FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
32326
Service:
DTV
Call Sign:
WCNC-TV
Channel:
24 (UHF)
File Number:
0000028031
FRN:
0003594918
Date Submitted:
04/09/2020

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

WCNC-TV, INC.

TEGNA, Inc.

8350 Broad Street, Suite 2000

Tysons, VA 22102

United States

+1 (703) 873-6600 LAWDEPT@TEGNA.com Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Gary Davis

Regional Head of Technology and Operations

TEGNA

Gary Davis

8350 Broad Street

Suite 2000

Tysons, VA 22102

United States

+1 (404) 873-9199 gadavis@tegna.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan WCNC will be moving from channel 22 to channel 24. This will require a new antenna, transmission line and transmitter. An interim facility will be required while these modifications take place and throughout assigned phase.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model CD3200 P2 Sigma
Year 2003
Type Inductive Output Tube
IOT Power Type Two
Power Capacity 50 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model ULXTE-72
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 47.2 kW
Justification for New Transmitter Station has in excess of 10% TPO headroom and is eligible for a 1-Step-Up Allowance. Reimbursable TPO is 36.0 kW based on initial 90-day filing CP. This would require a ULXTE-60. A 1-Step-Up is the ULXTE-72 and is therefore reimbursable.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring Yes
Size 3 inches
Length 100.0 feet
Other Electrical Service Yes
Description Additional electrical services required for transmitter installation, including heat exchangers, transformers, cooling pumps, etc.
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 10 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 100.0 square feet
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 791.0 kW
Manufacturer
Model TFU-22DSC-R C170
Year 2017

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 828.0 kW
Manufacturer
Model TFU-24JTH-R 4C170 (SP)
Year 2018
Justification for New Antenna Station's licensed top-mount antenna cannot be re-tuned and must be replaced for new channel assignment.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 7 3/16 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

New Top Plate

Existing top-plate and/or bolt pattern may not work for new top-mount antenna

Shipping

$6,800

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Broadband Slot
Number of Stations Supported 24
Number of Panels/Bays 24
Lower Limit 518.00 MHz
Upper Limit 524.00 MHz
Design power capacity in use 100.0 %
Other Antenna Type N/A
ERP: 791.0 kW
Manufacturer
Model TFU-16WB C160
Year 2018
Justification for New Antenna An interim antenna is necessary to keep station on air during primary antenna replacement & for duration of assigned phase. TFU-24WB cost is equivalent to a single-channel slot interim antenna. A TFU-24WB is required to replicate existing coverage.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? B
Feed Line Size 6 1/8 inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Shipping

$5,400

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Utilize Existing
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer Dielectric
Type Rigid
Diameter 7 3/16 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 2100 feet per run

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

TLSCRs

TLSCRs

TX Line Sweep

Sweep required to verify post-transition channel measures well on existing line.

Misc Parts

Misc Parts

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Rigid
Diameter 6 1/8 inches
Segment Length 20'
Other Segment Length
Number of parallel runs 1
Length 1870 feet per run
Justification for New Transmission Line Interim transmission line is necessary to keep station on air during primary antenna replacement & for duration of assigned phase. 6-1/8" rigid line is required to provide required power rating for replication ERP.

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

TX Line Sweep

Sweep required to verify post-transition channel measures well on existing line.

Misc Parts

Misc Parts: Dielectric inv MAN01283 items 7 24 25 26 27 28 29 30 31 32 & 33

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? No
One or more FM, AM or TV radio broadcaster(s) N/A
Others Types of Users N/A
Is tower documented for structural analysis? No
Is tower compliant with Rev G? Yes
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1001294
Coordinates (NAD83) Latitude (NAD83) 35° 20' 49.4" N-
Longitude (NAD83) 081° 10' 14.2" W-
Overall Structure Height 1968.48 feet
Support Structure Height 1915.99 feet
Ground Elevation Above Mean Sea Level (AMSL) 786.08 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner WCNC-TV, Inc
Date Constructed 08/27/1992


Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for undocumented/poorly documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Major Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Information not provided.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 845
Explanation Fewer PM tasks are needed & OES & 399 work are needed, so the PM total has been reduced to $150x845hrs($126750), a new OES component has been created & funded with part of the $ removed from PM,& "Prepare & or review reimbursement form" has been increased
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 2
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 2
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification Yes
FAA Consultation (including preparation of FAA Form 7460) Yes
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements Yes
Additional Field Engineering Service Yes
Number of Days 20
Justification $2,500 per site visit including expenses x 20 days. It is necessary to survey the site, plan the equipment, develop specifications for purchasing, & oversee multiple vendor RF projects. Station does not have available personnel trained in such services.

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Other Legal Services

Other Legal Services related to the DTV Repack

Pre filing site review

Outside engineering fir review of each facility

Other Engineering Services

Other Engineering Services related to the DTV Repack

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning Yes
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Generator Load Bank test

Generator Load Bank test

Internal labor

Local and Corporate labor

Transmission Line Installation

Transmission Line Installation

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,582,314.50 $1,557,744.47 N/A $1,536,406.50 N/A
Total for all systems $3,769,516.54 $4,193,788.30 N/A $3,340,052.54 N/A
Primary Transmitter ULXTE-72 $1,582,314.50 $1,557,744.47 $1,536,406.50
Other Electrical Service: Additional electrical services required for transmitter installation, including heat exchangers, transformers, cooling pumps, etc. $40,214.50 $40,214.50 Additional electrical services required for transmitter installation, including heat exchangers, transformers, cooling pumps, etc. $33,083.60 N/A
10 Ton system $38,900.00 $39,877.00 The station obtained the quote included in the attached file titled "WCNC HVAC Justification Letter.pdf" $39,877.00 N/A
3" Rigid Conduit and Wiring (Cost per foot) $5,200.00 $4,900.00 N/A N/A N/A
Other -- Building Addition Size: 100.0 $25,000.00 $25,000.00 New pad required for heat exchangers, transformers, pumps, etc. Equipment must also be shielded. $15,692.93 N/A
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW $1,473,000.00 $1,447,752.97 See attached/uploaded PDF file titled "Gates JW30004447-4 v191121jgv1.pdf" $1,447,752.97 N/A

Components

Actual Information Description File Name
Other Electrical Service: Additional electrical services required for transmitter installation, including heat exchangers, transformers, cooling pumps, etc.

Component Description:
Crystal 19474257 061619 v190912pmv1
Amount:
$442.60

Component Description:
Watson 84284 v191028pmv1
Amount:
$8,120.74

Component Description:
Power Gen 1667 v190927jgv1
Amount:
$4,696.76

Component Description:
Watson 84182 v190910pmv1
Amount:
$19,486.00

Component Description:
NFB 20190801 v200408pmv2
Amount:
$2,034.65

Component Description:
Watson 84347 v200214pmv1
Amount:
$337.50
10 Ton system

Component Description:
STRMECH 920009019 v200210pmv1
Amount:
$39,877.00
3" Rigid Conduit and Wiring (Cost per foot) Information not provided.
Other -- Building Addition Size: 100.0

Component Description:
Osborn 32963 v190613pmv1
Amount:
$8,228.00

Component Description:
Osborn 32118R v190709jgv1
Amount:
$2,935.92

Component Description:
Osborn 33408 v190906jgv1
Amount:
$10.70

Component Description:
Simon 416588 v200114pmv1
Amount:
$6,950.63

Component Description:
Airgas 9089851042 v190821pmv1
Amount:
$467.40

Component Description:
Osborn 32617 v190507jgv1
Amount:
$3,849.28

Component Description:
Airgas 9087280107 v190821pmv1
Amount:
$201.63
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW

Component Description:
Gates inv #JW30004447-1A Primary Transmitter pmt 2 UL20190327jgv2
Amount:
$222,368.29

Component Description:
Gates JW30004447-3 v190829pmv1
Amount:
$675,202.74

Component Description:
Inv JW30004447-1 WCNC Primary Transmitter 1 3rd dp UL20180719jg v1
Amount:
$444,736.57

Component Description:
Gates JW30004447-4 v191121jgv1
Amount:
$105,445.37

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $464,720.24 $402,801.29 N/A $337,326.49 N/A
Total for all systems $3,769,516.54 $4,193,788.30 N/A $3,340,052.54 N/A
Interim Antenna TFU-16WB C160 $165,290.24 $152,063.24 $122,263.24
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $5,000.00 Per Widelity estimate N/A N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $11,213.00 N/A $11,213.00 N/A
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) $13,700.00 $13,000.00 N/A N/A N/A
Sweep test of existing antenna $6,730.00 $6,400.00 Per Dielectric N/A N/A
Shipping $5,400.00 $5,400.00 N/A N/A N/A
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 791 kW input, directional,, horizontally polarized $111,050.24 $111,050.24 N/A $111,050.24 N/A
Primary Antenna TFU-24JTH-R 4C170 (SP) $299,430.00 $250,738.05 $215,063.25
Shipping $6,800.00 $6,800.00 N/A N/A N/A
New Top Plate $25,000.00 $25,000.00 Existing top-plate and/or bolt pattern may not work for new top-mount antenna $13,885.00 N/A
Elbow complex, single channel, at antenna input, per 7 3/16. feedline (if needed) $13,900.00 $8,055.00 Per Dielectric $8,055.00 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 Per Dielectric $6,400.00 N/A
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized $247,000.00 $204,483.05 See attached Dielectric quotes and invoices and invoices and quotes from other vendors. $186,723.25 N/A

Components

Actual Information Description File Name
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) Information not provided.
Side mount brackets for high power antennas (if not included in antenna base cost)

Component Description:
Die 588010 v190906pmv1
Amount:
$1,121.30

Component Description:
Die MAN01284 v190719pmv1
Amount:
$5,045.85

Component Description:
Die MAN01283 v190719pmv1
Amount:
$5,045.85
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) Information not provided.
Sweep test of existing antenna Information not provided.
Shipping Information not provided.
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 791 kW input, directional,, horizontally polarized

Component Description:
Die 568007 v190813pmv1
Amount:
$10,192.50

Component Description:
Die MAN01284 v190719pmv1
Amount:
$45,866.25

Component Description:
Die MAN01283 v190719pmv1
Amount:
$45,866.25

Component Description:
On Site 24395 v200113pmv1
Amount:
$2,598.00

Component Description:
On Site inv #24540 Nitro generator Interim Ant UL20190314jgv1
Amount:
$6,527.24
Shipping Information not provided.
New Top Plate

Component Description:
Die 564001 v191220pmv3
Amount:
$7,636.75

Component Description:
Die MAN01248 v190809pmv1
Amount:
$6,248.25

Component Description:
Die 554004 v191113jgv2
Amount:
N/A
Elbow complex, single channel, at antenna input, per 7 3/16. feedline (if needed)

Component Description:
Die 564001 v191220pmv3
Amount:
$805.50

Component Description:
Die MAN01248 v190809pmv1
Amount:
$3,624.75

Component Description:
Die MAN00846 v190809pmv1
Amount:
$3,624.75
Sweep test of existing antenna

Component Description:
Die MAN00846 v190809pmv1
Amount:
$2,880.00

Component Description:
Die MAN01248 v190809pmv1
Amount:
$2,880.00

Component Description:
Die 613055 v191011pmv1
Amount:
$640.00
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized

Component Description:
Die 564001 v191220pmv3
Amount:
$17,759.80

Component Description:
Die MAN00846 v190809pmv1
Amount:
$79,919.10

Component Description:
Die MAN01248 v190809pmv1
Amount:
$79,919.10

Component Description:
On Site inv #24540 Nitro generator Prim Ant UL20190314jgv1
Amount:
$6,527.25

Component Description:
Die 554004 v191113jgv2
Amount:
N/A

Component Description:
FDH E-190667 v200113pmv1
Amount:
$175,087.50

Component Description:
FDH E-190994 v200113pmv1
Amount:
$350,175.00

Component Description:
On Site 24395 v200113pmv1
Amount:
$2,598.00

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $511,767.94 $399,161.68 N/A $399,161.68 N/A
Total for all systems $3,769,516.54 $4,193,788.30 N/A $3,340,052.54 N/A
Interim Transmission Line $457,302.19 $344,695.93 $344,695.93
Rigid Transmission Line - copper, 6 1/8" $377,740.00 $265,133.74 N/A $265,133.74 N/A
TX Line Sweep $6,400.00 $6,400.00 N/A $6,400.00 N/A
Misc Parts $73,162.19 $73,162.19 Misc Parts: Dielectric inv MAN01283 items 7 24 25 26 27 28 29 30 31 32 & 33 $73,162.19 N/A
Primary Transmission Line $54,465.75 $54,465.75 $54,465.75
Misc Parts $34,030.75 $34,030.75 N/A $34,030.75 N/A
TX Line Sweep $6,500.00 $6,500.00 N/A $6,500.00 N/A
TLSCRs $13,935.00 $13,935.00 TLSCRs for the patch panel $13,935.00 N/A

Components

Actual Information Description File Name
Rigid Transmission Line - copper, 6 1/8"

Component Description:
Die 585008 v190906pmv1
Amount:
$171.84

Component Description:
Die 600026 v200127pmv1
Amount:
$0.01

Component Description:
Die MAN01284 v190719pmv1
Amount:
$119,232.85

Component Description:
Die 563032 v190805pmv1
Amount:
$26,496.19

Component Description:
Die MAN01283 v190719pmv1
Amount:
$119,232.85
TX Line Sweep

Component Description:
Die 600026 v200127pmv1
Amount:
$640.00

Component Description:
Die MAN01284 v190719pmv1
Amount:
$2,880.00

Component Description:
Die MAN01283 v190719pmv1
Amount:
$2,880.00
Misc Parts

Component Description:
Die 589009 v200127pmv1
Amount:
$343.70

Component Description:
Die 584002 v200106pmv1
Amount:
$4,587.00

Component Description:
Die 587043 v190906pmv1
Amount:
$343.70

Component Description:
Die 585008 v190906pmv1
Amount:
$2,142.30

Component Description:
Die 600026 v200127pmv1
Amount:
$540.40

Component Description:
Die 600026 v200127pmv1
Amount:
$176.40

Component Description:
Die 600026 v200127pmv1
Amount:
$3,647.70

Component Description:
Die MAN01284 v190719pmv1
Amount:
$27,453.17

Component Description:
Die 592044 v200127pmv1
Amount:
$1,950.00

Component Description:
Die MAN01283 v190719pmv1
Amount:
$27,453.17

Component Description:
Die 563032 v190805pmv1
Amount:
$4,524.65
Misc Parts

Component Description:
Die 564001 v191220pmv3
Amount:
$24,588.75

Component Description:
Die 600028 v191030pmv2
Amount:
$3,260.00

Component Description:
Die 584002 v200106pmv1
Amount:
$6,182.00
TX Line Sweep

Component Description:
RF Analy 1452 v190829pmv1
Amount:
$6,500.00
TLSCRs

Component Description:
Die 564001 v191220pmv3
Amount:
$447.00

Component Description:
Die 600028 v191030pmv2
Amount:
$5,655.00

Component Description:
Die 600028 v191030pmv2
Amount:
$223.50

Component Description:
Die 607020 v191011pmv1
Amount:
$1,575.00

Component Description:
Die MAN01248 v190809pmv1
Amount:
$3,017.25

Component Description:
Die MAN00846 v190809pmv1
Amount:
$3,017.25

Component Description:
Die 585022 v191113jgv3
Amount:
N/A

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $657,800.00 $1,273,409.00 N/A $888,732.50 N/A
Total for all systems $3,769,516.54 $4,193,788.30 N/A $3,340,052.54 N/A
Primary Tower TOWER $657,800.00 $1,273,409.00 $888,732.50
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study $26,300.00 $25,000.00 N/A $16,880.00 N/A
Major tower reinforcement/modifications $421,000.00 $400,000.00 N/A $26,305.00 N/A
Tall Tower (greater than 500') $210,500.00 $848,409.00 See attached / uploaded PDF files titled "FDH E-191655 v200204jgv1.pdf", "FDH E-190667 v200205jgv2.pdf" and other invoices / quotes submitted to this Component. $845,547.50 N/A

Components

Actual Information Description File Name
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study

Component Description:
TCI inv #8079 Struct Analysis UL20190313jgv1
Amount:
$8,620.00

Component Description:
TCI inv #8626 Feasibility Structural Analysis UL20190313jgv1
Amount:
$8,260.00
Major tower reinforcement/modifications

Component Description:
FDH E-173410 v191007pmv1
Amount:
$13,152.50

Component Description:
FDH E-178900 v191007pmv1
Amount:
$13,152.50

Component Description:
FDH E-190994 v200113pmv1
Amount:
$27,482.40

Component Description:
FDH E-190667 v200113pmv1
Amount:
$13,741.20
Tall Tower (greater than 500')

Component Description:
Haas 19CNC-1 v200114pmv1
Amount:
$7,598.00

Component Description:
Haas 19CNC-4 v190808jgv1
Amount:
$1,023.38

Component Description:
FDH E-191655 v200204jgv1
Amount:
$62,942.90

Component Description:
FDH E-190667 v200205jgv2
Amount:
$188,828.70

Component Description:
FDH E-190994 v200205jgv2
Amount:
$377,657.40

Component Description:
FDH E-162564 v190802jgv1
Amount:
$18,176.00

Component Description:
Haas 19CNC-8 v200114pmv1
Amount:
$1,589.00

Component Description:
Haas 18CNC-1 v200114pmv1
Amount:
$1,272.50

Component Description:
FDH E-162634 v190528jgv2
Amount:
$94,490.00

Component Description:
Haas 19CNC-6 v200114pmv1
Amount:
$341.12

Component Description:
FDH E-162563 v190528jgv2
Amount:
$94,490.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $374,410.00 $382,733.00 N/A $83,687.96 N/A
Total for all systems $3,769,516.54 $4,193,788.30 N/A $3,340,052.54 N/A
Outside Professional Services $374,410.00 $382,733.00 $83,687.96
Other Engineering Services $12,000.00 $12,000.00 Fewer PM tasks are needed & OES & 399 work are needed, so the PM total has been reduced to $150x845hrs($126750), a new OES component has been created & funded with part of the $ removed from PM,& "Prepare & or review reimbursement form" has been increased $11,110.00 N/A
Additional Field Engineering Service, 20 Days $50,000.00 $50,000.00 $2,500 per site visit including expenses x 20 days. It is necessary to survey the site, plan the equipment, develop specifications for purchasing, & oversee multiple vendor RF projects. Station does not have available personnel trained in such services. N/A N/A
RF Exposure Measurements $21,050.00 $20,000.00 Per Widelity estimate N/A N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $80,000.00 Per Widelity Estimate N/A N/A
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase $2,105.00 $2,000.00 N/A N/A N/A
ASR modification (prepare FCC Form 854) $2,105.00 $2,000.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $7,360.00 $7,000.00 Per Widelity estimate N/A N/A
Prepare request for Special Temporary Authorization $4,100.00 $3,000.00 Per Widelity estimate $1,500.00 N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 per Widelity estimate $675.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 Per Widelity estimate $2,650.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 Per Widelity estimate N/A N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A
Project management of the transition $133,510.00 $126,750.00 Fewer PM tasks are needed & OES & 399 work are needed, so the PM total has been reduced to $150x845hrs($126750), a new OES component has been created & funded with part of the $ removed from PM,& "Prepare & or review reimbursement form" has been increased $44,777.12 N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 Per Widelity estimate $0.00 N/A
Prepare and or review reimbursement form $2,630.00 $25,733.00 The cost estimate includes the initial 399 amendment, anticipated subsequent 399 amendments, and ongoing Actual Cost invoice prep and submission by KGA. $22,248.00 N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 per Widelity estimate N/A N/A
Other Legal Services $10,000.00 $10,000.00 Other Legal Services related to the DTV Repack $727.84 N/A
Pre filing site review $23,000.00 $23,000.00 N/A N/A N/A

Components

Actual Information Description File Name
Other Engineering Services

Component Description:
Osborn 35808 v200214jgv1
Amount:
$9,347.50

Component Description:
Osborn inv #29835 Other Eng Srvcs UL20190325jgv1
Amount:
$1,762.50
Additional Field Engineering Service, 20 Days Information not provided.
RF Exposure Measurements Information not provided.
Comprehensive coverage verification via field study, if needed Information not provided.
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase Information not provided.
ASR modification (prepare FCC Form 854) Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Prepare request for Special Temporary Authorization

Component Description:
Osborn 35808 v200214jgv1
Amount:
$1,500.00
Prepare engineering section of FCC Form 2100 (main), License to Cover Application

Component Description:
Osborn 35808 v200214jgv1
Amount:
$675.00
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Osborn 32199 v200214jgv1
Amount:
$2,650.00
Perform engineering study for new channel assignment and antenna development Information not provided.
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Project management of the transition

Component Description:
WCNC CM-11-12-2019-WCNC-TV v191112jgv1
Amount:
($687.50)

Component Description:
Osborn 33664 v191112jgv3
Amount:
$1,275.00

Component Description:
Osborn 32825 v190613pmv1
Amount:
$1,800.60

Component Description:
Osborn 34999 v200214jgv1
Amount:
$2,291.00

Component Description:
Osborn 31787 v200214jgv1
Amount:
$975.00

Component Description:
Osborn 34579R PM v191023jgv1
Amount:
$2,400.00

Component Description:
Osborn 31606 v200214jgv1
Amount:
$1,875.00

Component Description:
Osborn 31131 v200214jgv1
Amount:
$1,650.00

Component Description:
Osborn 30481 v200214jgv1
Amount:
$1,425.00

Component Description:
Osborn 35394 v200214jgv1
Amount:
$829.50

Component Description:
Osborn 36185 v200214jgv1
Amount:
$6,027.50

Component Description:
Osborn 30683 v200214jgv1
Amount:
$750.00

Component Description:
Osborn 30003 v200214jgv1
Amount:
$900.00

Component Description:
Inv 29208 WCNC Proj Mgt 180428-180525 UL20180706jg v1
Amount:
$1,950.00

Component Description:
Osborn inv #28582 Proj mgt thru 180330 UL20190325jgv1
Amount:
$600.00

Component Description:
Osborn inv #28992 Proj mgt 180331-180427 UL20190325jgv1
Amount:
$1,725.00

Component Description:
Osborn inv #26021 Prof srvcs 170605 - 170728 UL20181107jg v1
Amount:
$18,893.43

Component Description:
Osborn 33664 v190716jgv2
Amount:
$1,350.00

Component Description:
Osborn inv #29835 Proj mgt 180526-180629 UL20190325jgv1
Amount:
$2,137.50

Component Description:
Osborn 36536 v200214jgv1
Amount:
$948.00

Component Description:
Osborn 32966 v190617pmv1
Amount:
$1,800.00

Component Description:
Osborn 32199 v200214jgv1
Amount:
$1,650.00

Component Description:
Osborn 35808 v200214jgv1
Amount:
$339.59
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Prepare and or review reimbursement form

Component Description:
Osborn inv #28992 Amend 399 Form UL20190325jgv1
Amount:
$3,200.00

Component Description:
Osborn 34999 v200214jgv1
Amount:
$910.00

Component Description:
Osborn 34579R PRRF v191023jgv1
Amount:
$2,058.00

Component Description:
Osborn 31131 v200214jgv1
Amount:
$250.00

Component Description:
Osborn 35394 v200214jgv1
Amount:
$2,280.00

Component Description:
Osborn 36185 v200214jgv1
Amount:
$3,485.00

Component Description:
Osborn 32199 v200214jgv1
Amount:
$425.00

Component Description:
Osborn 32966 v190617pmv1
Amount:
$325.00

Component Description:
Osborn 30003 v200214jgv1
Amount:
$947.50

Component Description:
Osborn 33664 v190618pmv1
Amount:
$687.50

Component Description:
Osborn 36536 v200214jgv1
Amount:
$6,400.00

Component Description:
Osborn 35808 v200214jgv1
Amount:
$4,765.00
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Other Legal Services

Component Description:
Covington 60801029 v190712jgv2
Amount:
$448.46

Component Description:
Covington 60801032 v190715jgv2
Amount:
$70.43

Component Description:
Covington 60801032 v190528jgv2
Amount:
$70.43

Component Description:
Covington inv #60796723 Various Legal UL20181024jgv1
Amount:
$174.42

Component Description:
Covington 60805585 v190513pmv1
Amount:
$34.53

Component Description:
Covington 60801029 v190513pmv1
Amount:
$468.19
Pre filing site review Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $178,503.86 $177,938.86 N/A $94,737.41 N/A
Total for all systems $3,769,516.54 $4,193,788.30 N/A $3,340,052.54 N/A
Other Expenses $178,503.86 $177,938.86 $94,737.41
Internal labor $23,405.00 $23,405.00 N/A N/A N/A
Equipment Storage $20,000.00 $20,000.00 6 months at $240 per week for antenna and and line on 2 flat bed storage. 10K each $7,420.30 N/A
Non-zoning permits $25,000.00 $25,000.00 N/A N/A N/A
Local Zoning $500.00 $500.00 Local permitting estimate N/A N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $190.00 Per Widelity Estimate N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 Per Widelity Estimate N/A N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 Per Widelity estimate $3,275.00 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $27,050.00 $27,050.00 See attached / uploaded PDF files titled "Qcomms QC19-179 v191213jgv1.pdf" and "Qcomms QC19-180 v191216jgv1.pdf" $27,050.00 N/A
Develop and air announcement of upcoming channel change $6,000.00 $6,000.00 150 per hour t for 40 hours to write, shoot and produce audience information. $3,270.00 N/A
MVPD Notification of Channel Change $6,000.00 $6,000.00 Hire third party to notify all MVPD's of upcoming changes. N/A N/A
Generator Load Bank test $4,696.75 $4,696.75 Generator Load Bank test estimate. See the uploaded file titled Gen Load Bank test estimate UL20190412jgv1.pdf N/A N/A
Transmission Line Installation $3,500.00 $3,500.00 N/A $3,500.00 N/A
Equipment Delivery and Handling Charges $50,272.11 $50,272.11 See attached invoices and quotes where applicable. $50,222.11 N/A

Components

Actual Information Description File Name
Internal labor Information not provided.
Equipment Storage

Component Description:
321 Eq Co inv #001 0412507 T Container rental UL20190318jgv1
Amount:
$1,637.10

Component Description:
321 Eq Co 111520 v190821pmv1
Amount:
$353.10

Component Description:
321 Eq Co 112273 v190826pmv1
Amount:
$353.10

Component Description:
321 Eq Co 111111 v190821pmv1
Amount:
$353.10

Component Description:
321 Eq Co 113362 v200113pmv1
Amount:
$117.70

Component Description:
321 Eq Co 112639 v190826pmv1
Amount:
$353.10

Component Description:
Die 616011 v191227pmv1
Amount:
$3,900.00

Component Description:
321 Eq Co 111888 v190826pmv1
Amount:
$353.10
Non-zoning permits Information not provided.
Local Zoning Information not provided.
FCC Filing Fees - Special Temporary Authorization request Information not provided.
FCC Filing Fees - Form 2100 license to cover application Information not provided.
DTV Medical Facility Notification

Component Description:
RF Notif 1189 v190903pmv1
Amount:
$3,275.00
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
Qcomms QC19-179 v191213jgv1
Amount:
$23,000.00

Component Description:
Qcomms QC19-180 v191216jgv1
Amount:
$2,900.00

Component Description:
Ace 153 v190919pmv1
Amount:
$1,150.00
Develop and air announcement of upcoming channel change

Component Description:
2C Media inv #203806 Creation of channel change announcement UL20181016jgv1
Amount:
$3,270.00
MVPD Notification of Channel Change Information not provided.
Generator Load Bank test Information not provided.
Transmission Line Installation

Component Description:
Albert 4560 v190906jgv1
Amount:
$3,500.00
Equipment Delivery and Handling Charges

Component Description:
Die 589009 v200127pmv1
Amount:
$7,671.93

Component Description:
Die 588010 v190906pmv1
Amount:
$3,092.33

Component Description:
Sunbelt 90134420-0001 v191001pmv1
Amount:
$228.50

Component Description:
Die 564001 v191220pmv3
Amount:
$1,883.21

Component Description:
Sunbelt 86797948-0001 v190821pmv1
Amount:
$768.65

Component Description:
Die 591053 v200127pmv1
Amount:
$3,539.27

Component Description:
Sunbelt 86797948-0003 v190821pmv1
Amount:
$496.76

Component Description:
Sunbelt 86797948-0004 v190821pmv1
Amount:
$496.76

Component Description:
Sunbelt 86797948-0007 v200113pmv1
Amount:
$496.76

Component Description:
Sunbelt 86797948-0010 v200408pmv1
Amount:
$496.76

Component Description:
Die 584002 v200106pmv1
Amount:
$2,566.70

Component Description:
Die 587036 v190906pmv1
Amount:
$3,075.98

Component Description:
Die 594013 v200127pmv1
Amount:
$1,453.64

Component Description:
Die 601026 v191011pmv1
Amount:
$4,900.49

Component Description:
Die 597017 v191014pmv1
Amount:
$1,286.36

Component Description:
Die 607020 v191011pmv1
Amount:
$985.32

Component Description:
Die 600026 v200127pmv1
Amount:
$1,070.44

Component Description:
Die 608012 v191011pmv1
Amount:
$422.43

Component Description:
Sunbelt 86797948-0005 v191001pmv1
Amount:
$496.76

Component Description:
Sunbelt 86797948-0009 v200408pmv1
Amount:
$496.76

Component Description:
Sunbelt 86797948-0011 v200408pmv1
Amount:
$496.76

Component Description:
Sunbelt 86797948-0012 v200408pmv1
Amount:
$496.76

Component Description:
Die 616011 v191227pmv1
Amount:
$11,812.50

Component Description:
Sunbelt 86797948-0008 v200113pmv1
Amount:
$496.76

Component Description:
NFB 20190801 v200408pmv2
Amount:
$50.00

Component Description:
Die 585022 V191011pmv2
Amount:
$1,883.21

Component Description:
Sunbelt 86797948-0002 v190821pmv1
Amount:
$496.76

Component Description:
Sunbelt 86797948-0006 v190911pmv1
Amount:
$496.76

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $3,769,516.54 $4,193,788.30 $3,340,052.54

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Jeffrey C Gehman

Engineering Associate


04/09/2020

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Jeffrey C Gehman

Engineering Associate


04/09/2020