(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
168481
Service:
LPD
Call Sign:
WTBT-LD
Channel:
8 (High VHF)
File Number:
0000089488
FRN:
0028381564
Eligibility Status:
Eligible
Date Submitted:
11/14/2019

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

NEW YORK SPECTRUM HOLDING COMPANY, LLC

Doing Business As: NEW YORK SPECTRUM HOLDING COMPANY, LLC

MICHAEL P. DO

12020 SUNRISE VALLEY DRIVE

SUITE 115

RESTON, VA 20191

United States

+1 (571) 471-8806 michael.do@nybbsat.com Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

The Preparer is same as the reimbursement contact.

 

 

 

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan WTBT-LD Transitioning from Channel 45 to Channel 8 as a result of Broadcast Repack.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Ownership Owned
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model UTX5K
Year 2007
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 5 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model NOT DETERMINED
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 1 kW
Justification for New Transmitter NEED NEW TRANSMITTER TO OPERATE ON CHANNEL 8

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Other Transmitter Costs
Does the transmitter installation require a Transmitter Building Site Survey/Installation? Yes
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Rigid Conduit and Wiring No
Other Electrical Service Yes
Description NEW WIRING OF NEW TRANSMITTER REQUIRED
HVAC Service Does the replacement transmitter require HVAC Service? No
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Ownership Owned
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Other
Other Antenna Type Custom Panel
ERP: 3.0 kW
Manufacturer
Model SWLP16EC
Year 2007

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Change Type Purchase New
Ownership Owned
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types
Mounting Side Mount
Antenna position in stack Middle
Polarization Horizontal
Type Slotted Coaxial
ERP: 3.0 kW
Manufacturer
Model ATCBCH04CWS-8
Year 2019
Justification for New Antenna NEW CHANNEL 8 INCOMPATIBLE WITH EXISTING ANTENNA

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Ownership Owned
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Flexible Foam
Diameter Other
Other Diameter 2 1/8 inches
Number of parallel runs 1
Length 850 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Flexible Foam
Diameter 1 5/8 inches
Number of parallel runs 1
Length 800 feet per run
Justification for New Transmission Line New transmission line required for change in transmitter and antenna and change in location on tower
Interior RF Systems Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? No

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? Unknown
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1057473
Coordinates (NAD83) Latitude (NAD83) 27° 49' 10.8" N-
Longitude (NAD83) 082° 15' 38.0" W-
Overall Structure Height 1592.83 feet
Support Structure Height 1443.88 feet
Ground Elevation Above Mean Sea Level (AMSL) 75.13 feet
Structure Type GTOWER - Guyed Structure Used for Communication Purposes
Tower Owner American Towers LLC
Date Constructed 09/07/2011

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
11125 WCLF DTV
6601 WXPX-TV DTV
66013 WPOI FM
54948 WSVT-LD LPD
47459 WMNF FM
63984 WFUS FM
29732 WFLZ-FM FM
53819 WMOR-TV DTV
16788 WFTT-TV DTV
11290 WTSP DTV
74200 WWRM FM
168552 WTAM-LD LPD
23078 WMTX FM

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study need for guyed or free-standing tower
Tower Reinforcements Please select whether tower reinforcements are needed: No reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Information not provided.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? No
Outside RF consulting Engineering Services Perform engineering study for displacement application Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority No
Prepare Form 601 No
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Form 399 assistance or other program management costs Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements Yes
Additional Field Engineering Service Yes
Number of Days 3
Justification ENGINEERING SERVICES FOR COMPLEX INSTALLATION ON MULTI-TENANT TOWER 3 DAYS @ $2000 per day

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

INTERNAL PROJECT MGMT

INTERNAL PROJECT MANAGEMENT SERVICES 50 HOURS @$100.00 p/h

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Permit and Filing Costs FCC Construction Permit Major Change No
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? No
Point to Point Microwave (STL/ICR) Frequency Coordination for Unidirection System No
Frequency Coordination for Bi-Direction System No
New Point to Point Microwave System No

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $45,000.00 $45,000.00 N/A $0.00 N/A
Total for all systems $376,817.50 $376,817.50 N/A $0.00 N/A
Primary Transmitter NOT DETERMINED $45,000.00 $45,000.00 $0.00
High VHF - Air Cooled Solid State Transmitter 400 - 1000 Watts $30,000.00 $30,000.00 N/A N/A N/A
Other Electrical Service: NEW WIRING OF NEW TRANSMITTER REQUIRED $5,000.00 $5,000.00 N/A N/A N/A
Transmitter Building Site Survey/Installation $10,000.00 $10,000.00 N/A N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $42,755.00 $42,755.00 N/A $0.00 N/A
Total for all systems $376,817.50 $376,817.50 N/A $0.00 N/A
Primary Antenna ATCBCH04CWS-8 $42,755.00 $42,755.00 $0.00
High VHF-Low Power, Side Mount, Slotted Coaxial, 3.0kW input, Horizontal $29,400.00 $29,400.00 N/A N/A N/A
Sweep test of transmission line and antenna $5,730.00 $5,730.00 N/A N/A N/A
Side Mount antenna brackets $4,625.00 $4,625.00 N/A N/A N/A
Pattern scatter analysis for side mount (if not included in antenna base cost) $3,000.00 $3,000.00 N/A N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $19,200.00 $19,200.00 N/A $0.00 N/A
Total for all systems $376,817.50 $376,817.50 N/A $0.00 N/A
Primary Transmission Line $19,200.00 $19,200.00 $0.00
Flexible Foam Transmission Line - dielectric, 1 5/8" $19,200.00 $19,200.00 N/A N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $166,450.00 $166,450.00 N/A $0.00 N/A
Total for all systems $376,817.50 $376,817.50 N/A $0.00 N/A
Primary Tower GTOWER $166,450.00 $166,450.00 $0.00
Tower Rigging Tall Tower (greater than 500') $157,750.00 $157,750.00 N/A N/A N/A
Study needed for guyed or free-standing tower $8,700.00 $8,700.00 N/A N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $89,467.50 $89,467.50 N/A $0.00 N/A
Total for all systems $376,817.50 $376,817.50 N/A $0.00 N/A
Outside Professional Services $89,467.50 $89,467.50 $0.00
Prepare/ Review 399 reimbursement form $1,710.00 $1,710.00 N/A N/A N/A
Form 399 assistance or other Program Management costs $2,500.00 $2,500.00 N/A N/A N/A
Perform engineering study for displacement application $1,800.00 $1,800.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $2,102.50 $2,102.50 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,052.50 $1,052.50 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $3,025.00 $3,025.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $1,577.50 $1,577.50 N/A N/A N/A
Comprehensive coverage verification via field study, if needed $52,600.00 $52,600.00 N/A N/A N/A
RF Exposure Measurements $12,100.00 $12,100.00 N/A N/A N/A
Additional Field Engineering Service, 3 Days $6,000.00 $6,000.00 N/A N/A N/A
INTERNAL PROJECT MGMT $5,000.00 $5,000.00 N/A N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $13,945.00 $13,945.00 N/A $0.00 N/A
Total for all systems $376,817.50 $376,817.50 N/A $0.00 N/A
Other Expenses $13,945.00 $13,945.00 $0.00
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,110.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $335.00 N/A N/A N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $7,500.00 $7,500.00 N/A N/A N/A
Equipment Delivery and Handling Charges $5,000.00 $5,000.00 N/A N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $376,817.50 $376,817.50 $0.00

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel.
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

MICHAEL P. DO

CHIEF OPERATING OFFICER


11/14/2019

Attachments

Back to Top
Information not provided.