Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
57511
Service:
LPA
Call Sign:
K49GF
Channel:
31 (UHF)
File Number:
0000089321
FRN:
0005024534
Eligibility Status:
Eligible
Date Submitted:
11/13/2019

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

Ron Bevins

Doing Business As: Hispanavision Television

715 W Yakima Ave

Yakima, WA 98902

United States

+1 (509) 452-8817 rbevins2003@yahoo.com Not-for-Profit

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Tony Zummallen

President

QCommunications, LLC

Tony Zummallen

705B SE Melody Lane #314

Lee's Summit, MO 64063

United States

+1 (816) 729-1177 tony@Qcomm.tv

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan Replace the transmitter, line and antenna per the channel reassignment project with reasonable and customary engineering and business practices.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Ownership Owned
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model unknown
Year 2001
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 1.2 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model TRN5XU18C
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 1.2 kW
Justification for New Transmitter New transmitter required to match original contour.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Other Transmitter Costs
Does the transmitter installation require a Transmitter Building Site Survey/Installation? Yes
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) Yes
Power 150 kVA
Rigid Conduit and Wiring No
Other Electrical Service No
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 5 tons
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 70.0 square feet

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Site Prep

Prepare site for installation of new transmitter

Taxes

Estimated sales tax not included on quote

Shipping

Shipping costs not included on quote

Decommission

Decommission and deinstall old transmitter

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Ownership Owned
Is the existing antenna shared with another station or stations? Yes
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type
Mounting Side Mount
Antenna position in stack Bottom
Polarization Horizontal
Type Slotted Coaxial
ERP: 2.48 kW
Manufacturer
Model JA-SS-8/D39 SHO
Year 2010

Facility ID's and Call Signs of all stations with whom the antenna is shared.

Facility ID Call Sign
190359 KYPK-LD

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Change Type Purchase New
Ownership Owned
Is antenna shared? Yes
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types
Mounting Side Mount
Antenna position in stack Bottom
Polarization Horizontal
Type Slotted Coaxial
ERP: 2.48 kW
Manufacturer
Model unknown
Year 2017
Justification for New Antenna New antenna required to match original contour.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 2
Frequencies of channels supported Upper and lower frequency
Frequency 566.0 MHz - 608.0 MHz
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Combiner Sales Tax

Sales tax for combiner

Combiner

Cost for combiner

Combiner Shipping fees

Shipping fees for combiner

Shipping

Estimated shipping not included on quote

Taxes

Estimated sales tax not included on quote

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Ownership Owned
Is the existing transmission line shared with another station or stations? Yes
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Flexible Foam
Diameter 1 5/8 inches
Number of parallel runs 1
Length 70 feet per run

Facility ID's and Call Signs of all stations with whom the transmission line is shared.

Facility ID Call Sign
190359 KYPK-LD

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Flexible Foam
Diameter 1 5/8 inches
Number of parallel runs 1
Length 70 feet per run
Justification for New Transmission Line New line needed to mate new antenna with new transmitter.
Interior RF Systems Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? No

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Sales Tax

Sales tax for transmission line

Shipping

Shipping costs for transmission line

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Yes
Existing Tower Structure Registration Do you have a tower registration number? No
Coordinates (NAD83) Latitude (NAD83) 46° 31' 58.5" N-
Longitude (NAD83) 120° 29' 41.4" W-
Overall Structure Height 53.00 feet
Support Structure Height 50.00 feet
Ground Elevation Above Mean Sea Level (AMSL) 1841.00 feet
Structure Type LTOWER - Lattice Tower
Tower Owner Hispanavision
Date Constructed 09/19/2018

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
190359 KYPK-LD LPD
57522 KWYT-LP LPD

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Tower mapping and report for structural engineer
Tower Reinforcements Please select whether tower reinforcements are needed: No reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Information not provided.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 200
Explanation Required to assist in the turnkey management of the channel relocation project in order that the existing internal personnel can maintain and operate the stations daily operational requirements and plans.
Outside RF consulting Engineering Services Perform engineering study for displacement application Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Prepare Form 601 Yes
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Form 399 assistance or other program management costs Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements No
Additional Field Engineering Service No

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Information not provided.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Permit and Filing Costs FCC Construction Permit Major Change Yes
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Point to Point Microwave (STL/ICR) Frequency Coordination for Unidirection System Yes
Frequency Coordination for Bi-Direction System Yes
New Point to Point Microwave System Yes
Type 6/11 GHz Licensed Part 101

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $173,100.00 $188,100.00 N/A $0.00 N/A
Total for all systems $420,167.50 $445,657.50 N/A $0.00 N/A
Primary Transmitter TRN5XU18C $173,100.00 $188,100.00 $0.00
Decommission $6,000.00 $6,000.00 Estimated costs to decommission, de-install and disconnect old transmitter and all its components to prepare for installation of new transmitter N/A N/A
Shipping $2,500.00 $2,500.00 Estimated costs to ship transmitter to site or storage facility N/A N/A
Taxes $8,400.00 $8,400.00 Estimated sales tax for transmitter. Actuals to be determined. N/A N/A
Other -- Building Addition Size: 70.0 $9,400.00 $9,400.00 Estimated $28k building addition, shared between 3 call signs. N/A N/A
5 Ton system $20,250.00 $20,250.00 N/A N/A N/A
Transformer 3 phase/480v - 150 KVA $25,550.00 $25,550.00 N/A N/A N/A
Transmitter Building Site Survey/Installation $10,000.00 $25,000.00 Estimated costs for site survey and transmitter installation. Revised upon Site Survey. N/A N/A
Site Prep $7,000.00 $7,000.00 Estimated costs to prepare site for new transmitter. Includes receiving and inventory of new transmitter and its components; pre-assembly of cabinets and subassemblies; ensuring site has all materials required by installation crew N/A N/A
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW $84,000.00 $84,000.00 N/A N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $28,447.50 $28,447.50 N/A $0.00 N/A
Total for all systems $420,167.50 $445,657.50 N/A $0.00 N/A
Primary Antenna unknown $28,447.50 $28,447.50 $0.00
Combiner Shipping fees $500.00 $500.00 Estimated shipping costs for combiner, shared between 2 call signs. Actual costs to be determined. N/A N/A
Combiner $5,092.50 $5,092.50 Combiner quote attached, shared between 2 call signs. Actual costs to be determined. N/A N/A
Combiner Sales Tax $500.00 $500.00 Estimated sales tax for combiner, shared between 2 call signs. Actual costs to be determined. N/A N/A
Sweep test of transmission line and antenna $5,730.00 $5,730.00 N/A N/A N/A
UHF-Low Power, Side Mount, Slotted Coaxial, 2.48kW input, Horizontal $10,000.00 $10,000.00 Estimated $20k for new antenna, shared between 2 call signs. Actual costs to be determined. N/A N/A
Side Mount antenna brackets $4,625.00 $4,625.00 N/A N/A N/A
Shipping $1,000.00 $1,000.00 Estimated shipping costs of $2000, shared between 2 call signs. Actual costs to be determined. N/A N/A
Taxes $1,000.00 $1,000.00 Estimated sales tax of $2000, shared between 2 call signs. N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $2,680.00 $2,680.00 N/A $0.00 N/A
Total for all systems $420,167.50 $445,657.50 N/A $0.00 N/A
Primary Transmission Line $2,680.00 $2,680.00 $0.00
Shipping $500.00 $500.00 Estimated shipping of $1000, shared between 2 call signs. Actual costs to be determined. N/A N/A
Sales Tax $500.00 $500.00 Estimated sales tax of $1000, shared between 2 call signs. Actual costs to be determined. N/A N/A
Flexible Foam Transmission Line - dielectric, 1 5/8" $1,680.00 $1,680.00 N/A N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $77,190.00 $77,190.00 N/A $0.00 N/A
Total for all systems $420,167.50 $445,657.50 N/A $0.00 N/A
Primary Tower LTOWER $77,190.00 $77,190.00 $0.00
Tower Rigging Short Tower (less than 500') $56,190.00 $56,190.00 N/A N/A N/A
Tower mapping and report for structural engineer $21,000.00 $21,000.00 N/A N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $98,390.00 $108,880.00 N/A $0.00 N/A
Total for all systems $420,167.50 $445,657.50 N/A $0.00 N/A
Outside Professional Services $98,390.00 $108,880.00 $0.00
Comprehensive coverage verification via field study, if needed $52,600.00 $52,600.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $2,235.00 $2,235.00 N/A N/A N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $3,262.50 $3,262.50 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $1,577.50 $1,577.50 N/A N/A N/A
Prepare Form 601 $755.00 $755.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $3,025.00 $3,025.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,052.50 $1,052.50 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $2,102.50 $2,102.50 N/A N/A N/A
Prepare request for Special Temporary Authorization $1,280.00 $1,280.00 N/A N/A N/A
Perform engineering study for displacement application $1,800.00 $1,800.00 N/A N/A N/A
Form 399 assistance or other Program Management costs $5,890.00 $5,890.00 Per attached QCommunications quote. N/A N/A
Prepare/ Review 399 reimbursement form $1,710.00 $2,500.00 Per attached QCommunications quote. N/A N/A
Project management of the transition $21,100.00 $30,800.00 200 hours at $154/hour. N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $40,360.00 $40,360.00 N/A $0.00 N/A
Total for all systems $420,167.50 $445,657.50 N/A $0.00 N/A
Other Expenses $40,360.00 $40,360.00 $0.00
New Point to Point Microwave System: 6/11 GHz Licensed Part 101 $28,500.00 $28,500.00 N/A N/A N/A
Point to Point Microwave (STL/ICR): Frequency Coordination for Bi-Direction System $1,100.00 $1,100.00 N/A N/A N/A
Point to Point Microwave (STL/ICR): Frequency Coordination for Unidirection System $550.00 $550.00 N/A N/A N/A
Equipment Storage $1,000.00 $1,000.00 Expecting multiple staggered equipment deliveries from different vendors and need to store and stage new equipment prior to installation date. Anticipate 6-24 months of storage time. N/A N/A
Equipment Delivery and Handling Charges $1,000.00 $1,000.00 Transport, forklift rental and handling fees from staging area to transmitter site. N/A N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $1,500.00 $1,500.00 4-6 yard disposal bin on site to capture all wast from on site system integration and tower vendors. N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $335.00 N/A N/A N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,110.00 N/A N/A N/A
FCC Filing Fees - Form 2100 Major change CP application $4,960.00 $4,960.00 N/A N/A N/A
FCC Filing Fees - Special Temporary Authorization request $305.00 $305.00 N/A N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $420,167.50 $445,657.50 $0.00

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel.
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Ron Bevins

Owner


11/13/2019

Attachments

Back to Top