Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
24514
Service:
DTV
Call Sign:
KTFD-TV
Channel:
28 (UHF)
File Number:
0000058233
FRN:
0001529627
Date Submitted:
07/15/2020

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

ENTRAVISION HOLDINGS, LLC

Jeffery A. Liberman

5700 Wilshire Blvd.

Los Angeles, CA 90036

United States

+1 (323) 900-6393 jliberman@entravision.com Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Samuel Hariton

Widelity

4031 University Dr

Suite 100

Fairfax, VA 22030

United States

+1 (339) 222-8107 sam.hariton@widelity.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan The plan is for KTFD is to replace the existing channel 26 system with a new channel 28 antenna, new 4-1/16 line and retune existing transmitters. KTFD will need to use an interim antenna and line on an interim tower white replacing the primary antenna.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Add Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Retune Existing
Use Primary (Main)
Ownership Owned
Owner N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer Gates Air
Model ULXT-40AT
Year 2014
Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 19.5 kW

Primary Transmitter

Back to Top

Retuning Transmitter Costs

Section Question Response
New IOT Tubes Number of Tubes (including accessories) needed N/A
New Mask Filter
Power Other
Other Power 25 kW
New Exciter Is a new exciter needed? No

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Retune Existing
Use Primary (Main)
Ownership Owned
Owner N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer Gates Air
Model ULXT-40AT
Year 2014
Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 19.5 kW

Primary Transmitter

Back to Top

Retuning Transmitter Costs

Section Question Response
New IOT Tubes Number of Tubes (including accessories) needed N/A
New Mask Filter
Power Other
Other Power 25 kW
New Exciter Is a new exciter needed? No

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 549.0 kW
Manufacturer
Model ATW25H5-HSC1-26H
Year 2014

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 400.0 kW
Manufacturer
Model TFU-29JSC/VP-R C150
Year 2018
Justification for New Antenna A new antenna is necessary because the existing antenna cannot be retuned to the new channel and is not capable of broadcasting on channel 28.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 55.4 kW
Manufacturer
Model TLP-8M/VP-R
Year 2018
Justification for New Antenna Interim antenna needed to stay on-air while main-antenna is changed out. Interim antenna will be mounted on a different, interim, tower.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 1
Length 240 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 4 1/16 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 240 feet per run
Justification for New Transmission Line New transmission line is necessary because the new channel requires transmission line segments of a different length.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Flexible Air
Diameter 1 5/8 inches
Segment Length N/A
Other Segment Length
Number of parallel runs 1
Length 250 feet per run
Justification for New Transmission Line Interim transmission line is necessary to allow the first retuned transmitter to power the interim antenna. Interim transmission linewill be mounted on a different, interim, tower.

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? No
Is tower compliant with Rev G? Yes
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1044149
Coordinates (NAD83) Latitude (NAD83) 39° 43' 58.0" N-
Longitude (NAD83) 105° 14' 10.0" W-
Overall Structure Height 450.13 feet
Support Structure Height 450.13 feet
Ground Elevation Above Mean Sea Level (AMSL) 7278.78 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner KWGN, LLC
Date Constructed 01/01/1971

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
59601 KALC FM
29739 KWBL FM

Other Types of Users

Users
Two-Way paging

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for undocumented/poorly documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Serious Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Structural Analysis

Structural Analysis completed after tower mapping

Auxiliary Tower

Back to Top

Add Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Auxiliary (Backup)
Description of Use Interim
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? No
One or more FM, AM or TV radio broadcaster(s) N/A
Others Types of Users N/A
Is tower documented for structural analysis? No
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1044150
Coordinates (NAD83) Latitude (NAD83) 39° 43' 57.9" N-
Longitude (NAD83) 105° 14' 08.9" W-
Overall Structure Height 197.83 feet
Support Structure Height 197.83 feet
Ground Elevation Above Mean Sea Level (AMSL) 7266.97 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner KWGN Inc., Debtor-In-Possession
Date Constructed 01/01/1952


Auxiliary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for undocumented/poorly documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Auxiliary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Auxiliary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Remove Batwing antenna

KTFD will need to remove the existing Batwing antenna from the tower.

Structural Analysis

Structural Analysis completed after tower mapping

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 712
Explanation KTFD does not have sufficient resource capacity and expertise in house to handle all of the reimbursement filing by the Construction Deadline of April 12, 2019. KTFD will hire an outside firm to ensure a timely and well managed transition.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review Yes
Environmental Assessment Yes
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements Yes
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Attorney Channel 28

Attorney Fees associated with Securing access to Channel 28

Engineering Channel 28

Engineering Fees associated with Securing access to Channel 28

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning Yes
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $283,070.72 $107,194.32 N/A $57,470.90 N/A
Total for all systems $2,564,871.72 $2,943,740.80 N/A $676,950.41 N/A
Primary Transmitter ULXT-40AT $148,452.96 $60,514.76 $50,720.90
Other 25 kW mask filter $43,252.96 $43,252.96 Estimated Cost Justification KTFD-110-1st Primary Transmitter, 25 kW Mask Filter v0 $41,210.90 N/A
UHF and VHF - minor banding issues $105,200.00 $17,261.80 N/A $9,510.00 N/A
Primary Transmitter ULXT-40AT $134,617.76 $46,679.56 $6,750.00
Other 25 kW mask filter $29,417.76 $29,417.76 N/A $0.00 N/A
UHF and VHF - minor banding issues $105,200.00 $17,261.80 N/A $6,750.00 N/A

Components

Actual Information Description File Name
Other 25 kW mask filter

Component Description:
Mask Filter, Line Kit
Amount:
$41,210.90

Component Description:
For preliminary work to change filters at KTFD in Denver.
Amount:
$2,042.05
UHF and VHF - minor banding issues

Component Description:
Engineering Field Services by Chuck Britt & Associates, Inc to do retune on KTFD system changing from channel 26 to channel 28
Amount:
$6,750.00

Component Description:
KTFD-110-1st Primary Transmitter - Retune Existing Transmitter, Minor Banding Issues (Fabricate Tuning Section/Network Analyzer)
Amount:
$2,760.00
Other 25 kW mask filter

Component Description:
KTFD-120-2nd Primary Transmitter, 25 kW Mask Filter
Amount:
$2,042.05
UHF and VHF - minor banding issues

Component Description:
KTFD-120-2nd Primary Transmitter - Retune Existing Transmitter, Minor Banding Issues
Amount:
$6,750.00

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $389,860.00 $267,247.75 N/A $203,443.70 N/A
Total for all systems $2,564,871.72 $2,943,740.80 N/A $676,950.41 N/A
Interim Antenna TLP-8M/VP-R $132,980.00 $35,076.24 $22,821.97
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $4,053.57 per Estimated Cost Justification KTFD-110-1st Primary Transmitter, 25 kW Mask Filter v0 see also KTFD-280-Interim Antenna - Side Mount Brackets for High Power Antenna Budget Increase Justification v0 $3,883.27 N/A
UHF - Lower Power Side Mount, One Station antenna . medium power (50-200 kW), elliptically or circularly polarized $103,100.00 $21,022.67 Please see attached Dielectric quote 513422JKT Rev2, see Justifying Invoice Dielectric 321012 shipping $17,138.70 N/A
Sweep test of existing antenna $6,730.00 $10,000.00 See attached Chuck Britt Quote $1,800.00 N/A
Primary Antenna TFU-29JSC/VP-R C150 $256,880.00 $232,171.51 $180,621.73
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $27,364.51 see Estimated Cost Justification KTFD-210-Primary Antenna - Side Mount Brackets for High Power Antenna v0 $25,245.59 N/A
Sweep test of existing antenna $6,730.00 $10,000.00 See attached Chuck Britt Quote N/A N/A
UHF - Lower Power Side Mount, One station antenna -- 200-500 kW, elliptically or circularly polarized $227,000.00 $194,807.00 N/A $155,376.14 N/A

Components

Actual Information Description File Name
Side mount brackets for high power antennas (if not included in antenna base cost)

Component Description:
KTFD-280-Interim Antenna - Side Mount Brackets for High Power Antenna
Amount:
$2,350.57

Component Description:
KTFD-280-Interim Antenna - Side Mount Brackets for High Power Antenna
Amount:
$766.35

Component Description:
KTFD-280-Interim Antenna - Side Mount Brackets for High Power Antenna
Amount:
$1,703.00

Component Description:
KTFD-280-Interim Antenna - Side Mount Brackets for High Power Antenna
Amount:
$766.35
UHF - Lower Power Side Mount, One Station antenna . medium power (50-200 kW), elliptically or circularly polarized

Component Description:
UHF Low-Medium Power Side Mount, VPOL Components, Flexible transmission line, Standard mounts for antenna, Freight, etc.
Amount:
$21,022.67

Component Description:
UHF - Low - Medium Power Side Mount
Amount:
$8,569.35

Component Description:
UHF - Low - Medium Power Side Mount
Amount:
$8,569.35
Sweep test of existing antenna

Component Description:
KTFD-280-Interim Antenna - Sweep Test
Amount:
$1,800.00
Side mount brackets for high power antennas (if not included in antenna base cost)

Component Description:
KTFD-210-Primary Antenna - Side Mount Brackets for High Power Antenna
Amount:
$14.76

Component Description:
KTFD-210-Primary Antenna - Side Mount Brackets for High Power Antenna
Amount:
$41.32

Component Description:
KTFD-210-Primary Antenna - Side Mount Brackets for High Power Antenna
Amount:
$9,787.50

Component Description:
Remove and replace existing antenna, Additional charge for tuning filter, fabricate 4 cut pieces, network analyzer and antenna mounting brackets
Amount:
$5,614.51

Component Description:
Side Mount
Amount:
$9,787.50
Sweep test of existing antenna Information not provided.
UHF - Lower Power Side Mount, One station antenna -- 200-500 kW, elliptically or circularly polarized

Component Description:
Freight, shipping, and handling
Amount:
$370.11

Component Description:
ANTENNA - UHF SIDE MOUNT
Amount:
$77,436.90

Component Description:
Freight, shipping, and handling
Amount:
$132.23

Component Description:
Antenna- UHF Side Mount
Amount:
$77,436.90

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $42,330.00 $54,741.73 N/A $48,940.48 N/A
Total for all systems $2,564,871.72 $2,943,740.80 N/A $676,950.41 N/A
Interim Transmission Line $8,250.00 $7,463.50 $5,053.86
Flexible Air Transmission Line - dielectric, 1 5/8" $8,250.00 $7,463.50 See Justifying Invoice Dielectric 321012 shipping $5,053.86 N/A
Primary Transmission Line $34,080.00 $47,278.23 $43,886.62
Rigid Transmission Line - copper, 4 1/16" $34,080.00 $47,278.23 see Estimated Cost Justification KTFD-310-Primary Transmission Line v0 $43,886.62 N/A

Components

Actual Information Description File Name
Flexible Air Transmission Line - dielectric, 1 5/8"

Component Description:
KTFD-380-Interim Transmission Line
Amount:
$2,526.93

Component Description:
KTFD-380-Interim Transmission Line
Amount:
$2,526.93

Component Description:
KTFD-380-Interim Transmission Line
Amount:
$7,463.50
Rigid Transmission Line - copper, 4 1/16"

Component Description:
FREIGHT, SHIPPING, AND HANDLING LINE 33, UPS 2nd DAY AIR
Amount:
$274.10

Component Description:
Reducer; Other - freight, shipping, and handling
Amount:
$1,155.62

Component Description:
ELBOW 4-50 DIGIT 7 X 14 "QS
Amount:
$1,358.00

Component Description:
KTFD-310-Primary Transmission Line
Amount:
$66.14

Component Description:
KTFD-310-Primary Transmission Line
Amount:
$15,666.21

Component Description:
CONN STD ANCHOR 4-50 "QS; ELBOW 4-50 EIA 6.00 X 12.00 CU REI; FREIGHT, SHIPPING, AND HANDLING
Amount:
$1,527.74

Component Description:
KTFD-310-Primary Transmission Line
Amount:
$23.63

Component Description:
KTFD-310-Primary Transmission Line
Amount:
$7,856.47

Component Description:
New Transmission Line
Amount:
$15,666.21

Component Description:
CONN STD ANCHOR 4-50 "QS
Amount:
$292.50

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,523,985.00 $2,199,242.00 N/A $220,730.16 N/A
Total for all systems $2,564,871.72 $2,943,740.80 N/A $676,950.41 N/A
Auxiliary Tower TOWER $349,485.00 $335,985.00 $19,500.00
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study $26,300.00 $25,000.00 N/A N/A N/A
Minor tower reinforcement/modifications $158,000.00 $150,000.00 N/A N/A N/A
Short Tower (less than 500') $84,200.00 $80,000.00 N/A N/A N/A
Structural Analysis $12,000.00 $12,000.00 N/A N/A N/A
Remove Batwing antenna $68,985.00 $68,985.00 N/A $19,500.00 N/A
Primary Tower TOWER $1,174,500.00 $1,863,257.00 $201,230.16
Structural Analysis $12,000.00 $12,000.00 N/A $346.90 N/A
Serious tower reinforcement/modifications $1,052,000.00 $1,635,500.00 See attached proposal from H.C. Jeffries N/A N/A
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study $26,300.00 $25,000.00 N/A $10,126.26 N/A
Short Tower (less than 500') $84,200.00 $190,757.00 Estimated Cost Justification KTFD-410-Existing Primary Tower - Short Tower - Tower Rigging and Equipment v0 $190,757.00 N/A

Components

Actual Information Description File Name
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study Information not provided.
Minor tower reinforcement/modifications Information not provided.
Short Tower (less than 500') Information not provided.
Structural Analysis Information not provided.
Remove Batwing antenna

Component Description:
Returned to the site and removed the interim antenna and line.
Amount:
$19,500.00
Structural Analysis

Component Description:
Structural Analysis, Existing Primary Tower
Amount:
$346.90
Serious tower reinforcement/modifications Information not provided.
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study

Component Description:
Tower Mapping, Existing Primary Tower
Amount:
$10,126.26
Short Tower (less than 500')

Component Description:
Installation of Interim Antenna.
Amount:
$39,857.00

Component Description:
KTFD-410-Existing Primary Tower - Short Tower - Tower Rigging and Equipment
Amount:
$150,900.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $215,296.00 $205,550.00 N/A $129,415.65 N/A
Total for all systems $2,564,871.72 $2,943,740.80 N/A $676,950.41 N/A
Outside Professional Services $215,296.00 $205,550.00 $129,415.65
Engineering Channel 28 $15,000.00 $15,000.00 N/A $13,250.00 N/A
RF Exposure Measurements $21,050.00 $20,000.00 N/A $8,500.00 N/A
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet $10,520.00 $10,000.00 N/A N/A N/A
NEPA Section 106 environmental review, if needed $6,310.00 $6,000.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A N/A N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $4,000.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A $250.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $0.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $6,562.50 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A N/A N/A
Project management of the transition $112,496.00 $106,800.00 N/A $100,853.15 N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A N/A N/A
Attorney Channel 28 $15,000.00 $15,000.00 N/A N/A N/A

Components

Actual Information Description File Name
Engineering Channel 28

Component Description:
Prepare the technical portion of From 2100 to change from channel 14 to channel 28
Amount:
$5,000.00

Component Description:
Prepare the technical portion of From 2100 to change from channel 14 to channel 28
Amount:
$1,125.00

Component Description:
Study co-location with KTFD-DT as suggested by FCC
Amount:
$1,875.00

Component Description:
Prepare the technical portion of From 2100 to change from channel 14 to channel 28
Amount:
$2,000.00

Component Description:
Prepare the technical portion of From 2100 to change from channel 14 to channel 28
Amount:
$3,250.00
RF Exposure Measurements

Component Description:
Engineering Field Services by Chuck Britt & Associates, Inc
Amount:
$8,500.00
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet Information not provided.
NEPA Section 106 environmental review, if needed Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees - Negotiation of lease and other matters for shared locations Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Prepare request for Special Temporary Authorization Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application

Component Description:
License application
Amount:
$250.00
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application Information not provided.
Perform engineering study for new channel assignment and antenna development

Component Description:
Engineering Study for New Channel Assignment
Amount:
$4,125.00

Component Description:
Engineering Study for New Channel Assignment
Amount:
$1,375.00

Component Description:
Engineering Study for New Channel Assignment
Amount:
$1,062.50
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Prepare and or review reimbursement form Information not provided.
Project management of the transition

Component Description:
Project Management
Amount:
$148.20

Component Description:
Project Management
Amount:
$971.95

Component Description:
Project Management
Amount:
$4,664.45

Component Description:
Project Management
Amount:
$2,068.70

Component Description:
Project Management
Amount:
$2,330.45

Component Description:
Project Management
Amount:
$4,250.45

Component Description:
Project Management
Amount:
$3,864.00

Component Description:
Project Management
Amount:
$2,425.15

Component Description:
Project Management
Amount:
$3,081.25

Component Description:
Project Management
Amount:
$4,280.40

Component Description:
Project Management
Amount:
$2,064.35

Component Description:
Project Management
Amount:
$6,015.35

Component Description:
Project Management
Amount:
$723.75

Component Description:
Project Management
Amount:
$4,089.30

Component Description:
Project Management
Amount:
$3,687.15

Component Description:
Project Management
Amount:
$2,412.65

Component Description:
Project Management
Amount:
$1,764.20

Component Description:
Project Management
Amount:
$1,734.85

Component Description:
Project Management
Amount:
$3,813.25

Component Description:
Project Management
Amount:
$3,040.45

Component Description:
Project Management
Amount:
$1,952.35

Component Description:
Project Management
Amount:
$2,575.75

Component Description:
Project management
Amount:
$3,615.40

Component Description:
Project Management
Amount:
$2,439.90

Component Description:
Project Management
Amount:
$1,680.05

Component Description:
Project Management
Amount:
$1,104.60

Component Description:
Project Management
Amount:
$1,608.80

Component Description:
Project Management
Amount:
$4,148.15

Component Description:
Project Management
Amount:
$3,003.80

Component Description:
Project Management
Amount:
$1,675.35

Component Description:
Project Management
Amount:
$2,095.35

Component Description:
Project Management
Amount:
$4,004.35

Component Description:
Project Management
Amount:
$3,296.60

Component Description:
Project Management
Amount:
$778.60

Component Description:
Project Management
Amount:
$2,065.50

Component Description:
Project Management
Amount:
$3,164.40

Component Description:
Project Management
Amount:
$1,490.65

Component Description:
Project Management
Amount:
$2,723.25
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Attorney Channel 28 Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $110,330.00 $109,765.00 N/A $16,949.52 N/A
Total for all systems $2,564,871.72 $2,943,740.80 N/A $676,950.41 N/A
Other Expenses $110,330.00 $109,765.00 $16,949.52
Develop and air announcement of upcoming channel change $15,000.00 $15,000.00 N/A N/A N/A
Equipment Storage $25,000.00 $25,000.00 N/A N/A N/A
Equipment Delivery and Handling Charges $25,000.00 $25,000.00 N/A $16,949.52 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $25,000.00 $25,000.00 N/A N/A N/A
Non-zoning permits $2,500.00 $2,500.00 N/A N/A N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $190.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 N/A N/A N/A
MVPD Notification of Channel Change $750.00 $750.00 N/A $0.00 N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A N/A N/A
Local Zoning $5,000.00 $5,000.00 N/A $0.00 N/A

Components

Actual Information Description File Name
Develop and air announcement of upcoming channel change Information not provided.
Equipment Storage Information not provided.
Equipment Delivery and Handling Charges

Component Description:
FREIGHT, SHIPPING, AND HANDLING PAF VAN DELIVERY
Amount:
$3,847.50

Component Description:
FREIGHT, SHIPPING, AND HANDLING CHAPMAN 58' STRETCH TRAILER DELIVERY
Amount:
$13,102.02
Disposal Costs (for equipment and other waste, net of any salvage value) Information not provided.
Non-zoning permits Information not provided.
FCC Filing Fees - Special Temporary Authorization request Information not provided.
FCC Filing Fees - Form 2100 license to cover application Information not provided.
MVPD Notification of Channel Change Information not provided.
DTV Medical Facility Notification Information not provided.
Local Zoning Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $2,564,871.72 $2,943,740.80 $676,950.41

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. Yes
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Manuel Cavazos , III .

EVP - Director of Technology


07/15/2020

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Manuel Cavazos , III .

EVP - Director of Technology


07/15/2020

Certification

Back to Top
Section Question Response
Submission of Final Allocation or Accounting Information Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  2. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  3. The above-named entity certifies that all costs identified as "actual costs" herein accurately represent the costs actually paid by the above-named entity, including any discounts, refunds, or rebates.

  4. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  5. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  6. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Manuel Cavazos , III .

EVP - Director of Technology


07/15/2020

Attachments

Back to Top