Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
WFMJ TELEVISION, INC. Doing Business As: WFMJ TELEVISION, INC. |
Jack Grdic 101 WEST BOARDMAN STREET YOUNGSTOWN, OH 44503 United States |
+1 (330) 744-8611 | JAGRDIC@WFMJ.COM | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | WFMJ is transitioning from channel 20 to channel 33. The existing Axcera transmitter is not retunable or supported and will be replaced along with the main antenna. An interim antenna will be used during replacement of the main antenna to stay on air. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | Backup | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | HP50DDW | |
Year | 2003 | |
Type | Inductive Output Tube | |
IOT Power Type | Single | |
Power Capacity | 25 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Auxiliary (Backup) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | Parallax U15 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 24.3 kW | |
Justification for New Transmitter | UBS Axcera will not support retuning existing transmitter. AXCERA Legacy Supported Models 27-Mar-2017-Final.pdf attached. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | HP50DDW | |
Year | 2003 | |
Type | Inductive Output Tube | |
IOT Power Type | Single | |
Power Capacity | 25 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | Parallax U15 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 24.3 kW | |
Justification for New Transmitter | UBS Axcera will not support retuning existing transmitter.AXCERA Legacy Supported Models 27-Mar-2017-Final.pdf attached. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Wiring trays, grounding, fused disconnects, circuit breakers, various conduits, wire and supplies | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Inside RF Components |
Inside transmission components to connect transmitter, switches, and filter to the antenna. |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 460.0 kW | |
Manufacturer | ||
Model | TFU-27ETT-R 4C150 SP DC | |
Year | 2006 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 740.0 kW | |
Manufacturer | ||
Model | TFU-31ETT/VP-R O6 | |
Year | 2019 | |
Justification for New Antenna | Current channel 20/21 antenna is not able to be retuned. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 8 3/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Sweep test of new antenna |
Testing and tuning of new CH 33 antenna |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 612.0 kW | |
Manufacturer | ||
Model | TFU-16WB C160 | |
Year | 2018 | |
Justification for New Antenna | Interim antenna while replacing primary antenna to stay on air |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | B | |
Feed Line Size | 6 1/8 inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Sweep Test of new antenna |
Checkout and proof of new side mount antenna |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1015316 | |
Coordinates (NAD83) | Latitude (NAD83) | 41° 04' 48.6" N- |
Longitude (NAD83) | 080° 38' 24.4" W- | |
Overall Structure Height | 1020.98 feet | |
Support Structure Height | 957.99 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 1033.12 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | WFMJ TELEVISION INC DBA - WFMJ | |
Date Constructed | 12/03/2013 |
Facility ID | Call Sign | Service |
---|---|---|
173428 | WILB-FM | FM |
Users |
---|
NOAA |
YNGSTN POLICE |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Rigging Review |
In accordance with the ANSI/ASSE A10.48-2016 & TIA 322 standards, any tower project where tower members are replaced or a lift of over 2,000 pounds is made, a rigging plan reviewed by a professional engineer is required. |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 80 | |
Explanation | Engineering services to plan, file applications, and guide WFMJ through the transition and installation assistance due to lack of qualified staff. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Legal Fees C.P. Extension |
Attorney fees for filing Construction Permit Extension |
Rechannel Aux Transmitter |
Rechannel AUX-INTErIM transmitter to new channel |
Engineering for C.P. Extension |
Engineering costs involved to extend the main construction permit due to tower crew delays. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Equipment Rental |
Equipment and machinery rented |
Filing Fee AUX construction permit |
Filing fee for AUX-INTERIM construction permit |
Legal Fees Transition Progress Reports |
Includes review of legal requirements, consultation with station personnel and engineering consultants, and review of reports drafted primarily by station personnel. |
Other Legal |
Other legal fees for consultation not listed in Outside Professional Services |
Driveway Repair |
Repairs to driveway from forklift damage |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,939,550.76 | $1,624,775.76 | N/A | $1,624,774.52 | N/A |
Total for all systems | $2,852,249.96 | $2,592,148.36 | N/A | $2,563,602.49 | N/A |
Primary Transmitter Parallax U15 | $992,550.76 | $921,794.76 | $921,793.67 | ||
Inside RF Components | $16,835.76 | $16,835.76 | Transmission line components with hangers and flanges to connect transmitter, switches, and filter to antenna. Includes shipping/handling and Ohio-Mahoning county 7.25% tax. See "WFMJ_QT1697381R1 AS ORDERED.pdf" | $16,835.74 | N/A |
Other Electrical Service: Wiring trays, grounding, fused disconnects, circuit breakers, various conduits, wire and supplies | $28,715.00 | $28,715.00 | See "WFMJ Electrical Quote 1 REVISED.pdf" and "Valley Electric cover invoice quote FINISH.pdf". | $28,714.68 | Budget adjusted due to revised estimates. |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW | $947,000.00 | $876,244.00 | Includes all equipment, shipping, handling, and Mahoning County Ohio sales & use tax SEE "P2947R6 WFMJ MAIN Proposal - signed 8058.pdf" the as ordered proposal | $876,243.25 | 25 cent difference due to sales tax computation. When budgeting, dollar amounts were rounded up at 50 cents and rounded down at 49 cents. |
Auxiliary Transmitter Parallax U15 | $947,000.00 | $702,981.00 | $702,980.85 | ||
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW | $947,000.00 | $702,981.00 | Includes all equipment, shipping, offloading, and Mahoning County Ohio sales tax SEE "P3515 WFMJ AUX Proposal - signed 8059.pdf" the signed and as ordered proposal | $702,980.85 | N/A |
Actual Information Description | File Name |
---|---|
Inside RF Components | |
Other Electrical Service: Wiring trays, grounding, fused disconnects, circuit breakers, various conduits, wire and supplies | |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW | |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $496,678.00 | $432,146.13 | N/A | $430,734.84 | N/A |
Total for all systems | $2,852,249.96 | $2,592,148.36 | N/A | $2,563,602.49 | N/A |
Interim Antenna TFU-16WB C160 | $178,334.00 | $161,811.00 | $160,973.79 | ||
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $0.00 | N/A | N/A | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $12,000.00 | Includes shipping and Mahoning County Ohio sales and use tax | $11,583.00 | N/A |
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | $13,700.00 | $20,317.00 | Includes special cut piece, matching transformer, and Mahoning County Ohio sales & use tax. See attached quote Interim Antenna Quote.pdf | $20,317.44 | $0.44 higher due to rounding. |
UHF - High Power, Side Mount, basic slot antenna, 612 kW input, directional,, elliptically or circularly polarized | $122,630.00 | $122,630.00 | Includes test transition, shipping, and Mahoning County Ohio sales & use tax. See Interim Antenna Quote.pdf | $122,209.35 | N/A |
Sweep Test of new antenna | $6,864.00 | $6,864.00 | Estimate is greater than predetermined cause due to the addition of Ohio-Mahoning County sales and use tax of 7.25% | $6,864.00 | N/A |
Sweep test of existing antenna | $6,730.00 | $0.00 | N/A | N/A | N/A |
Primary Antenna TFU-31ETT/VP-R O6 | $318,344.00 | $270,335.13 | $269,761.05 | ||
Sweep test of new antenna | $6,864.00 | $6,864.00 | Estimate is higher than predetermined cost due to adding Ohio-Mahoning County sales and use tax at 7.25%. See "700134CMZ-3A - signed WFMJ.pdf" | $6,864.00 | Sub total equals Estimated Cost but I couldn't exit page unless I put something here. |
Elbow complex, single channel, at antenna input, per 8 3/16. feedline (if needed) | $15,250.00 | $15,655.38 | Includes 8" to 6" reducer, special cut piece and Mahoning County Ohio sales & use tax. See "700134CMZ-3A - signed WFMJ.pdf" Cut piece not needed and removed. | $15,655.38 | N/A |
Sweep test of existing antenna | $6,730.00 | $3,338.75 | This was actually to sweep test my existing line for compatibility on the repack channel 33, not the antenna. This was paid on invoice WFMJ170327. | $3,338.75 | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | $289,500.00 | $244,477.00 | Includes shipping, test transition and Mahoning County Ohio sales & use tax with V-Pol upgrade removed. See "700134CMZ-3A - signed WFMJ.pdf". | $243,902.92 | N/A |
Actual Information Description | File Name |
---|---|
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | Information not provided. |
Side mount brackets for high power antennas (if not included in antenna base cost) | |
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | |
UHF - High Power, Side Mount, basic slot antenna, 612 kW input, directional,, elliptically or circularly polarized | |
Sweep Test of new antenna | |
Sweep test of existing antenna | Information not provided. |
Sweep test of new antenna | |
Elbow complex, single channel, at antenna input, per 8 3/16. feedline (if needed) | |
Sweep test of existing antenna | |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $230,075.00 | $344,540.00 | N/A | $343,060.68 | N/A |
Total for all systems | $2,852,249.96 | $2,592,148.36 | N/A | $2,563,602.49 | N/A |
Primary Tower GTOWER | $230,075.00 | $344,540.00 | $343,060.68 | ||
Rigging Review | $6,975.00 | $6,975.00 | ANSI/ASSE A10.48-2016 & TIA 322 standards state any tower project where a lift of over 2,000 pounds is made, a rigging plan reviewed by a professional engineer is required for the main antenna only. See Rigging Review.pdf. Includes sales tax | $6,500.00 | N/A |
Structural engineering tower load study for well documented tower | $12,600.00 | $12,000.00 | N/A | $11,000.00 | N/A |
Tall Tower (greater than 500') | $210,500.00 | $325,565.00 | Includes Primary and Interim antennas, plumb & tension, and Mahoning County Ohio 7.25% sales and use tax, REVISED. New proposal for main antenna installation. See "18837-6 WFMJ Main Antenna Proposal - signed .pdf" Added weather days and freight. | $325,560.68 | $19,453.08 was added for weather days and freight. Sales & use tax were also added |
Actual Information Description | File Name |
---|---|
Rigging Review | |
Structural engineering tower load study for well documented tower | |
Tall Tower (greater than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $113,821.00 | $122,646.27 | N/A | $103,827.97 | N/A |
Total for all systems | $2,852,249.96 | $2,592,148.36 | N/A | $2,563,602.49 | N/A |
Outside Professional Services | $113,821.00 | $122,646.27 | $103,827.97 | ||
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | $2,107.50 | N/A |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | $4,210.00 | $2,000.00 | N/A | $1,725.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $872.00 | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $2,500.00 | See "WFMJ-engineering budgetary revision.pdf" item 3 | $2,212.50 | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | $1,580.00 | $3,206.25 | Aux license to cover for pre-transition and post transition. See"WFMJ-engineering budgetary revision.pdf" and adjusted to match final invoice | $3,206.25 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $2,000.00 | See "WFMJ-engineering budgetary revision.pdf" item 5 | $1,923.75 | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | $2,105.00 | $6,000.00 | Side mount antenna is used as pre-transition aux system, interim STA post transition, and licensed aux when construction is complete. See "WFMJ-engineering budgetary revision.pdf" | $4,942.50 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $4,000.00 | See "WFMJ-engineering budgetary revision.pdf" item 2 | $2,527.50 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $6,532.50 | See "Invoice # 897-01-0003 with cover.PDF". |
Prepare and or review reimbursement form | $2,630.00 | $7,984.02 | Legal expenses for Form 399 review were more than anticipated due to initial Request for Information from fund administrator. See "Justification for Estimated Cost overage 399 review.pdf". Additional costs to revise estimates that were 2 years old. | $7,984.02 | Legal expenses for Form 399 review were more than anticipated due to initial Request for Information from fund administrator. See "Justification for Estimated Cost overage 399 review.pdf" |
Engineering for C.P. Extension | $2,500.00 | $2,500.00 | N/A | $2,310.00 | N/A |
Rechannel Aux Transmitter | $0.00 | $0.00 | Won't be invoiced | N/A | N/A |
Legal Fees C.P. Extension | $690.00 | $690.00 | Attorney fees to file Construction permit Extension due to no crew available to install main antenna before the phase deadline | $690.00 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $3,500.00 | N/A | $966.00 | N/A |
Project management of the transition | $12,640.00 | $12,000.00 | N/A | $3,812.45 | N/A |
Main/Aux TX Installation | $62,016.00 | $62,016.00 | ***System Notice: Estimate adjusted and locked because line has been superseded.***Transmitter installation to be done by Murlatt and Associates instead of Comark. See quote "REVISED Transmitter Installation Estimate with cover - WFMJ.pdf", "WFMJ additional transmitter installation estimate.pdf" and "WFMJ Quote for RF Completion.pdf". | $62,016.00 | N/A |
Actual Information Description | File Name |
---|---|
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Prepare and or review reimbursement form | |
Engineering for C.P. Extension | |
Rechannel Aux Transmitter | Information not provided. |
Legal Fees C.P. Extension | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Project management of the transition | |
Main/Aux TX Installation |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $72,125.20 | $68,040.20 | N/A | $61,204.48 | N/A |
Total for all systems | $2,852,249.96 | $2,592,148.36 | N/A | $2,563,602.49 | N/A |
Other Expenses | $72,125.20 | $68,040.20 | $61,204.48 | ||
Driveway Repair | $2,425.00 | $2,425.00 | Repairs to asphalt driveway from forklift damage | $2,425.00 | N/A |
Other Legal | $0.00 | $0.00 | Includes other legal fees for consultation not listed in Outside Professional Services. See Legal Fees.pdf ORIGINAL $5000 NOT ALLOWED BY FUND ADMINISTRATOR. | $0.00 | N/A |
Legal Fees Transition Progress Reports | $5,000.00 | $5,000.00 | Includes review of legal requirements, consultation with station personnel and engineering consultants, and review of reports drafted primarily by station personnel. See Legal Fees.pdf | $272.50 | N/A |
Filing Fee AUX construction permit | $2,220.00 | $2,220.00 | Aux construction permits for pre-transition channel AND post transition channel. | $2,220.00 | N/A |
Equipment Rental | $2,758.47 | $2,758.47 | Forklift, pallet jack, and scissors lift to move equipment and reach the RF system in a building with a 40 foot roof. See quote Equipment Rental Quote.pdf and Invoice WFMJ Leppo RO-225888.pdf. More installation trips needed than anticipated. | $2,758.47 | Due to equipment delays and missing or broken pieces, there were more installation trips necessary requiring more scissor lift rentals than anticipated. |
MVPD Notification of Channel Change | $3,805.00 | $3,805.00 | Revised costs for legal fees in developing and sending the MVPD notices. Estimate is updated in "8267828 cover invoice quote MVPD.pdf" | $3,805.00 | N/A |
Develop and air announcement of upcoming channel change | $500.00 | $500.00 | AIRTIME CHARGES NOT ALLOWED. AMOUNT REDUCED TO PRODUCTION COSTS ONLY. | N/A | N/A |
Equipment Storage | $7,950.00 | $7,950.00 | 19 weeks of main antenna storage at Dielectric if tower crew is not available at time of antenna shipment. Price is $390 per week and 7.25% Ohio-Mahoning County sales tax is included. Actual charges see "666018 cover quote invoice FINAL.pdf" | $7,947.23 | N/A |
Equipment Delivery and Handling Charges | $16,809.00 | $16,809.00 | Offloading and placing main and aux transmitters, heat exchangers, pumps, Offloading and storing on site of CH 33 interim antenna and CH 33 filter and RF section. See "Delivery and handling budget adjust.pdf" | $15,703.55 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $18,077.73 | $18,077.73 | Removal of existing transmitter, 2 IOT, 2 beam supplies, and used glycol. Attached Beam Supply Removal Quote-807628.pdf, 10647 WFMJ Axcera Removal 062727.pdf, Glycol Disposal.pdf. Includes Mahoning County Ohio sales & use tax. | $18,077.73 | Original estimate did not include disposal of two high powered antennas. |
Local Zoning | $500.00 | $500.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $1,005.00 | Adjusted to meet the updated predetermined costs for 2019 and is quantity (3) for Aux pre transition, Aux post transition, and Main antenna applications. | $1,005.00 | N/A |
DTV Medical Facility Notification | $11,550.00 | $6,790.00 | N/A | $6,790.00 | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $200.00 | Reflects actual filing fee as shown on the application | $200.00 | N/A |
Actual Information Description | File Name |
---|---|
Driveway Repair | |
Other Legal | Information not provided. |
Legal Fees Transition Progress Reports | |
Filing Fee AUX construction permit | |
Equipment Rental | |
MVPD Notification of Channel Change | |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Storage | |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
Local Zoning | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | |
DTV Medical Facility Notification | |
FCC Filing Fees - Special Temporary Authorization request |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $2,852,249.96 | $2,592,148.36 | $2,563,602.49 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Robert J Flis Chief Engineer 06/29/2020 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Robert J Flis Chief Engineer 06/29/2020 |