Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
64611
Service:
DTV
Call Sign:
WRAZ
Channel:
15 (UHF)
File Number:
0000027650
FRN:
0004062337
Date Submitted:
05/18/2020

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

WRAZ-TV, Inc.

Jennifer B. Venable

2619 Western Boulevard

Raleigh, NC 27606

United States

+1 (919) 821-8933 jvenable@capitolbroadcasting.com Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Peter Sockett

Director of Engineering and Operations

Capitol Broadcasting Company / WRAZ-TV Inc.

Pete Sockett

2619 Western Blvd

Raleigh, NC 27606

United States

+1 (919) 821-8573 psockett@wral.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan All 4 broadcasters will need to replace antennas on the candelabra. The transition plan for WRAL / WRAZ is to replace the existing Aux antenna with a single ch15 / 17 slot antenna at approx 1720ft (524m) to use as both the new AUX and interim facility.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model CD2400P4
Year 1999
Type Inductive Output Tube
IOT Power Type Other
Other IOT Power Type 4 tube system
Power Capacity 100 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model ULXTED-100
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 63.4 kW
Justification for New Transmitter 1) Manufacturer (Gates Air) will not support channel changes to this model of transmitter. 2) Comark estimate for IOT transmitter is higher than a solid State transmitter from GatesAir

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) Yes
Power 300 kVA
Rigid Conduit and Wiring Yes
Size 4 inches
Length 400.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 15 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 1600.0 square feet
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

System installation

Manufacturer to come to site to install and commission.

Spare Modules and Power supplies

Currently we keep 1 spare IOT tube on hand in the event of a failure. This purchases spare parts for Solid State TX

Other Transmitter Costs

Saddle Type Directional Couplers for Transmitter.

RF System

Magic T / Mask filter / Dummy load and RF Line for Installation

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Auxiliary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Auxiliary (Backup)
Description of Use Auxilary (Backup)
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? Yes
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Broadband Panel
Number of Stations Supported 2
Number of Panels 36
Design power capacity in use 100.0 %
Lower Limit 674.00 MHz
Upper Limit 710.00 MHz
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model ETU-P3H12-(48-53)
Year 2008

Facility ID's and Call Signs of all stations with whom the antenna is shared.

Facility ID Call Sign
8688 WRAL-TV

Auxiliary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Auxiliary (Backup)
Description of Use Interim Facility and Auxiliary (Backup)
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? Yes
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 690.0 kW
Manufacturer
Model ATW25H3-ESO-15/17H
Year 2018
Justification for New Antenna This antenna will serve as both an Interim facility while the candelabra is rebuilt and will replace the existing AUX antenna already in service for both WRAZ and WRAL

Auxiliary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 2
Frequencies of channels supported Upper and lower frequency
Frequency 476.0 MHz - 494.0 MHz
Do you need a combiner output splitter/switcher for dual feed lines? No
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Broadband
Feed Line Size 8 3/16 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Auxiliary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Bottom
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model ATW25H3-ETOU-50H
Year 2000

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Bottom
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 509.0 kW
Manufacturer
Model ATW25H4-ETO-15M
Year 2018
Justification for New Antenna Required as old antenna is cut for channel 49

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 7 3/16 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Arbor top plate

On candelabra arm, tower interface top plate will need to be designed and built for proper antenna connection and height

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Auxiliary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use Auxiliary (Backup)
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? Yes
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 7 3/16 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1738 feet per run

Facility ID's and Call Signs of all stations with whom the transmission line is shared.

Facility ID Call Sign
8688 WRAL-TV

Auxiliary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Auxiliary (Backup)
Description of Use Interim Facility and Auxiliary (Backup)
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 8 3/16 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 1
Length 2013 feet per run
Justification for New Transmission Line Required to feed new Aux / Interim antenna. Cost will be split with WRAL.

Auxiliary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 7 3/16 inches
Other Diameter N/A
Segment Length Other
Other Segment Length 19.66 feet
Number of parallel runs 1
Length 2153 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 7 3/16 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 450 feet per run
Justification for New Transmission Line Existing line was swept and will not support this new channel. Therefore we are extending the existing AUX antenna line to the top for the main antenna

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? Candelabra
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Yes
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1027322
Coordinates (NAD83) Latitude (NAD83) 35° 40' 29.0" N-
Longitude (NAD83) 078° 31' 39.0" W-
Overall Structure Height 1988.82 feet
Support Structure Height 1988.82 feet
Ground Elevation Above Mean Sea Level (AMSL) 359.90 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner CBC REAL ESTATE COMPANY, INC.
Date Constructed 03/23/2000

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
50782 WNCN DTV
73205 WLFL DTV
8688 WRAL-TV DTV
73936 WTKK FM

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for tower with candelabra
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Candelabra
Helicopter Services Required Are helicopter services required? Yes

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Relocate ENG Dish

Relocate 2 ENG receive dishes to create room for Interim / Aux antennas - Split with WRAL

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 220
Explanation WRAL/WRAZ has only one engineer currently available at the TX site . Additional project management is necessary. The estimate is an average of 20 hrs per month for Jan - November of 2019. Note: post Phase 5 the candelabra still needs to be rebuilt.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority No
Quantity N/A
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority No
Quantity N/A
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements Yes
Additional Field Engineering Service Yes
Number of Days 3
Justification Independent verification and inspection of installed systems

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Legal Guidance for repack

Legal fees related to repack guidance.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning Yes
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? No
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Facility remote control and monitoring modifications

Modifications to existing system to add new telemetry and control.

Sigma Transmitter and RF System removal

Complete removal of old WRAZ Sigma IOT transmitter and related RF system. Properly dispose of all hazardous liquids and materials.

Unexpected Site Modifications

Site modifications to allow for continuation of antenna installations due to weather.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $3,005,979.00 $2,872,982.00 N/A $2,834,145.43 N/A
Total for all systems $5,879,806.00 $5,659,518.00 N/A $4,829,494.36 N/A
Primary Transmitter ULXTED-100 $3,005,979.00 $2,872,982.00 $2,834,145.43
Spare Modules and Power supplies $35,000.00 $35,000.00 N/A N/A N/A
RF System $1.00 $1.00 Included in overall TX price N/A N/A
Other Transmitter Costs $2,300.00 $2,300.00 N/A $2,284.64 N/A
System installation $1.00 $1.00 Included in overall TX price N/A N/A
Other -- Building Addition Size: 1600.0 $869,639.00 $869,639.00 Our facility is full with no room to install new equipment before old equipment is removed. This facility will be shared with WRAL. This is 1/2 the cost, other half will be represented on WRAL. Please see "building cost narrative" recently uploaded. $868,122.91 N/A
4" Rigid Conduit and Wiring (Cost per foot) $40,400.00 $1.00 Now included in total building estimate N/A N/A
Transformer 3 phase/480v - 300 KVA $36,800.00 $1.00 Included in overall TX price N/A N/A
UHF - Liquid Cooled Solid State Transmitter 63.4 kW $1,966,038.00 $1,966,038.00 Combined all costs and freight costs from GatesAir in this line. $1,963,737.88 N/A
15 Ton system $55,800.00 $1.00 Now included in total building estimate N/A N/A

Components

Actual Information Description File Name
Spare Modules and Power supplies Information not provided.
RF System Information not provided.
Other Transmitter Costs

Component Description:
Saddle type directional couplers for new transmitter monitoring and control.
Amount:
$2,284.64
System installation Information not provided.
Other -- Building Addition Size: 1600.0

Component Description:
First invoice (Pay app) in construction project - Split 50/50 with WRAL
Amount:
$254,945.59

Component Description:
WRAZ portion of ITS Invoice WRAL-WRAZ-011 for final payment for building construction.
Amount:
$78,560.15

Component Description:
WRAZ Portion of Osborn Invoice 27628 Revised with expense receipts.
Amount:
$1,267.64

Component Description:
Wire costs for new building construction/wiring interconnect.
Amount:
$1,149.28

Component Description:
REVISED WRAZ portion on BeckTV Invoice number 10351 for new building addition infrastructure equipment.
Amount:
$8,538.41

Component Description:
WRAZ portion (1/2) of the ITS Invoice WRAL-WRAZ-009
Amount:
$6,750.00

Component Description:
WRAZ Portion of Osborn Invoice 27973
Amount:
$5,111.97

Component Description:
WRAZ Portion of Osborn Invoice 28690
Amount:
$20,320.00

Component Description:
WRAZ portion of ITS invoice WRAL-WRAZ-007
Amount:
$48,375.00

Component Description:
WRAZ Portion of Osborn Invoice 28274 REVISED with expense receipts.
Amount:
$14,745.14

Component Description:
WRAZ half of Osborn Invoice 36830
Amount:
$9,165.00

Component Description:
WRAZ half of Intellicom, Inc invoice for fiber cable and installation.
Amount:
$6,045.00

Component Description:
WRAZ Portion of Osborn Invoice 27327
Amount:
$7,741.52

Component Description:
WRAZ Portion (1/2) of the ITS invoice WRAL-WRAZ-010
Amount:
$7,933.07

Component Description:
WRAZ Portion of Osborn Invoice 27175
Amount:
$7,563.71

Component Description:
REVISED Ross Video Limited Invoice for new building addition infrastructure equipment.
Amount:
$3,668.79

Component Description:
Second invoice (Pay app) in construction project - Split 50/50 with WRAL
Amount:
$70,087.95

Component Description:
Fifth invoice (Pay app) in construction project - Split 50/50 with WRAL
Amount:
$50,216.16

Component Description:
Fourth invoice (Pay app) in construction project - Split 50/50 with WRAL
Amount:
$70,326.24

Component Description:
Third invoice (Pay app) in construction project - Split 50/50 with WRAL
Amount:
$111,204.89

Component Description:
WRAZ portion of ITS invoice WRAL-WRAZ-008
Amount:
$48,892.50

Component Description:
WRAZ Portion of Osborn Invoice 29157
Amount:
$933.69

Component Description:
WRAZ portion of ITS invoice WRAL-WRAZ-006
Amount:
$38,250.00
4" Rigid Conduit and Wiring (Cost per foot) Information not provided.
Transformer 3 phase/480v - 300 KVA Information not provided.
UHF - Liquid Cooled Solid State Transmitter 63.4 kW

Component Description:
Gates second invoice - includes RF system and electrical (transformer)
Amount:
$943,250.41

Component Description:
REVISED invoice number. Final Payment for the WRAZ main transmitter, installation and freight charges.
Amount:
$106,461.97

Component Description:
Revised amount requested to 0 as per email message Ref:MSG4560328 - Date/Time: 2020-03-27 12:36:56 EDT
Amount:
N/A

Component Description:
50% down for Transmitter
Amount:
$914,025.50
15 Ton system Information not provided.

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $620,920.00 $681,704.00 N/A $546,657.31 N/A
Total for all systems $5,879,806.00 $5,659,518.00 N/A $4,829,494.36 N/A
Primary Antenna ATW25H4-ETO-15M $345,130.00 $414,704.00 $359,801.92
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $6,250.00 N/A
Arbor top plate $35,000.00 $35,000.00 This will be required as a custom piece to match the antenna base to the candelabra arm N/A N/A
Elbow complex, single channel, at antenna input, per 7 3/16. feedline (if needed) $13,900.00 $13,200.00 N/A N/A N/A
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized $289,500.00 $360,104.00 This antenna is the bottom antenna of a 2 antenna stack. Hence is is a bigger/ stronger antenna to support the other antenna. Freight Charges added also. $353,551.92 This is the bottom of a 2 antenna stack with WRAL - therefore is a much stronger and therefore more expensive antenna
Auxiliary Antenna ATW25H3-ESO-15/17H $275,790.00 $267,000.00 $186,855.39
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $2,500.00 1/2 split with WRAL N/A N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $11,000.00 1/2 split with WRAL $7,425.00 N/A
Elbow complex, broadband, at antenna input, per 8 3/16. feedline (if needed) $18,950.00 $17,800.00 This antenna is a "combined antenna" the other 1/2 of the cost is shared with WRAL $17,737.04 N/A
Sweep test of existing antenna $6,730.00 $3,200.00 1/2 split with WRAL N/A N/A
UHF - High Power, Side Mount, basic slot antenna, 690 kW input, elliptically or circularly polarized $137,500.00 $137,500.00 This antenna is a "combined antenna" the other 1/2 of the cost is shared with WRAL $129,733.84 N/A
New combiner, cost per channel (without antenna) $84,200.00 $95,000.00 Interim (AUX) antenna will support full power from each station (WRAL and WRAZ) requiring larger sized combiner. $31,959.51 N/A

Components

Actual Information Description File Name
Sweep test of existing antenna

Component Description:
Final payment for transmission line sweep (15%).
Amount:
$937.50

Component Description:
Final payment (15%) for System Sweep
Amount:
$937.50

Component Description:
85% initial payment - System Sweep
Amount:
$5,312.50
Arbor top plate Information not provided.
Elbow complex, single channel, at antenna input, per 7 3/16. feedline (if needed) Information not provided.
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized

Component Description:
Final payment (15%) and freight for Primary Antenna - ATW25H4-ETO-15M.
Amount:
$58,601.92

Component Description:
85% initial payment - WRAZ Main antenna
Amount:
$294,950.00
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) Information not provided.
Side mount brackets for high power antennas (if not included in antenna base cost)

Component Description:
1/2 of combined WRAL/WRAZ Aux bracket set - 85% initial billing
Amount:
$6,311.25

Component Description:
WRAZ portion of the WRAL/WRAZ Aux Antenna Leg Mount Bracket. Final 15%
Amount:
$1,113.75
Elbow complex, broadband, at antenna input, per 8 3/16. feedline (if needed)

Component Description:
Corrected Amount - 50% of ERI Invoice 53331 for WRAZ. Other 50% split with WRAL
Amount:
$17,737.04
Sweep test of existing antenna Information not provided.
UHF - High Power, Side Mount, basic slot antenna, 690 kW input, elliptically or circularly polarized

Component Description:
1/2 of Combined WRAL/WRAZ Aux/interim antenna - 85% initial billing
Amount:
$105,134.38

Component Description:
WRAZ portion of final 15% due for WRAL/WRAZ Aux antenna plus freight.
Amount:
$24,599.46
New combiner, cost per channel (without antenna)

Component Description:
WRAZ half of ERI invoice 53331-1 for items related to interim system combiner install.
Amount:
$10,709.51

Component Description:
WRAZ portion of final 15% due for the WRAL/WRAZ Aux.combiner
Amount:
$3,187.50

Component Description:
1/2 of Combined WRAL/WRAZ AUx Antenna combiner - 85% initial billing
Amount:
$18,062.50

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $933,687.00 $780,000.00 N/A $501,112.75 N/A
Total for all systems $5,879,806.00 $5,659,518.00 N/A $4,829,494.36 N/A
Primary Transmission Line $130,500.00 $280,000.00 $241,663.71
Rigid Transmission Line - copper, 7 3/16" $130,500.00 $280,000.00 This is for Transmission line, hangers elbows etc. Also includes UHF fine matchers dehydrator and design work $241,663.71 N/A
Auxiliary Transmission Line $803,187.00 $500,000.00 $259,449.04
Rigid Transmission Line - copper, 8 3/16" broadband $803,187.00 $500,000.00 This represents 1/2. WRAL will cover the other 1/2 $259,449.04 N/A

Components

Actual Information Description File Name
Rigid Transmission Line - copper, 7 3/16"

Component Description:
1 piece of 7 3/16" transmission line for WRAZ antenna installation. One 4-1/16" elbow for WRAZ antenna installation.
Amount:
$3,923.60

Component Description:
Final payment (15%) for transmission line dehydrator.
Amount:
$1,398.67

Component Description:
Final payment (15%) for transmission line complex design.
Amount:
$1,631.25

Component Description:
Final Payment (15%) and freight costs for Transmission Line System.
Amount:
$38,200.22

Component Description:
Final payment (15%) for Sahara dehydrator
Amount:
$1,398.67

Component Description:
85% payment for Sahara dehydrator
Amount:
$7,925.82

Component Description:
please disregard
Amount:
N/A

Component Description:
Full payment for extra piece of WRAZ main transmission line. Macxline 775-20
Amount:
$3,256.35

Component Description:
85% payment for TX Line System - Complex design and Install drawings
Amount:
$9,243.75

Component Description:
Final payment (15%) for Transmission line system
Amount:
$31,648.31

Component Description:
85% payment for Main transmission line
Amount:
$179,340.40

Component Description:
Final payment (15%) for Complex design and install drawings.
Amount:
$1,631.25

Component Description:
Full payment for extra elbow for WRAZ transmission line. 4-1/16 50 ohm
Amount:
$667.25
Rigid Transmission Line - copper, 8 3/16" broadband

Component Description:
1/2 of ERI Invoice 54459.
Amount:
$5,205.36

Component Description:
1/2 of WRAL/WRAZ Aux Antenna transmission line
Amount:
$206,396.21

Component Description:
WRAZ portion of the WRAL/WRAZ Aux transmission line dehydrator after discount. Final payment.
Amount:
$394.09

Component Description:
WRAZ portion of the WRAL/WRAZ Aux Transmission Line System plus freight. Final 15% payment.
Amount:
$42,469.20

Component Description:
1/2 of WRAL/WRAZ combined antenna - Sahara dehydrator
Amount:
$3,962.91

Component Description:
WRAZ portion of the extra cut piece of transmission line for the WRAL/WRAZ Aux. transmission line. Full payment.
Amount:
$1,021.27

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,025,800.00 $1,117,597.00 N/A $880,096.22 N/A
Total for all systems $5,879,806.00 $5,659,518.00 N/A $4,829,494.36 N/A
Primary Tower TOWER $1,025,800.00 $1,117,597.00 $880,096.22
Tower Helicopter Lift $401,800.00 $401,800.00 No predetermined estimate available. $401,800.00 N/A
Relocate ENG Dish $25,000.00 $25,000.00 This represents 1/2. WRAL will cover the other 1/2 N/A N/A
Minor tower reinforcement/modifications $158,000.00 $158,000.00 N/A N/A N/A
Structural engineering tower load study for a documented tower with candelabra $20,000.00 $19,000.00 N/A $4,750.00 N/A
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $513,797.00 Antenna installation costs are above the predetermined cost estimate. This is due to extra rigging expense and unexpected antenna installation overages. $473,546.22 N/A

Components

Actual Information Description File Name
Tower Helicopter Lift

Component Description:
WRAZ old antenna removal and new antenna placement via helicopter. 50% deposit with order.
Amount:
$197,275.00

Component Description:
WRAZ - Old antenna removal and new antenna placement via helicopter. 10% final payment.
Amount:
$39,455.00

Component Description:
WRAZ portion of James River invoice 2002 for helicopter landing pad.
Amount:
$7,250.00

Component Description:
WRAZ - Old antenna removal and new antenna placement via helicopter. 40% payment prior to mobilization.
Amount:
$157,820.00
Relocate ENG Dish Information not provided.
Minor tower reinforcement/modifications Information not provided.
Structural engineering tower load study for a documented tower with candelabra

Component Description:
WRAZ portion of ERI Invoice 52341 for structural analysis. Remainder of invoice charged to WRAL.
Amount:
$4,750.00
Complex Tower (includes, for example, those with candelabras and/or stacked antennas)

Component Description:
ERI Invoice WRAZ-55314-2
Amount:
$902.50

Component Description:
Credit Invoice issued against ERI invoice WRAZ-55314-2
Amount:
($20,125.00)

Component Description:
WRAZ 50% balance due for tower installation services.
Amount:
$61,870.00

Component Description:
WRAZ portion of ERI Invoice WRAL-53700. Remainder of invoice charged to WRAL.
Amount:
$10,500.00

Component Description:
WRAZ portion of ERI Invoice WRAL-5000 50% deposit with order. Remainder of invoice charged to WRAL
Amount:
$52,234.68

Component Description:
50% deposit on total invoice amount.
Amount:
$14,500.00

Component Description:
WRAZ cost for 1/2 of tower plumb and tension total cost. Total cost - $46,500.00
Amount:
$23,250.00

Component Description:
WRAZ antenna installation. 40% prior to mobilization.
Amount:
$84,110.00

Component Description:
WRAZ 50% deposit with order for tower installation services
Amount:
$61,870.00

Component Description:
WRAZ portion of the ERI invoice WRAL-53914. Remainder of invoice charged to WRAL.
Amount:
$10,446.93

Component Description:
WRAZ portion of the ERI Invoice WRAL-5000A. The remaining invoice amount is charged to WRAL
Amount:
$41,787.75

Component Description:
Final payment of 50% on invoice total.
Amount:
$14,500.00

Component Description:
WRAZ antenna installation. 50% deposit with order.
Amount:
$105,137.50

Component Description:
WRAZ portion of the ERI invoice WRAL-54736
Amount:
$12,561.86

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $193,385.00 $115,050.00 N/A $55,805.50 N/A
Total for all systems $5,879,806.00 $5,659,518.00 N/A $4,829,494.36 N/A
Outside Professional Services $193,385.00 $115,050.00 $55,805.50
Comprehensive coverage verification via field study, if needed $84,200.00 $30,000.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A $250.00 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A N/A N/A
Project management of the transition $34,760.00 $30,800.00 N/A $29,680.00 N/A
Legal Guidance for repack $14,000.00 $14,000.00 N/A $12,125.50 N/A
Additional Field Engineering Service, 3 Days $6,500.00 $6,500.00 Estimating $2000 per day for an independent verification of the new transmission systems $6,500.00 N/A
RF Exposure Measurements $21,050.00 $2,500.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application $4,210.00 $4,000.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A N/A N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application $1,580.00 $1,500.00 N/A $1,000.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $5,000.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $250.00 N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application $2,105.00 $2,000.00 N/A $1,000.00 N/A

Components

Actual Information Description File Name
Comprehensive coverage verification via field study, if needed Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application

Component Description:
du Treil, Lundin & Rackley, Inc invoice 243950 for license app to cover CP.
Amount:
$250.00

Component Description:
RF Consultant fees for application to cover permit for main antenna.
Amount:
$250.00

Component Description:
RF Consultant fees for engineering part of main license modification to reduce ERP.
Amount:
$1,000.00
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Prepare and or review reimbursement form Information not provided.
Project management of the transition

Component Description:
Revised Invoice Date -- Project Management Services for January 2019
Amount:
$1,330.00

Component Description:
Revised Invoice Date -- Project Management Services for June 2019
Amount:
$3,360.00

Component Description:
Revise Invoice Date and move wire costs to building account. -- Project Management Services for July 2019
Amount:
$2,345.00

Component Description:
Revised Invoice Date -- Project Management Services for February 2019
Amount:
$1,960.00

Component Description:
Revised Invoice Date -- Project Management Services for August 2019
Amount:
$3,815.00

Component Description:
Revised Invoice Date -- Project Management Services for May 2019
Amount:
$3,220.00

Component Description:
Revised Invoice Date -- Project Management Services for April 2019
Amount:
$4,270.00

Component Description:
Project Management Services for October 2019
Amount:
$245.00

Component Description:
Revised Invoice Date -- Project Management Services for September 2019
Amount:
$1,190.00

Component Description:
Turner Invoice 576 FCC form 2100, Schedule 399 cost reimbursement submittal work.
Amount:
$3,255.00

Component Description:
Revised Invoice Date -- Project Management Services for March 2019
Amount:
$4,690.00

Component Description:
April invoice for Project management.
Amount:
$4,270.00
Legal Guidance for repack

Component Description:
1/2 of Wilkinson, Barker, Knauer, LLP invoice -- Legal guidance for Incentive Auction/Repack
Amount:
$321.50

Component Description:
WRAZ portion of Legal Guidance invoice from Wilkinson Barker Knauer LLP
Amount:
$1,776.50

Component Description:
WRAZ half of Legal Guidance invoice from Wilkinson Barker Knauer LLP
Amount:
$1,638.25

Component Description:
WRAZ half of Wilkinson, Barker, Knauer, LLP invoice -- Legal guidance for Incentive Auction/Repack
Amount:
$1,630.50

Component Description:
1/2 of Wilkinson, Barker, Knauer, LLP invoice -- Legal guidance for Incentive Auction/Repack
Amount:
$2,349.25

Component Description:
1/2 of Wilkinson, Barker, Knauer, LLP invoice -- Legal guidance for Incentive Auction/Repack
Amount:
$987.75

Component Description:
WRAZ portion of Wilkinson, Barker, Knauer, LLP invoice -- Legal guidance for Incentive Auction/Repack
Amount:
$2,626.00

Component Description:
1/2 of Wilkinson, Barker, Knauer, LLP invoice -- Legal guidance for Incentive Auction/Repack
Amount:
$286.50

Component Description:
WRAZ half of Legal Guidance invoice from Wilkinson Barker Knauer LLP
Amount:
$218.25

Component Description:
1/2 of Wilkinson, Barker, Knauer, LLP invoice -- Legal guidance for Incentive Auction/Repack
Amount:
$291.00
Additional Field Engineering Service, 3 Days

Component Description:
Final payment (15%) for Layout Site Survey.
Amount:
$975.00

Component Description:
Final payment (15%) for Site Survey by 2 ERI Climbers
Amount:
$975.00

Component Description:
85% initial payment - Layout Site Survey - 2 Certified ERI Climbers
Amount:
$5,525.00
RF Exposure Measurements Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application

Component Description:
02-24-2020 DLR Invoice 240967
Amount:
$1,000.00
Perform engineering study for new channel assignment and antenna development

Component Description:
02-24-2020 DLR Invoice 243400
Amount:
$1,000.00

Component Description:
02-24-2020 DLR Invoice 240823
Amount:
$2,250.00

Component Description:
02-24-2020 DLR Invoice 240340
Amount:
$750.00

Component Description:
02-24-2020 WRAZ portion of DLR Invoice 242522
Amount:
$125.00

Component Description:
02-24-2020 DLR Invoice 240826
Amount:
$250.00

Component Description:
02-24-2020 WRAZ portion of DLR Invoice 242392
Amount:
$375.00

Component Description:
02-24-2020 WRAZ portion of DLR Invoice 243550
Amount:
$250.00
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
02-24-2020 DLR Invoice 243549
Amount:
$250.00
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application

Component Description:
02-24-2020 DLR Invoice 243898
Amount:
$375.00

Component Description:
02-24-2020 DLR Invoice 243899
Amount:
$625.00

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $100,035.00 $92,185.00 N/A $11,677.15 N/A
Total for all systems $5,879,806.00 $5,659,518.00 N/A $4,829,494.36 N/A
Other Expenses $100,035.00 $92,185.00 $11,677.15
Facility remote control and monitoring modifications $4,836.00 $4,836.00 N/A $4,836.00 N/A
MVPD Notification of Channel Change $1,250.00 $1,250.00 N/A N/A N/A
Develop and air announcement of upcoming channel change $10,000.00 $10,000.00 N/A N/A N/A
Equipment Delivery and Handling Charges $13,104.00 $13,104.00 N/A $0.00 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $10,000.00 $10,000.00 N/A N/A N/A
Non-zoning permits $1,000.00 $1,000.00 N/A N/A N/A
Local Zoning $5,850.00 $5,850.00 Wake County, NC Commercial Building Permit For New Building Addition. $5,841.15 N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 N/A N/A N/A
Unexpected Site Modifications $1,000.00 $1,000.00 N/A $1,000.00 N/A
Sigma Transmitter and RF System removal $40,000.00 $40,000.00 Received formal quote for old WRAZ IOT transmitter removal from Chuck Britt & Associates totaling $40,000.00 N/A N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,070.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $3,750.00 N/A N/A N/A

Components

Actual Information Description File Name
Facility remote control and monitoring modifications

Component Description:
WRAZ requested reimbursement amount for NFB consulting invoice.
Amount:
$4,836.00
MVPD Notification of Channel Change Information not provided.
Develop and air announcement of upcoming channel change Information not provided.
Equipment Delivery and Handling Charges

Component Description:
Full payment of Freight Charges on Invoice WRAZ-1001A
Amount:
$13,103.83
Disposal Costs (for equipment and other waste, net of any salvage value) Information not provided.
Non-zoning permits Information not provided.
Local Zoning

Component Description:
WRAZ Portion of the Building Permit expenses for the new transmitter building addition.
Amount:
$5,841.15
FCC Filing Fees - Form 2100 license to cover application Information not provided.
Unexpected Site Modifications

Component Description:
WRAZ half of James River Building Company invoice 2005.
Amount:
$1,000.00
Sigma Transmitter and RF System removal Information not provided.
FCC Filing Fees - Form 2100 minor change CP application Information not provided.
DTV Medical Facility Notification Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $5,879,806.00 $5,659,518.00 $4,829,494.36

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Craig Stephen Turner

Project Engineer


05/18/2020

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Craig Stephen Turner

Project Engineer


05/18/2020

Attachments

Back to Top