Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
UNIVERSITY BROADCASTING, INC. Doing Business As: KGEB |
Bill Lee 7777 SOUTH LEWIS AVENUE TULSA, OK 74171 United States |
+1 (918) 488-5300 | blee@oru.edu | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Joseph C. Chautin III Hardy, Carey, Chautin & Balkin |
1080 West Causeway Approach Mandeville, LA 70471 United States |
+1 (985) 629-0777 | jchautin@hardycarey.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | Remove old Analog ant., waveguide, TX, strobe light from Analog antenna, replace with new VHF Antenna ,Strobe light, and TX line. Remove old Analog TX, plate supply, BP filter; set new VHF Transmitter, TX Room only shared with KWHB- Separate UHF-antenna. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | NV-7250 | |
Year | 2002 | |
Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power Capacity | 3.45 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | THV9 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 3.9 kW | |
Justification for New Transmitter | Cannot re-tune Rohde & Schwarz UHF Transmitter to VHF. Can't build out on 14 due to Land Mobile issues, so FCC granted CP Mod on Ch. 12 instead. Current Rohde & Schwarz UHF Transmitter is no longer supported. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 50.0 kW | |
Manufacturer | ||
Model | SWEDT160M/49 | |
Year | 2002 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 75.0 kW | |
Manufacturer | ||
Model | THV-7A12-R O4 | |
Year | 2018 | |
Justification for New Antenna | Can't re-tune UHF Channel 49 antenna to VHF Channel 12. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Mounting bracket for top mount antenna |
Top Mount antenna needs a bracket to mount the antenna to a 4 foot thick concrete & steel shear wall. |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmission currently shared with any other stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Air | |
Diameter | 1 5/8 inches | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 75 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Air | |
Diameter | 3 inches | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 200 feet per run | |
Justification for New Transmission Line | Can't use existing line as it will be in use during testing time, as well as not in the location needed to mount the VHF Ch. 12 antenna. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | Located on Building | |
Is this tower currently shared with any other stations? | No | |
One or more FM, AM or TV radio broadcaster(s) | N/A | |
Others Types of Users | N/A | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1013337 | |
Coordinates (NAD83) | Latitude (NAD83) | 36° 02' 35.0" N- |
Longitude (NAD83) | 095° 57' 12.0" W- | |
Overall Structure Height | 699.14 feet | |
Support Structure Height | 662.07 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 623.68 feet | |
Structure Type | BANT - Building with an Antenna | |
Tower Owner | ORAL ROBERTS UNIVERSITY | |
Date Constructed | 08/01/1995 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | No study needed |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Located on Building |
Helicopter Services Required | Are helicopter services required? | Yes |
Name | Description |
---|---|
Remove Analog 53 antenna |
Need to remove Analog 53 Antenna and undocumented mount to make room for Ch. 12 antenna, replace strobe light. |
Remove Ch. 49 Antenna |
After transition to Ch. 12 need to remove Ch. 49 antenna and transmission line. along with waveguide from Analog antenna being removed to allow new VHF Antenna installation mount new LED Strobe on new VHF 12 antenna |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 643 | |
Explanation | Planning/ CP Transition Pre-Planning, Planning and Construction, then commissioning after construction. Additionally, KGEB will hire an outside firm to facility to handle reimbursement filing and ensure a timely transition. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Attorney Fees Channel 14 Related Expenses |
Legal fees related to the station dealing with Channel 14 assignment |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $313,250.00 | $257,129.06 | N/A | $205,677.06 | N/A |
Total for all systems | $1,803,372.05 | $1,123,817.69 | N/A | $689,120.04 | N/A |
Primary Transmitter THV9 | $313,250.00 | $257,129.06 | $205,677.06 | ||
Switchgear - industrial 800 amp | $38,200.00 | $36,300.00 | Run circuits for THV-9 transmitter, dummy load, etc | $5,488.80 | N/A |
High VHF - Liquid Cooled Solid State Transmitter 3.3 . 6.5 kW | $249,500.00 | $196,529.06 | N/A | $196,529.06 | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $24,300.00 | N/A | $3,659.20 | N/A |
Actual Information Description | File Name |
---|---|
Switchgear - industrial 800 amp | |
High VHF - Liquid Cooled Solid State Transmitter 3.3 . 6.5 kW | |
Transformer 3 phase/480v - 150 KVA |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $431,528.20 | $248,775.28 | N/A | $226,652.08 | N/A |
Total for all systems | $1,803,372.05 | $1,123,817.69 | N/A | $689,120.04 | N/A |
Primary Antenna THV-7A12-R O4 | $431,528.20 | $248,775.28 | $226,652.08 | ||
Mounting bracket for top mount antenna | $31,298.20 | $31,298.20 | ANSI Certified mounting bracket for Top Mounted Antenna to Concrete reinforced Shear wall. Current Mount from 1995 does not meet current standards Final Estimate increased due to design change and cost of steel. | $9,175.00 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $6,400.00 | N/A |
High-VHF, One station antenna -- top mount, elliptically or circularly polarized | $393,500.00 | $211,077.08 | DTVPros Quote JEHQ1425 & GTI America, Inc., Invoice # 2408. | $211,077.08 | invoices received |
Actual Information Description | File Name |
---|---|
Mounting bracket for top mount antenna | |
Sweep test of existing antenna | |
High-VHF, One station antenna -- top mount, elliptically or circularly polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $11,800.00 | $22,298.24 | N/A | $20,817.71 | N/A |
Total for all systems | $1,803,372.05 | $1,123,817.69 | N/A | $689,120.04 | N/A |
Primary Transmission Line | $11,800.00 | $22,298.24 | $20,817.71 | ||
Flexible Air Transmission Line - dielectric, 3" | $11,800.00 | $22,298.24 | DTVPros quote JEHQ1425, Invoice 165B which includes overnight shipping. See the Transmission Line justification letter. | $20,817.71 | N/A |
Actual Information Description | File Name |
---|---|
Flexible Air Transmission Line - dielectric, 3" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $778,750.00 | $337,460.26 | N/A | $128,696.26 | N/A |
Total for all systems | $1,803,372.05 | $1,123,817.69 | N/A | $689,120.04 | N/A |
Primary Tower BANT | $778,750.00 | $337,460.26 | $128,696.26 | ||
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $122,710.26 | X-Ray analysis of 4 foot thick Shear Wall, concrete core drilling for attachment. Site Survey of roof shear Wall by antenna installation company to verify path of transmission line to new antenna mount location. | $122,710.26 | Z |
Tower Helicopter Lift | $126,075.00 | $126,075.00 | Remove old Antenna Ch. 53 Analog, Prep wall for new TIAA/ ANSI compliant antenna mount. Hang and rig new VHF Ch. 12 Digital Antenna with new strobe , Lift old TX Heat ex.Lift new TX Heat ex. Run 3" Heliax from transmitter room to new Ch. 12 antenna. | $1,500.00 | N/A |
Remove Analog 53 antenna | $2,400.00 | $2,400.00 | Removal of Analog antenna incorporated in Helicopter lift quote. | $0.00 | N/A |
Remove Ch. 49 Antenna | $71,275.00 | $71,275.00 | Remove DT-49 antenna after sign off, remove Heliax line and cover Heliax line hole in steel cover, clean up roof top. | $0.00 | N/A |
Minor tower reinforcement/modifications | $158,000.00 | $15,000.00 | N/A | $4,486.00 | N/A |
Actual Information Description | File Name |
---|---|
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | |
Tower Helicopter Lift | |
Remove Analog 53 antenna | Information not provided. |
Remove Ch. 49 Antenna | Information not provided. |
Minor tower reinforcement/modifications |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $238,874.00 | $229,550.00 | N/A | $94,095.08 | N/A |
Total for all systems | $1,803,372.05 | $1,123,817.69 | N/A | $689,120.04 | N/A |
Outside Professional Services | $238,874.00 | $229,550.00 | $94,095.08 | ||
Project management of the transition | $101,594.00 | $99,675.00 | Increased per Justifying Quote - KGEB Strategic Support Quote Widelity | $67,760.65 | Final work for project management will be submitted upon completion of Antenna installation. |
Attorney Fees Channel 14 Related Expenses | $5,000.00 | $5,000.00 | Estimated cost | $3,302.00 | N/A |
RF Exposure Measurements | $21,050.00 | $10,000.00 | N/A | $1,950.00 | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $80,000.00 | N/A | $1,223.43 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | $1,898.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $572.00 | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $1,500.00 | Needed STA due to inability to construct on UHF 14 due to Land Mobile Interference issues. Needed STA to allow time to prepare CP Major Mod for move to VHF Ch. 12 | $190.00 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $574.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | $0.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $16,625.00 | Additional studies needed to prove which channels were suitable to construct on due to inability to construct on Ch. 14 due to LM interference with two LM licensees on roof of antenna location. Ch. 14 should not have been assigned in the first place. | $16,625.00 | Awaiting explanation |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $0.00 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Project management of the transition | |
Attorney Fees Channel 14 Related Expenses | |
RF Exposure Measurements | |
Comprehensive coverage verification via field study, if needed | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | |
Prepare and or review reimbursement form | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Perform engineering study for new channel assignment and antenna development | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $29,169.85 | $28,604.85 | N/A | $13,181.85 | N/A |
Total for all systems | $1,803,372.05 | $1,123,817.69 | N/A | $689,120.04 | N/A |
Other Expenses | $29,169.85 | $28,604.85 | $13,181.85 | ||
MVPD Notification of Channel Change | $2,723.20 | $2,723.20 | postage and certified letters to MVPD for channel change. See attached invoice. | $2,723.20 | N/A |
Develop and air announcement of upcoming channel change | $866.65 | $866.65 | see Estimated Cost Justification KGEB-610-Develop and Air Channel Change Announcements v0 | $866.65 | N/A |
Equipment Delivery and Handling Charges | $5,000.00 | $5,000.00 | Estimate to deliver transmitter, antenna, transmission line, and antenna mount | $0.00 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $5,000.00 | $5,000.00 | Disposal of analog l transmitter, bandpass filter, to facilitate installation in transmitter room | $3,700.00 | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | STA # 0000024881 / Document # PGC2960746 - filed due to inability to construct on assigned Channel 14 due to Land Mobile interference issues on tower. | $0.00 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $11,000.00 | N/A | $3,492.00 | N/A |
Equipment Storage | $3,000.00 | $3,000.00 | N/A | $2,400.00 | N/A |
Local Zoning | $500.00 | $500.00 | estimated cost for zoning permits | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
MVPD Notification of Channel Change | |
Develop and air announcement of upcoming channel change | |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
FCC Filing Fees - Special Temporary Authorization request | |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
DTV Medical Facility Notification | |
Equipment Storage | |
Local Zoning | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $1,803,372.05 | $1,123,817.69 | $689,120.04 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | David Groves Acting Vice President 06/23/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | David Groves Acting Vice President 06/23/2020 |