Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
55106
Service:
DCA
Call Sign:
WARP-CD
Channel:
22 (UHF)
File Number:
0000028112
FRN:
0004536595
Date Submitted:
12/17/2019

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

SUNSHINE BROADCASTING COMPANY, INC.

Doing Business As: SUNSHINE BROADCASTING COMPANY, INC.

RANDOLPH WEIGNER

1903 SOUTH GREELEY HWY

#127

CHEYENNE, WY 82007

United States

+1 (877) 688-8954 DTVTV@YAHOO.COM Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Samuel Hariton

Widelity

4031 University Dr.

Suite 100

Fairfax, VA 22030

United States

+1 (339) 222-8107 sam.hariton@widelity.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan Build the facilities as close to the current 15 kW ERP power level as possible. The station may opt for channel change and may have to change the antenna size depending on available tower space which may require an increase in transmitter power.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model AUTV/3500LD
Year 2009
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 3.5 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model TMU9-4
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 4 kW
Justification for New Transmitter REPLACE ANALOG TRANSMITTER

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) Yes
Switchgear (industrial 800 amp) No
Transformer (480V) Yes
Power 150 kVA
Rigid Conduit and Wiring Yes
Size 1.5 inches
Length 50.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

INSTALLATION

INSTALLATION OF NEW TRANSMITTER, UNPACKING, SETUP, TESTING & VERIFICATION.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Class A
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 15.0 kW
Manufacturer
Model ALP24L3-HSBR
Year 1993

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Class A
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 15.0 kW
Manufacturer
Model PSI-24LP
Year 2019
Justification for New Antenna CURRENT ANTENNA CANNOT BE RETUNED TO NEW CHANNEL

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 3 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

SHIPPING

SHIPPING FROM MANUFACTURER TO SITE

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? No
Existing Transmission Line Manufacturer and Type Manufacturer
Type Flexible Air
Diameter 3 inches
Other Diameter N/A
Segment Length N/A
Other Segment Length N/A
Number of parallel runs 1
Length 600 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Flexible Air
Diameter 3 inches
Other Diameter N/A
Segment Length N/A
Other Segment Length N/A
Number of parallel runs 1
Length 600 feet per run
Justification for New Transmission Line ANTENNA WILL BE MOVED TO A NEW LOCATION ON TOWER AND EXISTING LINE CANNOT BE MOVED WITHOUT BEING DAMAGED OR DESTROYED

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

SHIPPING

SHIPPING/DELIVERY OF REPLACEMENT LINE

INSTALLATION

INSTALLATION OF LINE

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Yes
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1020779
Coordinates (NAD83) Latitude (NAD83) 27° 52' 01.6" N-
Longitude (NAD83) 082° 37' 25.9" W-
Overall Structure Height 654.85 feet
Support Structure Height 574.14 feet
Ground Elevation Above Mean Sea Level (AMSL) 4.92 feet
Structure Type LTOWER - Lattice Tower
Tower Owner SpectraSite Communications, LLC. through American Towers, LLC.
Date Constructed 12/01/1985

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
41382 WBTP FM
18512 WYUU FM

Other Types of Users

Users
WIRELESS 5
WIRELESS 4
WIRELESS 3
WIRELESS 2
WIRELESS 1
FM 147104

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Serious Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Tower Mapping

Tower mapping required before performing engineering study

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 605
Explanation Project management (Invoice processing, progress reporting, daisy chain monitoring and analysis, program management, and site visits as required)
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements No
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Attorney Fees - General REPACK work

General REPACK work

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning Yes
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? No

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

EAS SYSTEM

EAS SYSTEM

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $282,450.00 $126,090.20 N/A $82,090.20 N/A
Total for all systems $1,946,925.00 $1,724,545.20 N/A $146,681.35 N/A
Primary Transmitter TMU9-4 $282,450.00 $126,090.20 $82,090.20
INSTALLATION $3,000.00 $3,000.00 N/A N/A N/A
1.5" Rigid Conduit and Wiring $3,000.00 $3,000.00 No Predetermined Estimate N/A N/A
Transformer 3 phase/480v - 150 KVA $25,550.00 $24,300.00 N/A N/A N/A
Service entrance 3 phase/800 amp/208 volt $14,400.00 $13,700.00 N/A N/A N/A
UHF - Air Cooled Solid State Transmitter 4 - 6 kW $236,500.00 $82,090.20 Per attached Rohde & Schwarz invoice. $82,090.20 N/A

Components

Actual Information Description File Name
INSTALLATION Information not provided.
1.5" Rigid Conduit and Wiring Information not provided.
Transformer 3 phase/480v - 150 KVA Information not provided.
Service entrance 3 phase/800 amp/208 volt Information not provided.
UHF - Air Cooled Solid State Transmitter 4 - 6 kW

Component Description:
Transmitter invoice from Rohde & Schwarz.
Amount:
$82,090.20

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $42,630.00 $40,800.00 N/A $0.00 N/A
Total for all systems $1,946,925.00 $1,724,545.20 N/A $146,681.35 N/A
Primary Antenna PSI-24LP $42,630.00 $40,800.00 $0.00
UHF - Lower Power Side Mount, Class A One Station antenna -- basic $26,300.00 $25,000.00 Predetermined Estimate N/A N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A N/A N/A
Elbow complex, single channel, at antenna input, per 3 1/8. feedline (if needed) $7,600.00 $7,400.00 Predetermined Estimate N/A N/A
SHIPPING $2,000.00 $2,000.00 No Predetermined Estimate N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $73,400.00 $71,600.00 N/A $0.00 N/A
Total for all systems $1,946,925.00 $1,724,545.20 N/A $146,681.35 N/A
Primary Transmission Line $73,400.00 $71,600.00 $0.00
INSTALLATION $33,000.00 $33,000.00 N/A N/A N/A
Flexible Air Transmission Line - dielectric, 3" $35,400.00 $33,600.00 N/A N/A N/A
SHIPPING $5,000.00 $5,000.00 N/A N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,291,445.00 $1,228,345.00 N/A $26,820.00 N/A
Total for all systems $1,946,925.00 $1,724,545.20 N/A $146,681.35 N/A
Primary Tower LTOWER $1,291,445.00 $1,228,345.00 $26,820.00
Tower Mapping $16,345.00 $16,345.00 Per attached ATC tower mapping invoice. $16,345.00 N/A
Tall Tower (greater than 500') $210,500.00 $200,000.00 N/A $0.00 N/A
Serious tower reinforcement/modifications $1,052,000.00 $1,000,000.00 N/A N/A N/A
Structural engineering tower load study for well documented tower $12,600.00 $12,000.00 N/A $10,475.00 N/A

Components

Actual Information Description File Name
Tower Mapping

Component Description:
ATC tower mapping required to perform engineering load study.
Amount:
$16,345.00
Tall Tower (greater than 500') Information not provided.
Serious tower reinforcement/modifications Information not provided.
Structural engineering tower load study for well documented tower

Component Description:
Structural study of tower. WARP - American Tower - INV 160129601
Amount:
$10,475.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $214,810.00 $216,125.00 N/A $34,821.15 N/A
Total for all systems $1,946,925.00 $1,724,545.20 N/A $146,681.35 N/A
Outside Professional Services $214,810.00 $216,125.00 $34,821.15
Attorney Fees - General REPACK work $100.00 $100.00 Per attached FHH invoice 215572, dated 10/31/19. $100.00 Actual invoices submitted.
Comprehensive coverage verification via field study, if needed $84,200.00 $80,000.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A N/A N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $6,300.00 see Estimated Cost Justification WARP-550-Attorney - Negotiate Lease and Other Matters v0 $6,300.00 N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A N/A N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $4,300.00 interference study, the initial application and a maximization application. $1,750.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $650.00 N/A
Project management of the transition $95,590.00 $99,675.00 Per quote $25,871.15 N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A $150.00 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A

Components

Actual Information Description File Name
Attorney Fees - General REPACK work

Component Description:
FHH invoice for general REPACK attorney services
Amount:
$100.00
Comprehensive coverage verification via field study, if needed Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees - Negotiation of lease and other matters for shared locations

Component Description:
11-15-19 WARP - Fletcher - Legal - Aug '19 - INV 212904. Revised Invoice date per RFAS 0000028112 .
Amount:
$200.00

Component Description:
Review ATC tower leases dispute documents re WARP
Amount:
$6,100.00
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare request for Special Temporary Authorization Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
RF Eng - Construction Permit Application (Main)
Amount:
$1,750.00
Perform engineering study for new channel assignment and antenna development

Component Description:
Engineering Study for New Channel Assignment
Amount:
$650.00
Project management of the transition

Component Description:
Project Management
Amount:
$1,827.55

Component Description:
ATC Project Management
Amount:
$9,480.00

Component Description:
Widelity Project Management Services for May, 2019. INV SUN-WARP-CD-026
Amount:
$406.25

Component Description:
Project Management
Amount:
$1,940.40

Component Description:
Project Management
Amount:
$1,797.35

Component Description:
Project Management
Amount:
$423.75

Component Description:
Project Management
Amount:
$2,421.95

Component Description:
Project Management
Amount:
$3,466.55

Component Description:
Project Management
Amount:
$1,934.15

Component Description:
Project Management
Amount:
$1,801.95

Component Description:
Project Management
Amount:
$157.50

Component Description:
Project Management
Amount:
$67.50

Component Description:
Project Management
Amount:
$146.25
Prepare and or review reimbursement form

Component Description:
WARP - Fletcher - Legal Review 399 - Sept '19 - INV 213822
Amount:
$150.00
Address transition timing and coordination issues w/ other stations and wireless Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $42,190.00 $41,585.00 N/A $2,950.00 N/A
Total for all systems $1,946,925.00 $1,724,545.20 N/A $146,681.35 N/A
Other Expenses $42,190.00 $41,585.00 $2,950.00
EAS SYSTEM $6,000.00 $6,000.00 Replace analog EAS N/A N/A
Develop and air announcement of upcoming channel change $1,000.00 $1,000.00 N/A N/A N/A
Equipment Storage $5,000.00 $5,000.00 N/A N/A N/A
Equipment Delivery and Handling Charges $2,000.00 $2,000.00 No Predetermined Estimate N/A N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $10,000.00 $10,000.00 N/A N/A N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $190.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A $2,950.00 N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,070.00 N/A N/A N/A
Local Zoning $5,000.00 $5,000.00 N/A N/A N/A

Components

Actual Information Description File Name
EAS SYSTEM Information not provided.
Develop and air announcement of upcoming channel change Information not provided.
Equipment Storage Information not provided.
Equipment Delivery and Handling Charges Information not provided.
Disposal Costs (for equipment and other waste, net of any salvage value) Information not provided.
FCC Filing Fees - Special Temporary Authorization request Information not provided.
FCC Filing Fees - Form 2100 license to cover application Information not provided.
DTV Medical Facility Notification

Component Description:
Medical Facility Notification
Amount:
$2,950.00
FCC Filing Fees - Form 2100 minor change CP application Information not provided.
Local Zoning Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $1,946,925.00 $1,724,545.20 $146,681.35

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Randolph Weigner

LLC MEMBER


12/17/2019

Attachments

Back to Top