Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
WSOC TELEVISION, LLC Doing Business As: WSOC TELEVISION, LLC |
Director of Engineering/Operations 235 West 23rd Street CHARLOTTE, NC 28206 United States |
+1 (704) 335-4732 | ted.hand@cmg.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Replace antenna and transmitter. Transmission line will remain the same |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 14.0 kW | |
Manufacturer | ||
Model | ALP-HSW-42 | |
Year | 2009 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | ALP12L5-HSNR-26 | |
Year | 2019 | |
Justification for New Antenna | Old antenna was a slotted antenna and could not be retuned to new channel |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Name | Description |
---|---|
New Mask Filter |
New mask filter needed for channel 26 |
Freight |
Freight for antenna and mask filter |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Ownership | ||
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | ||
Is tower documented for structural analysis? | ||
Is tower compliant with Rev G? | ||
Existing Tower Structure Registration | Do you have a tower registration number? | |
Coordinates (NAD83) | Latitude (NAD83) | - - |
Longitude (NAD83) | - - | |
Overall Structure Height | ||
Support Structure Height | ||
Ground Elevation Above Mean Sea Level (AMSL) | ||
Structure Type | - | |
Tower Owner | ||
Date Constructed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Install of new antenna |
Removal of old antenna and install of new antenna |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 10 | |
Explanation | Crown Castle charged for services for there tower | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | No |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
Prepare and file Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | No | |
Form 399 assistance or other program management costs | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 1 | |
Justification | Sweep and retune / proof transmitter |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $28,120.69 | $28,120.69 | N/A | $28,120.69 | N/A |
Total for all systems | $39,689.69 | $55,372.69 | N/A | $53,731.43 | N/A |
Primary Antenna ALP12L5-HSNR-26 | $28,120.69 | $28,120.69 | $28,120.69 | ||
Freight | $901.69 | $901.69 | Freight | $901.69 | N/A |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Horizontal | $21,709.00 | $21,709.00 | new antenna tuned to channel 26 | $21,709.00 | N/A |
New Mask Filter | $5,510.00 | $5,510.00 | New mask filter for channel 26 | $5,510.00 | N/A |
Actual Information Description | File Name |
---|---|
Freight | |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Horizontal | |
New Mask Filter |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $3,500.00 | $3,500.00 | N/A | $3,500.00 | N/A |
Total for all systems | $39,689.69 | $55,372.69 | N/A | $53,731.43 | N/A |
Primary Tower | $3,500.00 | $3,500.00 | $3,500.00 | ||
Install of new antenna | $3,500.00 | $3,500.00 | Based on actually invoice | $3,500.00 | N/A |
Actual Information Description | File Name |
---|---|
Install of new antenna |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $6,316.00 | $22,114.00 | N/A | $22,110.74 | N/A |
Total for all systems | $39,689.69 | $55,372.69 | N/A | $53,731.43 | N/A |
Outside Professional Services | $6,316.00 | $22,114.00 | $22,110.74 | ||
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $22,111.00 | Based on actually invoices | $22,110.74 | N/A |
Additional Field Engineering Service, 1 Days | $1.00 | $1.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1.00 | N/A | N/A | N/A |
Project management of the transition | $1,580.00 | $1.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Additional Field Engineering Service, 1 Days | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Project management of the transition | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,753.00 | $1,638.00 | N/A | $0.00 | N/A |
Total for all systems | $39,689.69 | $55,372.69 | N/A | $53,731.43 | N/A |
Other Expenses | $1,753.00 | $1,638.00 | $0.00 | ||
MVPD Notification of Channel Change | $1.00 | $1.00 | N/A | N/A | N/A |
Develop and air announcement of upcoming channel change | $1.00 | $1.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $1.00 | $1.00 | N/A | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $305.00 | $300.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $310.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,025.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $39,689.69 | $55,372.69 | $53,731.43 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Ted Hand Director of Engineering/Operations 06/29/2020 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Ted Hand Director of Engineering /Operations 06/29/2020 |