Sidewalk Sheds, General Construction |
- Component Description:
- BBB to coordinate filing of an amendment to the existing Tower Reconfiguration Project
- Amount:
- $2,875.42
- Component Description:
- BBB to coordinate filing of an amendment to the existing Tower Reconfiguration Project
- Amount:
- $6,180.17
- Component Description:
- BBB to coordinate filing of an amendment to the existing Tower Reconfiguration Project
- Amount:
- $475.00
- Component Description:
- Abatement Scaffold Engineering Filing-Updated
- Amount:
- $18,726.40
- Component Description:
- Please deny this invoice
- Amount:
- N/A
|
ESRT TRP tower modification Part 1 |
- Component Description:
- Fred Geller Electrical, Inc to perform electrical work per attached proposal
- Amount:
- $74,933.00
- Component Description:
- ESB TRP Phase 1 CA Services
- Amount:
- $22,226.25
- Component Description:
- Tower Reconfiguration - Structural Design
- Amount:
- $9,675.00
- Component Description:
- ESB TRP Phase 1 CA Service
- Amount:
- $811.25
- Component Description:
- Filing fee
- Amount:
- $102.49
- Component Description:
- TRP Phase 1
- Amount:
- $6,240.00
- Component Description:
- Review of FM Aux antenna mounting design and details submitted by antenna manufacturer.
- Amount:
- $8,215.00
- Component Description:
- Review of FM Aux antenna mounting design and details submitted by antenna manufacturer
- Amount:
- $9,677.50
- Component Description:
- TT will provide construction administration services for Phase 1B of the TRP on a Not-to-Exceed basis.
- Amount:
- $5,467.50
- Component Description:
- Review of FM Aux antenna mounting design and details submitted by antenna manufacturer
- Amount:
- $2,450.00
- Component Description:
- Tower Reconfiguration - Structural Design
- Amount:
- $77,400.00
- Component Description:
- Review of FM Aux antenna mounting design & details submitted by antenna manufacturer
- Amount:
- $4,900.00
- Component Description:
- Consultation re: filing
- Amount:
- $675.00
- Component Description:
- ESB TRP Phase 1 Construction Support
- Amount:
- $771.25
- Component Description:
- Review of FM Aux antenna mounting design; Combiner and AC equipment
- Amount:
- $4,410.00
- Component Description:
- TRP Logistics Planning - Thornton Tomaseti is engaged to provide construction logistics, phased engineering support, review applicable building codes as it relates to broadcast tower (222-F vs 222-G)
- Amount:
- $76.02
- Component Description:
- TRP Phase 1 , EBS shall provide testing services to determine the existence of ACM in the work areas identified by the construction documents.
- Amount:
- $6,635.60
- Component Description:
- TRP- Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $23,454.57
- Component Description:
- TRP Phase 1B, EBS will collect and analyze samples of suspect ESB building materials
- Amount:
- $2,010.91
- Component Description:
- Hanson provided services from 8/14 to 8/20/2015 to develop shutdown plan and strategy for TRP phasing,
- Amount:
- $16,366.90
- Component Description:
- Skanska shall provide structural reinforcement services as indicated by the Phase 1 structural drawings.
- Amount:
- $1,379,584.86
- Component Description:
- TRP- Phase 1B FM Aux/ Broadcast Equipment
- Amount:
- $23,355.25
- Component Description:
- Skanska to perform all construction work, per overall Tower Reconfiguration Project contract and in accordance with, construction drawings associated with the construction of the FM Aux Combiner Room
- Amount:
- $566,694.20
- Component Description:
- ESB TRP2 Additional Engineering Services
- Amount:
- $13,500.02
- Component Description:
- TRP- Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $23,762.91
- Component Description:
- TRP- Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $23,355.25
- Component Description:
- TRP Phase 1B, EBS to provide ACM investigation and reporting for the TRP Phase 1b
- Amount:
- $3,435.91
- Component Description:
- TRP- Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $23,580.34
- Component Description:
- ESB TRP Phase 1 Final Structural Design Services
- Amount:
- $20,499.97
- Component Description:
- Services as part of the FM Aux Combiner Room build out; structural analysis of ERI's FM System.
- Amount:
- $3,499.00
- Component Description:
- TRP- Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $23,355.25
- Component Description:
- TRP- Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $23,355.25
- Component Description:
- TRP - Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $23,355.25
- Component Description:
- TRP- Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $154.80
- Component Description:
- TRP- Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $468.85
- Component Description:
- MDB to maintain sidewalk sheds as part of the TRP Phase 1b installation work
- Amount:
- $5,044.32
- Component Description:
- FM Aux/Broadcast Equipment
- Amount:
- $23,355.25
- Component Description:
- TRP- Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $24,808.75
- Component Description:
- TRP Phase 1A, This PO represents the additional costs associated with CO ERI-004
- Amount:
- $444,146.86
- Component Description:
- ESB TRP2 Additional Engineering Services
- Amount:
- $7,499.97
- Component Description:
- Hanson provided services from 8/14 to 8/20/2015 to develop shutdown plan and strategy for TRP phasing, Reponded to question sfrom ESRT Executive team, and conducted preliminary surveys
- Amount:
- $4,499.30
- Component Description:
- Skanska to perform all construction work, per overall Tower Reconfiguration Project contract and in accordance with, construction drawings associated with the construction of the FM Aux Combiner Room
- Amount:
- $162,262.42
- Component Description:
- TRP- Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $23,651.13
- Component Description:
- TRP- Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $23,393.25
- Component Description:
- TRP- Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $109.50
- Component Description:
- Please deny this invoice
- Amount:
- N/A
- Component Description:
- Jessica Spiegel 11/05/18-11/11/18 5TH AVE Univision - Meeting with team to review proposed tower work
- Amount:
- $337.50
- Component Description:
- ESB TRP Phase 1 Construction Support
- Amount:
- $10,108.75
- Component Description:
- Skanska shall provide structural reinforcement services as indicated by the Phase 1 structural drawings.
- Amount:
- $1,732,219.59
- Component Description:
- TRP Phase 1
- Amount:
- $1,665.00
- Component Description:
- TT shall provide construction admin services for phase 1 for 12 months. TT services shall include submittal review, construction meetings and site visits
- Amount:
- $4,500.00
- Component Description:
- Review of FM Aux antenna mounting design and details submitted by antenna manufacturer.
- Amount:
- $12,305.00
- Component Description:
- TT will provide construction administration services for Phase 1B of the TRP on a Not-to-Exceed basis.
- Amount:
- $4,915.00
- Component Description:
- construction admini services for Phase 1B, FM Aux antenna mounting design,structural support on the new FM Aux Combiner & AC equipment on 85th fl., new chillers on 81st fl. setback
- Amount:
- $5,932.50
- Component Description:
- Consulting
- Amount:
- $112.50
- Component Description:
- PAL to conduct removal and disposal of ACPI on the 85th floor corridor.
- Amount:
- $3,048.50
- Component Description:
- A new chiller will be installed on the 81st Floor (east) setback roof.
- Amount:
- $12,000.00
- Component Description:
- TT shall provide construction admin services for phase 1 for 12 months. TT services shall include submittal review, construction meetings and site visits
- Amount:
- $16,159.28
- Component Description:
- Filing fee
- Amount:
- $100.00
- Component Description:
- TRP Phase 1
- Amount:
- $2,160.00
- Component Description:
- Code review and form filing
- Amount:
- $4,076.00
- Component Description:
- TRP Phase 1
- Amount:
- $51,971.25
- Component Description:
- Broadcasting-TRP Phase 1
- Amount:
- $1,161.00
- Component Description:
- TRP - Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $3,920.00
- Component Description:
- TRP Phase 1
- Amount:
- $11,040.00
- Component Description:
- "TRP Phase 1a - Abatement Scaffold
Engineering Filing-Updated"
- Amount:
- $350.00
- Component Description:
- Review of FM Aux antenna mounting design and details submitted by antenna manufacturer
- Amount:
- $6,220.00
- Component Description:
- Broadcasting - TRP Phase 1, Dielectric shall provide consulting services to support the TRP project, design/develop temporary antennas.
- Amount:
- $9,640.00
- Component Description:
- Fred Geller Electrical will be supplying a site safety officer for ERI and Skanska's wor1c on TRP lb.
- Amount:
- $4,600.00
- Component Description:
- TRP Phase 1a - Abatement Scaffold Engineering Filing-Updated
- Amount:
- $225.00
- Component Description:
- RF safety services
- Amount:
- $1,745.81
- Component Description:
- Broadcasting-TRP Phase 1
- Amount:
- $2,351.00
- Component Description:
- TRP Logistics Planning
- Amount:
- $20,000.01
- Component Description:
- Tower Reconfiguration - Structural Design
- Amount:
- $77,400.00
- Component Description:
- TRP Phase 1a - Abatement Scaffold Engineering Filing Updated
- Amount:
- $1,200.00
- Component Description:
- TRP Phase 1a
- Amount:
- $67,407.00
- Component Description:
- Skanska shall provide structural reinforcement services as indicated by the Phase 1 structural drawings.
- Amount:
- $1,461,587.27
- Component Description:
- Ariella Berliner 2/25/19-3/03/19 Conference call with project team to review filing strategy for LPC
- Amount:
- $225.00
- Component Description:
- RF safety services
- Amount:
- $1,200.00
- Component Description:
- ESB TRP2 Construction Logistics/Phasing
- Amount:
- $25,000.00
- Component Description:
- Broadcasting-TRP Phase 1
- Amount:
- $2,835.00
- Component Description:
- Consultation re: filing status
- Amount:
- $900.00
- Component Description:
- ESB TRP Phase 1 Construction Support
- Amount:
- $2,157.50
- Component Description:
- on-site technical advisory services
- Amount:
- $43,890.00
- Component Description:
- Filing forms and structural letter of completion; inspection fee
- Amount:
- $2,500.00
- Component Description:
- Tower Reconfiguration - Structural Design
- Amount:
- $7,740.00
- Component Description:
- TT shall provide construction admin services for phase 1 for 12 months.
- Amount:
- $35.09
- Component Description:
- Review of FM Aux antenna mounting design; Aux Combiner and AC equipment
- Amount:
- $9,807.50
- Component Description:
- A new chiller will be installed on the 81st Floor (east) setback roof.
- Amount:
- $4,000.00
- Component Description:
- Consulting re: filing status
- Amount:
- $112.50
- Component Description:
- Engineering services - 50% Deposit with order
- Amount:
- $5,125.00
- Component Description:
- ESB TRP Phase 1 CA Service
- Amount:
- $42,256.25
- Component Description:
- TRP Phase 1b
- Amount:
- $500.00
- Component Description:
- TT shall provide construction admin services for phase 1 for 12 months.
- Amount:
- $105.27
- Component Description:
- Review of FM Aux antenna mounting design and details submitted by antenna manufacturer.
- Amount:
- $4,410.00
- Component Description:
- TRP Phase 1b, New PO to account for ERI's new invoice
- Amount:
- $26,275.00
- Component Description:
- Tower Reconfiguration - Structural Design
- Amount:
- $11,610.00
|
Serious tower reinforcement/modifications |
- Component Description:
- Mancini Duffy shall prepare filing documents for Phase 1 and Phase 2. Mancini shall provide construction administration for the build out of the combiner room on 85.
- Amount:
- $1,891.36
- Component Description:
- TRP Phase 1
- Amount:
- $5,370.00
- Component Description:
- Mancini Duffy shall prepare filing documents for Phase 1 and Phase 2. Mancini shall provide construction administration for the build out of the combiner room on 85.
- Amount:
- $570.49
- Component Description:
- TRP Phase 1, TRP Phase 1
- Amount:
- $12,286.54
- Component Description:
- Mancini Duffy shall prepare filing documents for Phase 1 and Phase 2.
- Amount:
- $3,045.66
- Component Description:
- Broadcast tower and 85th floor, FGE to furnish all labor and material to complete electrical work.
- Amount:
- $5,966.35
- Component Description:
- TRP Phase 1b - FM Aux, Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system
- Amount:
- $235,644.85
- Component Description:
- Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system including, but not limited to, new FM Aux Combiner and FM Aux Antenna.
- Amount:
- $984,286.95
- Component Description:
- ESB Tower Reconfiguration - professional architectural and interior design services for the revision of construction documents
- Amount:
- $4,253.61
- Component Description:
- Duggal to create replacement banner for State Bar and Grill to be attached on the new 33rd street side walk shed.
- Amount:
- $4,904.81
- Component Description:
- ESB Tower Reconfiguration - professional architectural and interior design services for the revision of construction documents
- Amount:
- $4,250.00
- Component Description:
- TRP Phase 1b - FM Aux, Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system
- Amount:
- $43,144.06
- Component Description:
- TRP Phase 1b - FM Aux, Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system
- Amount:
- $167,102.69
- Component Description:
- ESB Tower Reconfiguration - professional architectural and interior design services for the revision of construction documents
- Amount:
- $6,674.34
- Component Description:
- TRP Phase 1b - FM Aux, Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system
- Amount:
- $537,064.89
- Component Description:
- ESB Tower Reconfiguration- revision of construction documents
- Amount:
- $12,000.00
- Component Description:
- TRP Phase 1b - FM Aux, Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system
- Amount:
- $260,634.00
- Component Description:
- MDB to maintain sidewalk sheds as part of the TRP Phase 1b installation work
- Amount:
- $450.43
- Component Description:
- ACM Investigator Service of a New York City Certified Asbestos Investigator to perform an inspection related to structural work
- Amount:
- $375.00
- Component Description:
- MDB to maintain sidewalk sheds as part of the TRP Phase 1b installation work.
- Amount:
- $1,970.88
- Component Description:
- ESB Tower Reconfiguration - professional architectural and interior design services for the revision of construction documents
- Amount:
- $3,574.95
- Component Description:
- Mancini Duffy shall prepare filing documents for Phase 1 and Phase 2. Mancini shall provide construction administration for the build out of the combiner room on 85.
- Amount:
- $3,219.64
- Component Description:
- furnish and install a complete FM Aux system
- Amount:
- $82,609.17
- Component Description:
- furnish and install a complete FM Aux system
- Amount:
- $21,880.28
- Component Description:
- Philips shall provide the light fixtures, data enablers, and necessary power cords for installing new LED fixtures on the Cocoon.
- Amount:
- $63,540.00
- Component Description:
- Philips shall provide the light fixtures, data enablers, and necessary power cords for installing new LED fixtures on the Cocoon.
- Amount:
- $15,885.00
- Component Description:
- Turris engineering shall provide a visual inspection of tower, take measurements, visually record observations and submit a report of findings
- Amount:
- $4,950.00
- Component Description:
- TRP Phase 1b - FM Aux, Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system
- Amount:
- $601,201.30
- Component Description:
- TRP Phase 1, EverGreene Architectural Arts shall furnish and install the current murals
- Amount:
- $12,286.54
- Component Description:
- Kevin Fisher of Smith & Fisher has provided consulting support for ESRT on the logistics of TRP Project.
- Amount:
- $19,500.00
- Component Description:
- Philips Lighting shall provide engineering services to design the LED system details for the Site Safety Enclosure and integrate into the lighting control system.
- Amount:
- $8,000.00
- Component Description:
- TRP Phase 1A, This PO represents the additional cost associated with CO ERI-004
- Amount:
- $111,036.72
- Component Description:
- TRP Phase 1a-Abatement Scaffold Engineering Filing-Updated, Fred Geller Electric (FGE) to provide all material and labor
- Amount:
- $25,962.33
- Component Description:
- Broadcasting - TRP
- Amount:
- $1,197.62
- Component Description:
- TRP Phase 1
- Amount:
- $20,000.00
- Component Description:
- TRP Phase 1b - FM Aux, Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system
- Amount:
- $1,126,291.37
- Component Description:
- ESP TRP Phase 1 Construction Support
- Amount:
- $24,306.25
- Component Description:
- TRP Phase 1b - FM Aux, Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system
- Amount:
- $333,377.71
- Component Description:
- See Turris proposal 16-0620-R2 dated 6/20/16. This proposal includes services required to document where the existing transmission lines are located in the tower structure from levels 0 thru 4.
- Amount:
- $6,575.00
- Component Description:
- TRP Phase 1
- Amount:
- $11,627.50
- Component Description:
- Preparation and filing of forms and structural letter of completion
- Amount:
- $1,526.00
- Component Description:
- TRP Phase 1b - FM Aux, Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system
- Amount:
- $1,445,945.00
- Component Description:
- ESB Tower Reconfiguration - professional architectural and interior design services for the revision of construction documents
- Amount:
- $4,515.00
- Component Description:
- Tower reconfiguration
- Amount:
- $40,766.31
- Component Description:
- TRP Phase 1
- Amount:
- $8,988.95
- Component Description:
- Tower Reconfiguration
- Amount:
- $13,000.00
- Component Description:
- TRP Phase 1B, Flagg Waterproofing and Restoration to perform water proofing work in accordance with CRS documents SK-A
- Amount:
- $88,330.00
- Component Description:
- Tower Reconfiguration
- Amount:
- $4,542.07
- Component Description:
- ESB TRP Phase 1 Final Structural Design Services
- Amount:
- $22,000.01
- Component Description:
- Expedited filing services for the structural work
- Amount:
- $3,365.00
- Component Description:
- Mancini Duffy shall prepare filing documents for Phase 1 and Phase 2. Mancini shall provide construction administration for the build out of the combiner room on 85.
- Amount:
- $1,755.45
- Component Description:
- TRP Phase 1
- Amount:
- $24,788.39
- Component Description:
- Tower reconfiguration
- Amount:
- $10,036.81
- Component Description:
- TRP Phase 1B, Flagg Waterproofing and Restoration to perform water proofing work
- Amount:
- $63,774.00
- Component Description:
- TRP Phase 1b - FM Aux, Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system
- Amount:
- $663,688.64
|
ESRT TRP tower modification Part 2 |
- Component Description:
- Skanska to perform all construction work, per overall Tower Reconfiguration Project contract and in accordance with, construction drawings associated with the construction of the FM Aux Combiner Room
- Amount:
- $71,567.78
- Component Description:
- Skanska to perform all construction work, per overall Tower Reconfiguration Project contract and in accordance with, construction drawings associated with the construction of the FM Aux Combiner Room
- Amount:
- $99,747.88
- Component Description:
- Skanska to perform all construction work, per overall Tower Reconfiguration Project contract and in accordance with, construction drawings associated with the construction of the FM Aux Combiner Room
- Amount:
- $133,062.50
- Component Description:
- TRP Phase la Construction - Skanska shall provide structural reinforcement services as indicated by the Phase 1 structural drawings.
- Amount:
- $1,853,848.34
- Component Description:
- CE002 - Fire Alarm not included in original scope
- Amount:
- $248,713.10
- Component Description:
- Skanska shall provide structural reinforcement services as indicated by the Phase 1 structural drawings.
- Amount:
- $1,755,613.70
- Component Description:
- Skanska to perform all construction work, per overall Tower Reconfiguration Project contract and in accordance with, construction drawings associated with the construction of the FM Aux Combiner Room
- Amount:
- $518,020.40
- Component Description:
- Skanska to perform all construction work, per overall Tower Reconfiguration Project contract and in accordance with, construction drawings associated with the construction of the FM Aux Combiner Room
- Amount:
- $510,059.00
- Component Description:
- Skanska to perform all construction work, per overall Tower Reconfiguration Project contract and in accordance with, construction drawings associated with the construction of the FM Aux Combiner Room
- Amount:
- $447,617.20
- Component Description:
- Skanska to perform all construction work, per overall Tower Reconfiguration Project contract and in accordance with, construction drawings associated with the construction of the FM Aux Combiner Room
- Amount:
- $17,047.12
- Component Description:
- Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system including, but not limited to, new FM Aux Combiner and FM Aux Antenna.
- Amount:
- $344,393.27
- Component Description:
- Mancini Duffy shall prepare filing documents for Phase 1 and Phase 2. Mancini shall provide construction administration for the build out of the combiner room on 85.
- Amount:
- $3,780.00
- Component Description:
- Hanson provided services from 8/14 to 8/20/2015 to developshutdown plan and strategy for TRP phasing, Reponded to question sfrom ESRT Executive team, and conducted preliminary surveys
- Amount:
- $46,590.00
- Component Description:
- TRP Phase la Construction - Skanska shall provide structural reinforcement services as indicated by the Phase 1 structural drawings.
- Amount:
- $2,766,733.63
- Component Description:
- TRP Phase 2&3
- Amount:
- $2,730.00
- Component Description:
- Hanson provided services from 8/14 to 8/20/2015 to develop shutdown plan and strategy for TRP phasing, Reponded to question sfrom ESRT Executive team
- Amount:
- $17,996.80
- Component Description:
- TRP Phase 2&3
- Amount:
- $1,200.00
- Component Description:
- Structural reinforcement services
- Amount:
- $4,533,753.80
- Component Description:
- TPR Phase 2&3
- Amount:
- $630.00
|
Structural engineering tower load study for well documented tower |
- Component Description:
- Structural study
- Amount:
- $20,000.00
- Component Description:
- TRP Phase 1
- Amount:
- $7,300.00
- Component Description:
- Tower Reconfiguration
- Amount:
- $114,700.00
- Component Description:
- TRP Phase 1
- Amount:
- $82.91
- Component Description:
- Initial Structural Design Services
- Amount:
- $50.33
- Component Description:
- TT shall provide construction admin services for phase 1 for 12 months. TT services shall include submittal review, construction meetings and site visits
- Amount:
- $12,416.30
- Component Description:
- Tower Load Study
- Amount:
- $1,326.76
- Component Description:
- Tower Reconfiguration
- Amount:
- $25,870.00
- Component Description:
- Aerodynamic Assessment of Antenna, Additional Iteration, Attendance at a Meeting in New York
- Amount:
- $2,700.00
- Component Description:
- 4000 -- Aerodynamic Assessment of Antenna
- Amount:
- $15,000.00
- Component Description:
- Aerodynamic Assessment of Antenna, Additional Iteration, Additional Iteration
- Amount:
- $10,800.00
- Component Description:
- Tower Reconfiguration
- Amount:
- $13,930.00
- Component Description:
- TRP Phase 1
- Amount:
- $25,384.41
- Component Description:
- TRP Phase 1
- Amount:
- $19.37
- Component Description:
- Please Deny this invoice.
- Amount:
- N/A
- Component Description:
- ESB TRP2 Additional Engineering Services
- Amount:
- $38.23
- Component Description:
- Univision Antenna Installation
- Amount:
- $14,999.98
- Component Description:
- Tower Reconfiguration - Structural Design
- Amount:
- $9,677.97
- Component Description:
- TRP Phase 1
- Amount:
- $2,640.00
- Component Description:
- TT to provide additional structural engineering services as part of the TRP Phase 1B project.
- Amount:
- $7,500.00
- Component Description:
- TRP Phase 1
- Amount:
- $44.63
- Component Description:
- Services to do a full-scale windload testing o
- Amount:
- $8,850.00
- Component Description:
- TRP Phase 1
- Amount:
- $164.36
- Component Description:
- TRP Phase 1
- Amount:
- $21,697.79
- Component Description:
- Please deny this invoice
- Amount:
- N/A
- Component Description:
- Please deny this invoice.
- Amount:
- N/A
- Component Description:
- Tower Reconfiguration
- Amount:
- $24,950.00
- Component Description:
- structural review and analysis services
- Amount:
- $2,500.02
- Component Description:
- services to do a full-scale windload testing of the Temporary enclosure material
- Amount:
- $19,600.00
- Component Description:
- TRP Logistic Planning, Tom Silliman of ERI will attend a three day walk thru and meetings at ESB from 8/20 to 8/22.
- Amount:
- $9,038.00
- Component Description:
- Please Deny this invoice.
- Amount:
- N/A
- Component Description:
- Structural Engineering Tower load study
- Amount:
- $19,998.00
|
Site Safety |
- Component Description:
- ESB Univision Top Mount (18331)
- Amount:
- $23,750.00
|
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) |
- Component Description:
- Engineering Services
- Amount:
- $5,125.00
|
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) |
Information not provided. |