Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
GEORGIA PUBLIC TELECOMMUNICATIONS COMMISSION Doing Business As: GEORGIA PUBLIC TELECOMMUNICATIONS COMMISSION |
Elizabeth Laprade 260 14TH ST NW ATLANTA, GA 30318 United States |
+1 (404) 685-2619 | elaprade@gpb.org | Not-for-Profit |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Robert Gehman Consulting Engineer Kessler and Gehman Associates, Inc. |
Robert Gehman 507 NW 60 St, #D Gainesville, FL 32607 United States |
+1 (352) 332-3157 | bob@kesslerandgehman.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | An interim antenna will be used to prevent turning off the station while tower workers are in close proximity of the main antenna performing modifications and working on the repacked TV station's antenna systems. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Cross Dipole | |
ERP: | 100.0 kW | |
Manufacturer | ||
Model | DCRC12CHV | |
Year | 2008 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Other | |
Other Antenna Type | Circularly polarized dipoles | |
ERP: | 100.0 kW | |
Manufacturer | ||
Model | JSCP-10 | |
Year | 2019 | |
Justification for New Antenna | An interim antenna will be used to prevent turning off the station while tower workers are in close proximity of the main antenna performing modifications and working on the repacked TV station's antenna systems. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
FM Band Pass Filters | Do you require an FM band pass filter? | No |
Notch Filter | Do you require a Notch filter? | No |
De-Icers | Do you require De-Icers? | No |
Radomes | Do you require Radomes? | Yes |
Number of bays | 9 |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Air | |
Diameter | 3 inches | |
Number of parallel runs | 1 | |
Length | 1000 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Air | |
Diameter | 3 inches | |
Number of parallel runs | 1 | |
Length | 720 feet per run | |
Justification for New Transmission Line | An interim line will be used to prevent turning off the station while tower workers are in close proximity of the main antenna performing modifications and working on the repacked TV station's antenna systems. | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | Yes |
Does the Installation of the Transmission Line require additional or replacement Inside RF system elbows, fitting, hangers, etc.? | Yes |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1018798 | |
Coordinates (NAD83) | Latitude (NAD83) | 32° 28' 12.2" N- |
Longitude (NAD83) | 083° 15' 18.0" W- | |
Overall Structure Height | 1168.95 feet | |
Support Structure Height | 1109.89 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 398.95 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | GEORGIA PUBLIC TELECOMMUNICATIONS COMMISSION | |
Date Constructed | 03/02/2016 |
Facility ID | Call Sign | Service |
---|---|---|
23935 | WMUM-TV | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Tower mapping and report for structural engineer |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Major Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Prepare engineering section of Form FCC Construction Permit Application | No |
Prepare engineering section of Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
Prepare and file Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
Actual Cost Invoice |
Actual Cost reimbursement invoice prep & submit |
Other Engineering Services |
Design, plan, specify, review approve, and oversee all work for this project |
Other Legal Services |
Other Legal Services |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No | |
1 pair IP-only Codecs for fiber, internet or IP microwave systems | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $27,480.00 | $0.00 | N/A | $0.00 | N/A |
Total for all systems | $263,490.50 | $248,655.50 | N/A | $6,315.50 | N/A |
Primary Antenna JSCP-10 | $27,480.00 | $0.00 | $0.00 | ||
Radomes (per bay) | $12,150.00 | $0.00 | N/A | N/A | N/A |
Side Mount antenna brackets | $0.00 | $0.00 | Included in Antenna Cost | N/A | N/A |
Sweep test of existing antenna | $5,730.00 | $0.00 | Included in Antenna Cost | N/A | N/A |
High Power 51 - 100 kW Circularly-polarized | $9,600.00 | $0.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $42,480.00 | $0.00 | N/A | $0.00 | N/A |
Total for all systems | $263,490.50 | $248,655.50 | N/A | $6,315.50 | N/A |
Primary Transmission Line | $42,480.00 | $0.00 | $0.00 | ||
Flexible Air Transmission Line - dielectric, 3" | $42,480.00 | $0.00 | Included in Antenna Cost | N/A | N/A |
Interior RF Systems: Inside RF system including switching, patch panels and dehydrators | $0.00 | $0.00 | N/A | N/A | N/A |
Interior RF Systems: Elbows, fitting, hangers, etc. | $0.00 | $0.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $157,750.00 | $210,500.00 | N/A | $0.00 | N/A |
Total for all systems | $263,490.50 | $248,655.50 | N/A | $6,315.50 | N/A |
Primary Tower GTOWER | $157,750.00 | $210,500.00 | $0.00 | ||
Major tower reinforcement/modifications | $0.00 | $0.00 | N/A | N/A | N/A |
Tower Rigging Tall Tower (greater than 500') | $157,750.00 | $210,500.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $25,780.50 | $28,155.50 | N/A | $6,315.50 | N/A |
Total for all systems | $263,490.50 | $248,655.50 | N/A | $6,315.50 | N/A |
Outside Professional Services | $25,780.50 | $28,155.50 | $6,315.50 | ||
Other Legal Services | $555.50 | $555.50 | See attached / uploaded PDF files titled "GMP 31100 v200218jgv1.pdf" and "GMP 31275 v200218jgv1.pdf" | $555.50 | N/A |
Other Engineering Services | $10,000.00 | $10,000.00 | N/A | $1,675.00 | N/A |
Actual Cost Invoice | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $2,235.00 | N/A | N/A | N/A |
Form 399 assistance or other Program Management costs | $0.00 | $0.00 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $1,280.00 | $1,280.00 | N/A | N/A | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $4,085.00 | The Estimate Cost includes Form 399 submissions including ongoing Actual Cost invoice prep and submission, and amendments as needed. | $4,085.00 | N/A |
Actual Information Description | File Name |
---|---|
Other Legal Services | |
Other Engineering Services | |
Actual Cost Invoice | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Form 399 assistance or other Program Management costs | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
Prepare/ Review 399 reimbursement form |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $10,000.00 | $10,000.00 | N/A | $0.00 | N/A |
Total for all systems | $263,490.50 | $248,655.50 | N/A | $6,315.50 | N/A |
Other Expenses | $10,000.00 | $10,000.00 | $0.00 | ||
Equipment Delivery and Handling Charges | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $263,490.50 | $248,655.50 | $6,315.50 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jeffrey C Gehman Engineering Associate 06/09/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jeffrey C Gehman Engineering Associate 06/09/2020 |