Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
TRINITY BROADCASTING OF TEXAS, INC. Doing Business As: Trinity Broadcasting Network |
13600 Heritage Parkway Fort Worth, TX 76177 United States |
+1 (855) 826-2255 | cmmay@maylawoffices.com | Not-for-Profit |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | Remain on the air at full power. Install new SS xmitter at the ATC "Milton Tower" location. test. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | DCX 2 | |
Year | 2004 | |
Type | Inductive Output Tube | |
IOT Power Type | Two | |
Power Capacity | 50 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | HPTV PRLX U18 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 30 kW | |
Justification for New Transmitter | See Attached |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 300 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 2 inches | |
Length | 500.0 feet | |
Other Electrical Service | Yes | |
Description | disconnects, labor, panels | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Heating and Cooling | |
Size | 10 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 1500.0 square feet | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
install |
xmitter install |
Ice Shield |
Ice shield for HVAC |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Owner | Americanm Tower | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 4 | |
Number of Panels | 16 | |
Design power capacity in use | 80.0 % | |
Lower Limit | 470.00 MHz | |
Upper Limit | 800.00 MHz | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | PHP-36C | |
Year | 2000 |
Facility ID | Call Sign |
---|---|
22201 | KDAF |
42359 | KTXD-TV |
49326 | KDTN |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Leased | |
Owner | American Tower | |
Is antenna shared? | Yes | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Class A |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Broadband Panel | |
Number of Stations Supported | 4 | |
Number of Panels/Bays | 14 | |
Lower Limit | 490.00 MHz | |
Upper Limit | 593.00 MHz | |
Design power capacity in use | 80.0 % | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | TUM-AP-C4-14/48H-2-R-B | |
Year | 2017 | |
Justification for New Antenna | RELOCATING TO NEW SITE. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 4 | |
Frequencies of channels supported | Upper and lower frequency | |
Frequency | 483.0 MHz - 597.0 MHz | |
Do you need a combiner output splitter/switcher for dual feed lines? | No | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Broadband | |
Feed Line Size | 8 3/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Owner | American Tower | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | Yes | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 8 3/16 inches | |
Other Diameter | N/A | |
Segment Length | Broadband | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1800 feet per run |
Facility ID | Call Sign |
---|---|
42359 | KTXD-TV |
22201 | KDAF |
49326 | KDTN |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Other Diameter | N/A | |
Segment Length | Broadband | |
Other Segment Length | N/A | |
Number of parallel runs | 2 | |
Length | 1700 feet per run | |
Justification for New Transmission Line | Relocating to new site |
Name | Description |
---|---|
Transmission line Bridge |
transmission line bridge |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | Candelabra | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1059733 | |
Coordinates (NAD83) | Latitude (NAD83) | 32° 32' 36.0" N- |
Longitude (NAD83) | 096° 57' 33.0" W- | |
Overall Structure Height | 1635.15 feet | |
Support Structure Height | 1523.60 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 813.97 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | American Towers, LLC | |
Date Constructed | 06/18/2000 |
Facility ID | Call Sign | Service |
---|---|---|
23422 | KTVT | DTV |
22201 | KDAF | DTV |
49324 | KERA-TV | DTV |
42359 | KTXD-TV | DTV |
68834 | KPXD-TV | DTV |
17037 | KDFI | DTV |
51517 | KTXA | DTV |
49326 | KDTN | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Candelabra |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Ground |
Permit package |
Permit |
Drawing package |
structural |
load study |
Construction project |
Construction project management |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 95 | |
Explanation | American Tower | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | No | |
For Auxiliary Facility | N/A | |
For Main Facility | N/A | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | No | |
For Auxiliary Facility | N/A | |
For Main Facility | N/A | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
NEPA Section 106 environmental review | Yes | |
Environmental Assessment | Yes | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
RF System test |
RF System Test |
migratory bird assessment |
Migratory Bird assessment |
site coordination meeting |
site coordination meetings |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | No | |
Does this relocation require MVPD Notification of a Channel Change? | No |
Name | Description |
---|---|
cost of construction |
cost of construction electrical permits |
cost of construction |
Electrical permits |
site security |
Site security theft and vandalism |
tree clearing |
tag alley |
Nitrogen Generator |
Nitrogen Generator |
Lease Application fee |
Lease Application fee |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,349,900.00 | $1,230,850.00 | N/A | $1,131,882.99 | N/A |
Total for all systems | $3,584,935.00 | $2,185,785.00 | N/A | $1,692,026.15 | N/A |
Primary Transmitter HPTV PRLX U18 | $1,349,900.00 | $1,230,850.00 | $1,131,882.99 | ||
Ice Shield | $40,000.00 | $40,000.00 | Quoted by American Tower | $30,000.00 | N/A |
10 Ton system | $60,500.00 | $50,600.00 | ***System Notice: Estimate adjusted and locked because line has been superseded.*** | $243,800.00 | quoted |
Other Electrical Service: disconnects, labor, panels | $30,000.00 | $30,000.00 | N/A | $0.00 | N/A |
2" Rigid Conduit and Wiring (Cost per foot) | $13,000.00 | $6,250.00 | N/A | N/A | N/A |
Transformer 3 phase/480v - 300 KVA | $36,800.00 | $17,500.00 | N/A | N/A | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $12,000.00 | N/A | N/A | N/A |
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $4,500.00 | N/A | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW | $947,000.00 | $900,000.00 | N/A | $755,383.00 | N/A |
install | $40,000.00 | $40,000.00 | xmitter install quoted | $40,000.00 | N/A |
Other -- Building Addition Size: 1500.0 | $130,000.00 | $130,000.00 | quoted by American Tower | $62,699.99 | N/A |
Actual Information Description | File Name |
---|---|
Ice Shield | |
10 Ton system | |
Other Electrical Service: disconnects, labor, panels | Information not provided. |
2" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Transformer 3 phase/480v - 300 KVA | Information not provided. |
Switchgear - industrial 800 amp | Information not provided. |
Service entrance 3 phase/800 amp/208 volt | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW | |
install | |
Other -- Building Addition Size: 1500.0 |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $275,980.00 | $239,050.00 | N/A | $158,374.98 | N/A |
Total for all systems | $3,584,935.00 | $2,185,785.00 | N/A | $1,692,026.15 | N/A |
Primary Antenna TUM-AP-C4-14/48H-2-R-B | $275,980.00 | $239,050.00 | $158,374.98 | ||
UHF - Lower Power, Top Mount, Class A, broadband panel, 14 bay,, 1000 kW input, directional,, elliptically or circularly polarized | $158,000.00 | $158,000.00 | quoted by ATC | $100,999.98 | N/A |
Installation | $8,100.00 | $8,100.00 | Combiner installation quoted by ATC | $4,687.50 | N/A |
Elbow complex, broadband, at antenna input, per 8 3/16. feedline (if needed) | $18,950.00 | $9,200.00 | N/A | $4,875.00 | N/A |
New combiner, cost per channel (without antenna) | $84,200.00 | $60,000.00 | N/A | $45,000.00 | N/A |
Sweep test of existing antenna | $6,730.00 | $3,750.00 | N/A | $2,812.50 | N/A |
Actual Information Description | File Name |
---|---|
UHF - Lower Power, Top Mount, Class A, broadband panel, 14 bay,, 1000 kW input, directional,, elliptically or circularly polarized | |
Installation | |
Elbow complex, broadband, at antenna input, per 8 3/16. feedline (if needed) | |
New combiner, cost per channel (without antenna) | |
Sweep test of existing antenna |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,169,200.00 | $337,000.00 | N/A | $168,716.25 | N/A |
Total for all systems | $3,584,935.00 | $2,185,785.00 | N/A | $1,692,026.15 | N/A |
Primary Transmission Line | $1,169,200.00 | $337,000.00 | $168,716.25 | ||
Transmission line Bridge | $37,000.00 | $37,000.00 | Transmission line bridge. quoted by American tower. | $16,875.00 | N/A |
Rigid Transmission Line - copper, 7 3/16" broadband | $1,132,200.00 | $300,000.00 | N/A | $151,841.25 | N/A |
Actual Information Description | File Name |
---|---|
Transmission line Bridge | |
Rigid Transmission Line - copper, 7 3/16" broadband |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $633,610.00 | $267,115.00 | N/A | $179,711.53 | N/A |
Total for all systems | $3,584,935.00 | $2,185,785.00 | N/A | $1,692,026.15 | N/A |
Primary Tower GTOWER | $633,610.00 | $267,115.00 | $179,711.53 | ||
Construction project | $15,000.00 | $15,000.00 | Construction project management, quoted ATC | $5,625.00 | N/A |
Permit | $4,700.00 | $4,700.00 | N/A | $3,525.00 | N/A |
Ground | $4,700.00 | $4,700.00 | N/A | $3,525.00 | N/A |
structural | $3,910.00 | $3,910.00 | N/A | $2,932.50 | N/A |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $63,845.00 | N/A | $47,884.03 | N/A |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $4,960.00 | N/A | $3,720.00 | N/A |
Minor tower reinforcement/modifications | $158,000.00 | $170,000.00 | Quoted by ATC | $112,500.00 | N/A |
Actual Information Description | File Name |
---|---|
Construction project | |
Permit | |
Ground | |
structural | |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | |
Minor tower reinforcement/modifications |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $97,445.00 | $56,490.00 | N/A | $23,982.50 | N/A |
Total for all systems | $3,584,935.00 | $2,185,785.00 | N/A | $1,692,026.15 | N/A |
Outside Professional Services | $97,445.00 | $56,490.00 | $23,982.50 | ||
site coordination meeting | $2,500.00 | $2,500.00 | Site coordination meeting. 25% deposit see attached cap Con for details. | $1,875.00 | N/A |
migratory bird assessment | $350.00 | $350.00 | Migratory Bird assessment. Quoted by American Tower. | $262.50 | N/A |
RF System test | $5,000.00 | $5,000.00 | Quoted by American tower | $3,000.00 | N/A |
RF Exposure Measurements | $21,050.00 | $3,000.00 | N/A | $2,250.00 | N/A |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | $10,520.00 | $1,080.00 | N/A | $810.00 | N/A |
NEPA Section 106 environmental review, if needed | $6,310.00 | $1,080.00 | N/A | $0.00 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $7,360.00 | $7,000.00 | N/A | N/A | N/A |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | $2,105.00 | $2,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $4,100.00 | $3,000.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | $2,105.00 | $2,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $1,750.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $5,050.00 | Q |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | $1,875.00 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Project management of the transition | $15,010.00 | $9,480.00 | N/A | $7,110.00 | N/A |
Actual Information Description | File Name |
---|---|
site coordination meeting | |
migratory bird assessment | |
RF System test | |
RF Exposure Measurements | |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | |
NEPA Section 106 environmental review, if needed | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | |
Prepare and or review reimbursement form | Information not provided. |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $58,800.00 | $55,280.00 | N/A | $29,357.90 | N/A |
Total for all systems | $3,584,935.00 | $2,185,785.00 | N/A | $1,692,026.15 | N/A |
Other Expenses | $58,800.00 | $55,280.00 | $29,357.90 | ||
Lease Application fee | $2,500.00 | $2,500.00 | Quoted ATC | N/A | N/A |
Local Zoning | $4,700.00 | $4,700.00 | Quoted by ATC | $3,525.00 | N/A |
Non-zoning permits | $0.00 | $0.00 | N/A | $0.00 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $5,100.00 | $5,100.00 | Quoted ATC | N/A | N/A |
Equipment Delivery and Handling Charges | $5,000.00 | $5,000.00 | American Tower | $3,750.00 | N/A |
Equipment Storage | $6,000.00 | $6,000.00 | Quoted ATC | N/A | N/A |
cost of construction | $10,000.00 | $10,000.00 | Cost of construction electrical permits. quoted by ATC | $7,500.00 | N/A |
site security | $8,550.00 | $8,550.00 | quoted by ATC | $6,412.50 | N/A |
tree clearing | $1,600.00 | $1,600.00 | Quoted by ATC | $1,200.00 | N/A |
Nitrogen Generator | $3,800.00 | $3,800.00 | Quoted ATC | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $8,030.00 | N/A | $6,970.40 | N/A |
Actual Information Description | File Name |
---|---|
Lease Application fee | Information not provided. |
Local Zoning | |
Non-zoning permits | Information not provided. |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Equipment Delivery and Handling Charges | |
Equipment Storage | Information not provided. |
cost of construction | |
site security | |
tree clearing | |
Nitrogen Generator | Information not provided. |
DTV Medical Facility Notification |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $3,584,935.00 | $2,185,785.00 | $1,692,026.15 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Steve Hastings Network RF Manager 06/02/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Steve Hastings Network RF Manager 06/02/2020 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Steve Hastings Network RF Manager 06/02/2020 |