name
Transmission line, antenna sweep.

Component Description:
Engineering service for sweep of existing transmission line for potential use.
Amount:
$4,500.00

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $213,100.00 $22,600.00 N/A $19,650.00 N/A
Total for all systems $761,010.00 $468,393.00 N/A $298,894.59 N/A
Primary Tower TOWER $213,100.00 $22,600.00 $19,650.00
Tower Structure Analysis $2,600.00 $2,600.00 Final site structural analysis required. $2,600.00 N/A
Tall Tower (greater than 500') $210,500.00 $20,000.00 The proposed facility transmitter output will feed an existing transmission line and antenna. The only expected tower costs are for the removal of the existing transmitter, antenna, and transmission line at the existing facility location. $17,050.00 N/A

Components

Actual Information Description File Name
Tower Structure Analysis

Component Description:
Old Wave Tower Structure Analysis for WJYL-CD Change to channel 29 repack
Amount:
$1,400.00

Component Description:
Structural analysis for new WAVE Tower.
Amount:
$1,200.00
Tall Tower (greater than 500')

Component Description:
Services to remove transmission equipment from previous leased site per lease agreement.
Amount:
$17,050.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $86,010.00 $91,540.00 N/A $55,619.85 N/A
Total for all systems $761,010.00 $468,393.00 N/A $298,894.59 N/A
Outside Professional Services $86,010.00 $91,540.00 $55,619.85
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,680.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A $1,122.00 N/A
Prepare request for Special Temporary Authorization $2,050.00 $2,050.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $3,937.50 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $14,000.00 New transmission system design is required due inability to use existing site. $10,237.50 New transmission system engineering service costs required system redesign for new location.
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,560.00 N/A N/A N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A $1,775.00 N/A
Project management of the transition $55,300.00 $55,000.00 Project Management to coordinate vendors, schedules, and other resources. Manage transition and coordination with other linked stations. $38,547.85 N/A

Components

Actual Information Description File Name
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
HARDY CAREY CHAUTIN BALKIN LLP LEGAL FEES REVISED 3/23/18. SHOWING HOURLY RATE, TOTAL AND FACILITY ID NUMBER. ORIGINAL FORM PREPARATIONS AND CP
Amount:
$1,122.00

Component Description:
WJYL CD itemized legal fees invoice. Showing hours and rate per FCC request.
Amount:
$1,122.00

Component Description:
Legal services for filing repack application for WJYL-CD and review of original form 399.
Amount:
$1,122.00

Component Description:
Engineering activities for construction permit.
Amount:
$875.00
Prepare request for Special Temporary Authorization Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Preparation of form 399 and preparation of original CP application.
Amount:
$1,750.00

Component Description:
Preparation of initial CP with associated exhibits.
Amount:
$875.00

Component Description:
Engineering services for repack for WJYL-CD application CP and original form 399.
Amount:
$1,312.50

Component Description:
Revised Engineering invoice for all initial preparation of CP and Form 399 for WJYL CD per FCC request.
Amount:
$1,750.00
Perform engineering study for new channel assignment and antenna development

Component Description:
Engineering Repack Services
Amount:
$1,225.00

Component Description:
Engineering services to investigate changes to WJYL transmission system for WAVE site location, request transmission system component quotes, and recalculate TPO.
Amount:
$3,237.50

Component Description:
Engineering service to determine transmission system TPO including RF combiner and request new transmission system quotes.
Amount:
$1,750.00

Component Description:
Determine electrical and transmitter requirements, modify drawings, prepare CP mod application, and write justification letter for transmission system move.
Amount:
$3,150.00

Component Description:
Review system design, transmitter and antenna quotes.
Amount:
$437.50

Component Description:
Engineering Repack Services
Amount:
$437.50
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Prepare and or review reimbursement form

Component Description:
Preparation of 399 form for submittal.
Amount:
$875.00

Component Description:
Preparation of 399 form exhibits.
Amount:
$900.00
Project management of the transition

Component Description:
Project Management
Amount:
$4,359.45

Component Description:
Project management services.
Amount:
$2,275.00

Component Description:
Project Management activities for DTV progress reports and LTC.
Amount:
$1,237.50

Component Description:
Project Management
Amount:
$3,241.10

Component Description:
Project Management
Amount:
$3,451.55

Component Description:
Project Management
Amount:
$2,827.85

Component Description:
Project Management services provided by David Smith.
Amount:
$18,360.00

Component Description:
Project management services.
Amount:
$8,242.50

Component Description:
Project Management
Amount:
$2,120.40

Component Description:
Project management activities to coordinate tasks.
Amount:
$675.00

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $18,580.00 $13,030.00 N/A $4,126.00 N/A
Total for all systems $761,010.00 $468,393.00 N/A $298,894.59 N/A
Other Expenses $18,580.00 $13,030.00 $4,126.00
Equipment Storage $2,500.00 $2,500.00 N/A N/A N/A
Equipment Delivery and Handling Charges $2,000.00 $2,000.00 N/A N/A N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $1,500.00 $1,500.00 N/A N/A N/A
Non-zoning permits $500.00 $500.00 N/A N/A N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $195.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $335.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $6,000.00 N/A $4,126.00 N/A

Components

Actual Information Description File Name
Equipment Storage Information not provided.
Equipment Delivery and Handling Charges Information not provided.
Disposal Costs (for equipment and other waste, net of any salvage value) Information not provided.
Non-zoning permits Information not provided.
FCC Filing Fees - Special Temporary Authorization request Information not provided.
FCC Filing Fees - Form 2100 license to cover application Information not provided.
DTV Medical Facility Notification

Component Description:
Medical notifications for WJYL-CD.
Amount:
$4,126.00

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $761,010.00 $468,393.00 $298,894.59

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. Yes
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

DAVID BRYAN SMITH , SR .

REPACK GENERAL MANAGER


07/30/2020

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

DAVID BRYAN SMITH , SR .

REPACK GENERAL MANAGER


07/30/2020

Certification

Back to Top
Section Question Response
Submission of Final Allocation or Accounting Information Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  2. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  3. The above-named entity certifies that all costs identified as "actual costs" herein accurately represent the costs actually paid by the above-named entity, including any discounts, refunds, or rebates.

  4. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  5. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  6. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

DAVID BRYAN SMITH , SR .

REPACK GENERAL MANAGER


07/30/2020