Facility ID:
62388
Service:
DTV
Call Sign:
WGCU
Channel:
22 (UHF)
File Number:
0000027926
FRN:
0001735646
Date Submitted:
07/23/2020

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

The Florida Gulf Coast University Board of Trustees

Doing Business As: WGCU

RICK JOHNSON

10501 FGCU BLVD. SOUTH

FORT MYERS, FL 33965

United States

+1 (239) 590-7072 RJOHNSON@FGCU.EDU Government Entity

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

The Preparer is same as the reimbursement contact.

 

 

 

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan An interim facility will be constructed for channel 22, and we will cut over to this on the March 2020 deadline for WGCU. Then the Channel 31 antenna will be replaced with the new main Channel 22 antenna.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Add Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Retune Existing
Use Primary (Main)
Ownership Owned
Owner N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer Gates Air
Model ULX-12300
Year 2012
Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 16 kW

Primary Transmitter

Back to Top

Retuning Transmitter Costs

Section Question Response
New IOT Tubes Number of Tubes (including accessories) needed N/A
New Mask Filter
Power 30 kW
Other Power N/A
New Exciter Is a new exciter needed? No

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Interim Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Interim
Description of Use N/A
Change Type Purchase
Manufacturer
Model ULXTE-40
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 40 kW
Justification for New Transmitter WGCU does not have a backup transmitter, and retuning would require off-air time. Transmitter requested is an upgrade for a maximized facility. WGCU will pay the difference between the existing equivalent ULXTE-24 transmitter and the proposed upgrade.

Interim Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) Yes
Power 150 kVA
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A
Inside RF System Is an additional interior RF system required to support this interim transmitter? No

Interim Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 294.0 kW
Manufacturer
Model TFU-32JSC-B
Year 2012

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 750.0 kW
Manufacturer
Model TFU-24DSC V/P-R 3BP260
Year 2020
Justification for New Antenna Existing antenna will not function on new channel and cannot be retuned. This antenna is for a maximized facility.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna?
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Custom Mounts

Mounts for equivalent Dielectric TFU 32JSC-B antenna

Elbow complex

Equivalent elbow complex for Dielectric TFU 32JSC-B antenna

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 244.0 kW
Manufacturer
Model TFU-8WB-1-R S230
Year 2017
Justification for New Antenna Antenna is a broadband antenna that will allow us to either use on channel 31 or on 22 while we install the new main antenna.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? No

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Add Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmission currently shared with any other stations? No
Is Transmission Line in operating condition? No
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 14
Length 1060 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1060 feet per run
Justification for New Transmission Line Upgraded facility requires upgraded transmission line.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Flexible Foam
Diameter Other inches 3 1/8 inches
Segment Length N/A
Other Segment Length
Number of parallel runs 0
Length 650 feet per run
Justification for New Transmission Line This is required to feed new interim antenna to maintain service and avoid interruption during rebuild of new facility.

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? No
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1020483
Coordinates (NAD83) Latitude (NAD83) 26° 48' 55.0" N-
Longitude (NAD83) 081° 45' 42.0" W-
Overall Structure Height 935.03 feet
Support Structure Height 931.09 feet
Ground Elevation Above Mean Sea Level (AMSL) 29.86 feet
Structure Type GTOWER - Guyed Structure Used for Communication Purposes
Tower Owner FLORIDA GULF COAST UNIVERSITY
Date Constructed 10/01/1982

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
69042 WGCU-FM FM

Other Types of Users

Users
DEA Communicati

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Serious Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Rigging Interim System

Installation of interim antenna and associated transmission line.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 353
Explanation WGCU does not have sufficient resource capacity and expertise in house to handle all activities necessary for completion of the station's build by the construction deadline. WGCU will hire an outside firm to facilitate a timely transition.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers No
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Information not provided.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application No
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? No
Does this relocation require Equipment Storage? No
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,636,350.00 $1,574,800.00 N/A $0.00 N/A
Total for all systems $3,731,407.03 $3,595,428.03 N/A $323,779.78 N/A
Interim Transmitter ULXTE-40 $1,498,550.00 $1,458,900.00 $0.00
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW $1,473,000.00 $1,434,000.00 N/A $0.00 N/A
Transformer 3 phase/480v - 150 KVA $25,550.00 $24,900.00 N/A N/A N/A
Primary Transmitter ULX-12300 $137,800.00 $115,900.00 $0.00
30 kW mask filter $32,600.00 $13,500.00 N/A N/A N/A
UHF and VHF - minor banding issues $105,200.00 $102,400.00 N/A N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $437,292.30 $431,172.30 N/A $259,932.30 N/A
Total for all systems $3,731,407.03 $3,595,428.03 N/A $323,779.78 N/A
Interim Antenna TFU-8WB-1-R S230 $189,500.00 $180,000.00 $47,920.00
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized $189,500.00 $180,000.00 N/A $47,920.00 N/A
Primary Antenna TFU-24DSC V/P-R 3BP260 $247,792.30 $251,172.30 $212,012.30
Elbow complex $9,163.00 $9,163.00 N/A $9,163.00 N/A
Custom Mounts $24,650.00 $24,650.00 N/A $24,650.00 N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $23,200.00 Actual cost but not seeking reimbursement because it is not equivalent antenna $0.00 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $6,400.00 N/A
UHF - High Power, Side Mount, basic slot antenna, 750 kW input, directional,, elliptically or circularly polarized $171,799.30 $171,799.30 Dielectric Quote CLE 021 Rev A plus Freight and Shipping $171,799.30 N/A
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) $12,300.00 $15,960.00 Estimated cost but not seeking reimbursement because it is for upgraded antenna N/A N/A

Components

Actual Information Description File Name
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized

Component Description:
Interim TV antenna TFU-WB8 S230
Amount:
$47,920.00
Elbow complex

Component Description:
Elbow Complex
Amount:
$9,163.00
Custom Mounts

Component Description:
Custom Mount
Amount:
$24,650.00
Side mount brackets for high power antennas (if not included in antenna base cost) Information not provided.
Sweep test of existing antenna

Component Description:
Sweep Test
Amount:
$6,400.00
UHF - High Power, Side Mount, basic slot antenna, 750 kW input, directional,, elliptically or circularly polarized

Component Description:
Antenna
Amount:
$171,799.30
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) Information not provided.

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $261,260.73 $255,960.73 N/A $43,915.48 N/A
Total for all systems $3,731,407.03 $3,595,428.03 N/A $323,779.78 N/A
Interim Transmission Line $47,140.73 $47,140.73 $43,915.48
Flexible Foam Transmission Line - 3 1/8" 0 parallel runs 650 feet $47,140.73 $47,140.73 Uploaded file "Dielectric Quote CLE 268 RevA WGCU-AUX.pdf" Per quote, 650 feet of transmission line & mounting hardware (lines 2 through 22) total $47,140.73 $43,915.48 Includes 650 feet of transmission line plus jumper connectors and reducers not included in original estimate, as well as mounting hardware for tower. Uploaded file "Dielectric Quote CLE 268 RevA WGCU-AUX.pdf" which is the quote invoice is based upon
Primary Transmission Line $214,120.00 $208,820.00 $0.00
Rigid Transmission Line - copper, 6 1/8" $214,120.00 $208,820.00 N/A $0.00 N/A

Components

Actual Information Description File Name
Flexible Foam Transmission Line - 3 1/8" 0 parallel runs 650 feet

Component Description:
transmission line & mounting hardware actual costs
Amount:
$43,022.98

Component Description:
Interim Transmission Line
Amount:
$892.50
Rigid Transmission Line - copper, 6 1/8"

Component Description:
Invoice moved to the correct budget category
Amount:
N/A

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,275,100.00 $1,212,000.00 N/A $9,500.00 N/A
Total for all systems $3,731,407.03 $3,595,428.03 N/A $323,779.78 N/A
Primary Tower GTOWER $1,275,100.00 $1,212,000.00 $9,500.00
Structural engineering tower load study for well documented tower $12,600.00 $12,000.00 N/A $9,500.00 Please see FDH Velocitel Structural Analysis quote in the saved attachments for further detail and information on the work performed on these invoices.
Serious tower reinforcement/modifications $1,052,000.00 $1,000,000.00 N/A $0.00 N/A
Tall Tower (greater than 500') $210,500.00 $200,000.00 N/A $0.00 N/A
Rigging Interim System $0.00 $0.00 N/A $0.00 N/A

Components

Actual Information Description File Name
Structural engineering tower load study for well documented tower

Component Description:
Additional information (quote) to support invoices attached.
Amount:
N/A

Component Description:
Tower Structural analysis
Amount:
$4,750.00

Component Description:
Tower Structural analysis
Amount:
$4,750.00
Serious tower reinforcement/modifications Information not provided.
Tall Tower (greater than 500') Information not provided.
Rigging Interim System Information not provided.

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $83,854.00 $84,495.00 N/A $2,676.00 N/A
Total for all systems $3,731,407.03 $3,595,428.03 N/A $323,779.78 N/A
Outside Professional Services $83,854.00 $84,495.00 $2,676.00
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A $676.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $0.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $1,500.00 N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A $500.00 N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A $0.00 N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,500.00 N/A $0.00 N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A $0.00 N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A $0.00 N/A
Project management of the transition $55,774.00 $58,245.00 Please see Widelity Strategic Support Quote N/A N/A

Components

Actual Information Description File Name
Attorney Fees - Prepare and File request for Special Temporary Authorization

Component Description:
FCC legal assistance
Amount:
$45.50

Component Description:
FCC legal assistance
Amount:
$318.50

Component Description:
FCC legal assistance
Amount:
$312.00
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application Information not provided.
Perform engineering study for new channel assignment and antenna development

Component Description:
Remove Invoice 2406300 from FCC reimbursement.
Amount:
N/A

Component Description:
Engineering study for new channel assignment. Revised invoice to include hours and facility ID.
Amount:
$1,500.00
Prepare and or review reimbursement form

Component Description:
Assistance with FCC form 399. Revised invoice with hours and Facility ID.
Amount:
$500.00
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
Prepare request for Special Temporary Authorization

Component Description:
FCC legal assistance
Amount:
$702.00

Component Description:
FCC legal assistance
Amount:
$234.00
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Project management of the transition Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $37,550.00 $37,000.00 N/A $7,756.00 N/A
Total for all systems $3,731,407.03 $3,595,428.03 N/A $323,779.78 N/A
Other Expenses $37,550.00 $37,000.00 $7,756.00
MVPD Notification of Channel Change $12,000.00 $12,000.00 N/A $2,758.00 N/A
Develop and air announcement of upcoming channel change $6,000.00 $6,000.00 N/A N/A N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $8,000.00 $8,000.00 N/A $0.00 N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A $4,998.00 N/A

Components

Actual Information Description File Name
MVPD Notification of Channel Change

Component Description:
Notification of Cable & satellite providers of new RF channel and transport stream parameters on repack channel - uploaded PO & estimate for this invoice
Amount:
$2,758.00

Component Description:
N/A
Amount:
N/A
Develop and air announcement of upcoming channel change Information not provided.
Disposal Costs (for equipment and other waste, net of any salvage value) Information not provided.
DTV Medical Facility Notification

Component Description:
Medical Facility Notification and PO/Estimate uploaded as well
Amount:
$4,998.00

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $3,731,407.03 $3,595,428.03 $323,779.78

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Tachung Yih , Ph.D. .

Associate Vice President for Research


07/23/2020

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Tachung Yih , Ph.D. .

Associate Vice President for Research


07/23/2020

Attachments