Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
Holston Valley Broadcasting Corporation |
N. David Widener 222 Commerce Street Kingsport, TN 37660 United States |
+1 (423) 246-9578 | davidw@wtfm.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | tower and building is shared with these stations |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | Yes | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | TAU 2-5K00AA | |
Year | 2003 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1 kW |
Facility ID | Call Sign |
---|---|
27504 | WKPT-TV |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | EC702HP-BB | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.5 kW | |
Justification for New Transmitter | We need to keep our existing channel 36 signal on the air while we build out our new assigned channel 16. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Burk Arc Plus Touch V5 |
Upgrade of remote control system to be compatible with the new Comark transmitter |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Class A |
Mounting | Side Mount | |
Antenna position in stack | Middle | |
Polarization | Horizontal | |
Type | Other | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | 6 Parapanels | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | SCA-4DR4S | |
Year | 2003 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Class A |
Mounting | Side Mount | |
Antenna position in stack | Middle | |
Polarization | Horizontal | |
Type | Other | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | Parapanel | |
ERP: | 9.63 kW | |
Manufacturer | ||
Model | PSILP8-16 | |
Year | 2018 | |
Justification for New Antenna | We need a new antenna because they are channel specific and we are moving from 36 to 16. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 185 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 150 feet per run | |
Justification for New Transmission Line | We have to have a new antenna so we will need additional transmission line to keep both channels on air. The new location of the antenna and the transmitter will require additional length of line. |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Segment Length | N/A | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 310 feet per run | |
Justification for New Transmission Line | To serve the existing primary antenna when it is moved to a nearby rental tower for interim operation through the transition |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | Terrain Constrained | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1042697 | |
Coordinates (NAD83) | Latitude (NAD83) | 36° 25' 54.7" N- |
Longitude (NAD83) | 082° 08' 15.2" W- | |
Overall Structure Height | 228.02 feet | |
Support Structure Height | 174.21 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 4159.07 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | Nexstar Broadcasting, Inc. | |
Date Constructed | 02/26/2015 |
Facility ID | Call Sign | Service |
---|---|---|
57826 | WJHL-TV | DTV |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Terrain constrained |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Tower Lease |
Rent for 7 months use of tower for WAPK interim antenna |
Pipe to pipe clamps |
Clamps to mount existing antenna on Interim tower |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | Terrain Constrained | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1054538 | |
Coordinates (NAD83) | Latitude (NAD83) | 36° 25' 53.0" N- |
Longitude (NAD83) | 082° 08' 15.0" W- | |
Overall Structure Height | 225.72 feet | |
Support Structure Height | 169.29 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 4172.85 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | HOLSTON VALLEY BROADCASTING CORPORATION | |
Date Constructed | 10/01/1994 |
Facility ID | Call Sign | Service |
---|---|---|
27489 | WTFM | FM |
77676 | WAPW-CD | DTV |
27490 | WOPI-CD | DTV |
27504 | WKPT-TV | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Serious Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Terrain constrained |
Helicopter Services Required | Are helicopter services required? | Yes |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 8 | |
Explanation | To prepare and submit quarterly reports and special progress reports near the end of the phase | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | Yes | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Other Engineering Services |
Engineering services not included in any other Form 399 OPS section |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Electrical |
Electrical |
FCC License to Cover Filing Fee |
FCC License to Cover Filing Fee |
Site Earth Work |
Station states 'We may need our tower site graded to remove the ruts and sow grass. There is hardly any grass left since we were working thru winter, with backhoe burying the electrical line and the trucks have made the ground difficult to walk on now.' |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $205,487.26 | $83,828.13 | N/A | $83,828.12 | N/A |
Total for all systems | $2,269,186.63 | $498,207.93 | N/A | $427,079.38 | N/A |
Primary Transmitter EC702HP-BB | $205,487.26 | $83,828.13 | $83,828.12 | ||
Burk Arc Plus Touch V5 | $160.05 | $160.05 | The prior entry for remote control is locked. Adding this item to reflect the difference. The total amount for 50% of the remote control (shared between WAPK and WKPT) will total $3,201.02 by adding this amount of $160.05. | $160.04 | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $126,000.00 | $4,340.87 | Transmitter and Electrical Supplies | $4,340.87 | x |
UHF - Air Cooled Solid State Transmitter 0.85 kW | $76,286.24 | $76,286.24 | ***System Notice: Estimate adjusted and locked because line has been superseded.***new Comark quote for one-step up transmitter because the existing transmitter has more than 10 pct headroom. Increased estimate 11/22/18 to include sales tax | $76,286.24 | Sales Tax was added after the quote was accepted for the transmitter sale |
Remote Control Upgrade | $3,040.97 | $3,040.97 | ***System Notice: Estimate adjusted and locked because line has been superseded.***50 pct of the cost to upgrade the Burk remote control to be compatible with the new Comark transmitters. Increased to include shipping. See Invoice S10288-1. | $3,040.97 | The sub-total is equal to the Estimated Cost. |
Actual Information Description | File Name |
---|---|
Burk Arc Plus Touch V5 | |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | |
UHF - Air Cooled Solid State Transmitter 0.85 kW | |
Remote Control Upgrade |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $33,030.00 | $13,820.82 | N/A | $7,420.82 | N/A |
Total for all systems | $2,269,186.63 | $498,207.93 | N/A | $427,079.38 | N/A |
Primary Antenna PSILP8-16 | $33,030.00 | $13,820.82 | $7,420.82 | ||
UHF - Lower Power Side Mount, Class A One Station antenna -- basic | $26,300.00 | $7,420.82 | revised quote from PSI for new LP8 antenna. Price includes deliver. 3-14-19 added elbow for antenna connection. | $7,420.82 | Please note that the antenna make and model are the same on the quote and invoice (second line under description). |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
UHF - Lower Power Side Mount, Class A One Station antenna -- basic | |
Sweep test of existing antenna | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $11,040.00 | $9,494.28 | N/A | $9,403.88 | N/A |
Total for all systems | $2,269,186.63 | $498,207.93 | N/A | $427,079.38 | N/A |
Interim Transmission Line | $7,440.00 | $5,667.34 | $5,667.34 | ||
Flexible Foam Transmission Line - dielectric, 1 5/8" | $7,440.00 | $5,667.34 | N/A | $5,667.34 | x |
Primary Transmission Line | $3,600.00 | $3,826.94 | $3,736.54 | ||
Flexible Foam Transmission Line - dielectric, 1 5/8" | $3,600.00 | $3,826.94 | Total cost of TL includes $414.34 delivery, which will not be entered into the Other Expenses category. This has caused the total to slightly exceed the Predetermined Cost. | $3,736.54 | N/A |
Actual Information Description | File Name |
---|---|
Flexible Foam Transmission Line - dielectric, 1 5/8" | |
Flexible Foam Transmission Line - dielectric, 1 5/8" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,943,611.60 | $330,391.93 | N/A | $284,825.18 | N/A |
Total for all systems | $2,269,186.63 | $498,207.93 | N/A | $427,079.38 | N/A |
Primary Tower GTOWER | $438,011.60 | $33,907.92 | $15,685.67 | ||
Tower Lease | $16,666.66 | $16,666.66 | Rent for 7 months through Phase 2 for WAPK interim antenna | $8,444.41 | N/A |
Pipe to pipe clamps | $344.94 | $344.94 | N/A | $344.94 | N/A |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $16,896.32 | The Invoice herein and Quote is for hanging and then removing the WKPT, WAPK and WTFM temporary antennas on the WJHL adjacent tower to the permanent WKPT / WAPK / WTFM tower | $6,896.32 | N/A |
Primary Tower TOWER | $1,505,600.00 | $296,484.01 | $269,139.51 | ||
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $37,935.50 | N/A | $30,591.00 | N/A |
Structural engineering tower load study for well documented tower | $12,600.00 | $2,750.00 | SA for Interim Leased Tower shared between WAPK and WKPT | $2,750.00 | N/A |
Tower Helicopter Lift | $20,000.00 | $20,000.00 | The station states "We have an email from the FCC approving this." | N/A | N/A |
Serious tower reinforcement/modifications | $1,052,000.00 | $235,798.51 | See submitted Invoices & Quotes. | $235,798.51 | x |
Actual Information Description | File Name |
---|---|
Tower Lease | |
Pipe to pipe clamps | |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | |
Structural engineering tower load study for well documented tower | |
Tower Helicopter Lift | Information not provided. |
Serious tower reinforcement/modifications |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $50,344.00 | $43,299.00 | N/A | $29,805.33 | N/A |
Total for all systems | $2,269,186.63 | $498,207.93 | N/A | $427,079.38 | N/A |
Outside Professional Services | $50,344.00 | $43,299.00 | $29,805.33 | ||
Prepare and or review reimbursement form | $2,630.00 | $10,182.00 | The cost estimate includes Form 399 submissions including ongoing Actual Cost invoice prep and submission by KGA, and amendments as needed. | $10,182.00 | N/A |
Other Engineering Services | $16,790.00 | $16,790.00 | Engineering services not included in any other OPS section | $11,790.00 | add |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | $2,105.00 | $275.00 | N/A | $183.33 | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $1,500.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $3,585.00 | N/A | $550.00 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $1,000.00 | N/A | $350.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $3,750.00 | See attached invoices and quotes (if applicable). | $3,150.00 | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $1,535.00 | See attached / uploaded PDF file titled "KGA 964-06 v191223jgv1.pdf" | $0.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,000.00 | N/A | $300.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $2,000.00 | N/A | $1,950.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $0.00 | included in CP application costs | N/A | N/A |
Project management of the transition | $1,264.00 | $1,682.00 | It will be necessary to schedule and coordinate multiple vendors, complete progress reports, and update Schedule 399s. Station does not have available personnel or personnel trained in project management for such complex projects. | $1,350.00 | N/A |
Actual Information Description | File Name |
---|---|
Prepare and or review reimbursement form | |
Other Engineering Services | |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | |
ASR modification (prepare FCC Form 854) | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | Information not provided. |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $25,673.77 | $17,373.77 | N/A | $11,796.05 | N/A |
Total for all systems | $2,269,186.63 | $498,207.93 | N/A | $427,079.38 | N/A |
Other Expenses | $25,673.77 | $17,373.77 | $11,796.05 | ||
Site Earth Work | $5,000.00 | $5,000.00 | Station states 'We may need our tower site graded to remove the ruts and sow grass. There is hardly any grass left since we were working thru winter, with backhoe burying the electrical line and the trucks have made the ground difficult to walk on now.' | N/A | N/A |
FCC License to Cover Filing Fee | $335.00 | $335.00 | FCC License to Cover Filing Fee | $335.00 | N/A |
Electrical | $5,098.77 | $5,098.77 | This expense is for electrical work. | $5,098.77 | N/A |
MVPD Notification of Channel Change | $2,190.00 | $2,190.00 | The station needed to re-send its MVPD notifications to specify the actual Transition date instead of just "Phase 2". | $2,190.00 | N/A |
Develop and air announcement of upcoming channel change | $0.00 | $0.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $1,000.00 | $1,000.00 | N/A | $823.83 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $500.00 | $500.00 | Estimate is to cover rental truck, rental truck fuel and landfill fee for disposal of old station equipment replaced by new Repack equipment. | $268.45 | N/A |
DTV Medical Facility Notification | $11,550.00 | $3,250.00 | N/A | $3,080.00 | N/A |
Actual Information Description | File Name |
---|---|
Site Earth Work | Information not provided. |
FCC License to Cover Filing Fee | |
Electrical | |
MVPD Notification of Channel Change | |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
DTV Medical Facility Notification |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $2,269,186.63 | $498,207.93 | $427,079.38 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jeffrey C Gehman Engineering Associate 05/07/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jeffrey C Gehman Engineering Associate 05/07/2020 |