Facility ID:
53465
Service:
DTV
Call Sign:
WKCF
Channel:
23 (UHF)
File Number:
0000026735
FRN:
0002538445
Date Submitted:
10/18/2019

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

Hearst Properties Inc.

Doing Business As: Hearst Properties Inc.

PO Box 1800

Raleigh, NC 27602

United States

+1 (919) 839-0300 shartzell@brookspierce.com Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

The Preparer is same as the reimbursement contact.

 

 

 

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan see attached document

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model DCX-2H
Year 2002
Type Inductive Output Tube
IOT Power Type Two
Power Capacity 45 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model ULXTE-80
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 50.1 kW
Justification for New Transmitter Existing IOT txmtr cannot be converted to post-transition channel, see Comark Re-tune statement. An IOT replacement is more expensive than proposed SS txmtr. See attached Comark IOT Transmitter quote.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service Yes
Description Transmitter electrical installation hardware and labor
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Transmitter de-install

remove old transmitter

Change Order 1

change to copper plumbing kits

Change Orders

Other transmitter change orders

Sales Tax

transmitter sales tax

Electrical Accessories

Surge protection required by transmitter manufacturer

Transmitter insallation incidentals

equipment rentals and additional supplies needed for transmitter installation

Change Order 2

change to 8-pole mask filters

Shipping

Transmitter shipping

RF Accessories

Additional RF components required for transmitter operatoin

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model TFU-24GTH S180 DC
Year 2001

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model TFU-27ETT-R 4C140
Year 2019
Justification for New Antenna Current antenna is channel specific and cannot be used on post-transition channel. Antenna must be replaced.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna?
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna?
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Sales Tax

Sales Tax for both antenna and transmission line

Mounting Pole extension

Mounting Pole extension

Shipping

Shipping

Feed-through components

Components needed for candelabra tower

Wedding Cake Mount Adapter

Wedding Cake Mount Adapter

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Lease New
Ownership Leased
Owner American Tower Corp.
Is antenna shared? Yes
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Broadband Slot
Number of Stations Supported 4
Number of Panels/Bays 24
Lower Limit 470.00 MHz
Upper Limit 680.00 MHz
Design power capacity in use 39.0 %
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model TFU-24WB/VP-1-R S230
Year 2019
Justification for New Antenna WKCF has no auxiliary antenna. Interim antenna needed while main antenna and transmission line are replaced.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 4
Frequencies of channels supported Upper and lower frequency
Frequency 488.0 MHz - 608.0 MHz
Do you need a combiner output splitter/switcher for dual feed lines? No
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? B
Feed Line Size 6 1/8 inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Combiner Connection

transmission line components and labor to connect transmitter to interim antenna combiner

Combiner Installation

WKCF portion of combiner installation

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1850 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1850 feet per run
Justification for New Transmission Line Current transmission line segment length is not compatible with post-transition channel and must be replaced.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Lease New
Type Rigid
Diameter 8 3/16 inches
Segment Length Broadband
Other Segment Length
Number of parallel runs 1
Length 1525 feet per run
Justification for New Transmission Line line needed for interim antenna

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? Candelabra
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1212124
Coordinates (NAD83) Latitude (NAD83) 28° 35' 12.6" N-
Longitude (NAD83) 081° 04' 57.5" W-
Overall Structure Height 1682.07 feet
Support Structure Height 1574.13 feet
Ground Elevation Above Mean Sea Level (AMSL) 66.93 feet
Structure Type GTOWER - Guyed Structure Used for Communication Purposes
Tower Owner American Tower, LLC
Date Constructed 03/18/2002

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
5802 WVEN-TV DTV
60018 WACX DTV
9881 WTGL DTV
24582 WHLV-TV DTV

Other Types of Users

Users
WOFT-LD

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for tower with candelabra
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Candelabra
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Ground and Building A-E Permit Drawing Package

The generation of a permitting drawing package for one (1) broadcasters/customers.

Tower Project Management

(10) hours on Modification project management and (10) hours for RF installation project management for a total of ten (10) days,

Tower Permit Drawing Package

The generation of a permitting drawing package for one (1) broadcasters/customers.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 760
Explanation On site management of transmitter installation, line-antenna replacement, and tower work.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 2
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements Yes
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

RF System Test

Testing of the combiner to ensure all frequencies are tuned for optimal patterns per attached ATC documentation.

Site Coordination Meeting

Site coordination meetings with all broadcasters, contractors and vendors involved with the site project.

Transmitter Site Survey

Transmitter planning survey & transmitter building drawings

Non-Catalog legal expenses

Non-Catalog expenses for legal advice and services, including financial/reimbursement review, transition reporting, transition procedures, and other transition-related issues

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning Yes
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? No
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

ATC Tax

Tax on ATC provided equipment and services

ATC one-time tower rental

ATC one-time tower rental during market repack period per attached ATC documentation

Contract Labor

labor directly related to the station channel change

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,654,153.96 $1,654,153.96 N/A $1,616,413.96 N/A
Total for all systems $4,111,774.14 $3,576,942.76 N/A $2,782,932.87 N/A
Primary Transmitter ULXTE-80 $1,654,153.96 $1,654,153.96 $1,616,413.96
Transmitter insallation incidentals $5,000.00 $5,000.00 equipment rental, additional supplies and services required for transmitter installation $2,348.82 N/A
RF Accessories $76,222.30 $76,222.30 Additional RF components required for transmitter operation and integration into current RF environment per GatesAir quote $76,222.30 N/A
Shipping $17,016.56 $17,016.56 transmitter shipping per GatesAir quote invoice $17,016.56 N/A
Change Order 2 $22,885.61 $22,885.61 8-pole mask filters $22,885.61 N/A
Electrical Accessories $13,430.49 $13,430.49 Transmitter manufacturer required surge protection and 300KVA transformer per attached GatesAir quote $13,430.49 N/A
Sales Tax $97,753.00 $97,753.00 transmitter sales tax per attached GatesAir quote $80,682.03 N/A
Change Orders $28,000.00 $28,000.00 other needed transmitter items $27,250.15 N/A
UHF - Liquid Cooled Solid State Transmitter 50.1 kW $1,297,531.50 $1,297,531.50 GatesAir quote sections A, B & E. This is the transmitter, mask filter, installation and proof per the FCC "transmitter" definition. Also see attached document for transmitter size justification. $1,297,531.50 N/A
Other Electrical Service: Transmitter electrical installation hardware and labor $62,315.00 $62,315.00 see Diamond Electrical quote attached to invoice $62,315.00 N/A
Change Order 1 $10,941.50 $10,941.50 copper plumbing kits $10,941.50 N/A
Transmitter de-install $23,058.00 $23,058.00 removal of old transmitter $5,790.00 N/A

Components

Actual Information Description File Name
Transmitter insallation incidentals

Component Description:
WKCF transmitter installation lift rental 2
Amount:
$659.82

Component Description:
WKCF transmitter installation lift rental
Amount:
$1,689.00
RF Accessories

Component Description:
WKCF transmitter RF accessories
Amount:
$76,222.30
Shipping

Component Description:
WKCF transmitter shipping
Amount:
$17,016.56
Change Order 2

Component Description:
WKCF transmitter CO2
Amount:
$22,885.61
Electrical Accessories

Component Description:
WKCF transmitter electrical accessories
Amount:
$13,430.49
Sales Tax

Component Description:
WKCF transmitter sales tax 2
Amount:
$465.97

Component Description:
WKCF transmitter sales tax 1
Amount:
$80,216.06
Change Orders

Component Description:
WKCF transmitter Change Order Q-80994
Amount:
$1,762.82

Component Description:
WKCF transmitter Change Order Q-76084
Amount:
$2,903.35

Component Description:
WKCF transmitter Change Order Q-79219
Amount:
$22,583.98
UHF - Liquid Cooled Solid State Transmitter 50.1 kW

Component Description:
Transmitter 2nd deposit
Amount:
$264,187.87

Component Description:
WKCF transmitter installation
Amount:
$82,198.75

Component Description:
WKCF transmitter 4
Amount:
$318,904.14

Component Description:
WKCF transmitter one-third prior to shipping. Invoice with supporting documentation.
Amount:
$481,216.30

Component Description:
Transmitter 1st deposit
Amount:
$151,024.44
Other Electrical Service: Transmitter electrical installation hardware and labor

Component Description:
WKCF transmitter electrical installation
Amount:
$62,315.00
Change Order 1

Component Description:
WKCF transmitter CO1
Amount:
$10,941.50
Transmitter de-install

Component Description:
transmitter removal to provide space for repack transmitter
Amount:
$5,790.00

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $491,557.72 $603,502.72 N/A $520,159.22 N/A
Total for all systems $4,111,774.14 $3,576,942.76 N/A $2,782,932.87 N/A
Interim Antenna TFU-24WB/VP-1-R S230 $204,732.00 $167,152.00 $125,364.00
Combiner Installation $2,775.00 $2,775.00 WKCF portion of combiner installation per attached ATC documentation: WKCF Orlando Bithlo 282644 Repack Cost Estimates 6-19-20181.pdf $2,081.25 N/A
Combiner Connection $39,660.00 $39,660.00 cost per ATC documentation $29,745.00 N/A
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) $13,700.00 $5,400.00 N/A $4,050.00 N/A
New combiner, cost per channel (without antenna) $84,200.00 $57,150.00 see WKCF Orlando Bithlo 282644 Repack Cost Estimates 6-19-20181.pdf $42,862.50 N/A
Sweep test of existing antenna $6,730.00 $4,500.00 N/A $3,375.00 N/A
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 1000 kW input, directional,, elliptically or circularly polarized $57,667.00 $57,667.00 WKCF portion of interim antenna per attached revised ATC documentation: WKCF Orlando Bithlo 282644 Repack Cost Estimates 6-19-20181.pdf $43,250.25 N/A
Primary Antenna TFU-27ETT-R 4C140 $286,825.72 $436,350.72 $394,795.22
Sales Tax $20,795.72 $20,795.72 Florida Sales Tax $20,795.72 N/A
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized $247,000.00 $415,555.00 per Dielectric quote (WKCF Main Antenna quote.pdf) in attachments $373,999.50 First invoice not itemized. Actual antenna price is $230,728.00 per Dielectric quote (WKCF Main Antenna quote.pdf) in attachments
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) $12,300.00 $0.00 per Dielectric quote (WKCF Main Antenna quote.pdf) in attachments $0.00 N/A
Feed-through components $0.00 $0.00 per Dielectric quote (WKCF Main Antenna quote.pdf) in attachments $0.00 N/A
Mounting Pole extension $0.00 $0.00 per Dielectric quote (WKCF Main Antenna quote.pdf) in attachments $0.00 N/A
Wedding Cake Mount Adapter $0.00 $0.00 per Dielectric quote (WKCF Main Antenna quote.pdf) in attachments $0.00 N/A
Shipping $0.00 $0.00 per Dielectric quote (WKCF Main Antenna quote.pdf) in attachments $0.00 N/A
Sweep test of existing antenna $6,730.00 $0.00 per Dielectric quote (WKCF Main Antenna quote.pdf) in attachments $0.00 N/A

Components

Actual Information Description File Name
Combiner Installation

Component Description:
WKCF combiner installation milestone 1
Amount:
$693.75

Component Description:
WKCF combiner installation milestone 2
Amount:
$1,387.50
Combiner Connection

Component Description:
WKCF combiner connection milestone 1
Amount:
$9,915.00

Component Description:
WKCF combiner connection milestone 2
Amount:
$19,830.00
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed)

Component Description:
WKCF elbow complex milestone 2
Amount:
$2,700.00

Component Description:
WKCF elbow complex milestone 1
Amount:
$1,350.00
New combiner, cost per channel (without antenna)

Component Description:
WKCF combiner milestone 1
Amount:
$14,287.50

Component Description:
WKCF combiner milestone 2
Amount:
$28,575.00
Sweep test of existing antenna

Component Description:
WKCF sweep test milestone 2
Amount:
$2,250.00

Component Description:
WKCF sweep test milestone 1
Amount:
$1,125.00
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 1000 kW input, directional,, elliptically or circularly polarized

Component Description:
WKCF interim antenna milestone 2
Amount:
$28,833.50

Component Description:
WKCF interim antenna milestone 1
Amount:
$14,416.75
Sales Tax

Component Description:
WKCF Dielectric Sales Tax 1
Amount:
$20,795.72
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized

Component Description:
Dielectric WKCF, Main Antenna; 9.19.2017; $186,999.75 payments 1&2 - 45%
Amount:
$186,999.75

Component Description:
WKCF main antenna payment 2
Amount:
$186,999.75
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed)

Component Description:
WKCF elbow complex payment 2
Amount:
N/A
Feed-through components

Component Description:
WKCF feed thru components payment 2
Amount:
N/A
Mounting Pole extension

Component Description:
WKCF mounting pole payment 2
Amount:
N/A
Wedding Cake Mount Adapter

Component Description:
WKCF antenna mount adapter payment 2
Amount:
N/A
Shipping

Component Description:
WKCF antenna shipping payment 2
Amount:
N/A
Sweep test of existing antenna

Component Description:
WKCF antenna and line sweep payment 2
Amount:
N/A

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $982,175.00 $519,900.00 N/A $430,509.50 N/A
Total for all systems $4,111,774.14 $3,576,942.76 N/A $2,782,932.87 N/A
Interim Transmission Line $608,475.00 $164,700.00 $123,525.00
Rigid Transmission Line - copper, 8 3/16" broadband $608,475.00 $164,700.00 per attached ATC documentation: WKCF Orlando Bithlo 282644 Repack Cost Estimates 6-19-20181.pdf $123,525.00 N/A
Primary Transmission Line $373,700.00 $355,200.00 $306,984.50
Rigid Transmission Line - copper, 6 1/8" $373,700.00 $355,200.00 N/A $306,984.50 N/A

Components

Actual Information Description File Name
Rigid Transmission Line - copper, 8 3/16" broadband

Component Description:
WKCF transmission line milestone 1
Amount:
$41,175.00

Component Description:
WKCF transmission line milestone 2
Amount:
$82,350.00
Rigid Transmission Line - copper, 6 1/8"

Component Description:
WKCF Dielectric transmission line payments 1&2 - 45%; $132,934.50
Amount:
$132,934.50

Component Description:
WKCF transmission line payment 3
Amount:
$41,115.50

Component Description:
WKCF transmission line payment 2
Amount:
$132,934.50

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $610,900.00 $443,075.82 N/A $66,175.82 N/A
Total for all systems $4,111,774.14 $3,576,942.76 N/A $2,782,932.87 N/A
Primary Tower GTOWER $610,900.00 $443,075.82 $66,175.82
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $400,000.00 see attached tower rigging explanation $37,500.00 N/A
Tower Project Management $2,500.00 $2,500.00 per attached ATC documentation $1,875.00 N/A
Minor tower reinforcement/modifications $158,000.00 $17,500.00 N/A $13,125.00 N/A
Tower Permit Drawing Package $4,700.00 $4,700.00 per attached ATC documentation N/A N/A
Structural engineering tower load study for a documented tower with candelabra $20,000.00 $13,675.82 per updated ATC documentation with tax $13,675.82 a
Ground and Building A-E Permit Drawing Package $4,700.00 $4,700.00 per attached ATC documentation N/A N/A

Components

Actual Information Description File Name
Complex Tower (includes, for example, those with candelabras and/or stacked antennas)

Component Description:
WKCF tower work milestone 1
Amount:
$12,500.00

Component Description:
WKCF tower work milestone 2
Amount:
$25,000.00
Tower Project Management

Component Description:
WKCF tower project management milestone 2
Amount:
$1,250.00

Component Description:
WKCF tower project management milestone 1
Amount:
$625.00
Minor tower reinforcement/modifications

Component Description:
WKCF tower modifications milestone 2
Amount:
$8,750.00

Component Description:
WKCF tower modifications milestone 1
Amount:
$4,375.00
Tower Permit Drawing Package Information not provided.
Structural engineering tower load study for a documented tower with candelabra

Component Description:
WKCF tower structural analysis
Amount:
$4,888.00

Component Description:
WKCF tower mapping
Amount:
$8,787.82
Ground and Building A-E Permit Drawing Package Information not provided.

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $228,348.00 $213,235.80 N/A $59,808.56 N/A
Total for all systems $4,111,774.14 $3,576,942.76 N/A $2,782,932.87 N/A
Outside Professional Services $228,348.00 $213,235.80 $59,808.56
Transmitter Site Survey $20,600.00 $20,600.00 Transmitter planning survey & transmitter building drawings $20,600.00 N/A
Site Coordination Meeting $1,000.00 $1,000.00 per attached ATC documentation $750.00 N/A
RF System Test $3,333.00 $3,333.00 Testing of the combiner to ensure all frequencies are tuned for optimal patterns per attached ATC documentation: WKCF Orlando Bithlo 282644 Repack Cost Estimates 6-19-20181.pdf. $2,499.75 N/A
RF Exposure Measurements $21,050.00 $20,000.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $7,360.00 $3,500.00 N/A N/A N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $15,967.80 see associated invoices $15,967.80 N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A $1,891.62 N/A
Project management of the transition $120,080.00 $100,000.00 N/A N/A N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A $1,247.17 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A $1,875.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $6,050.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $2,012.50 N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application $2,105.00 $2,050.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application $1,580.00 $1,535.00 N/A N/A N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,500.00 N/A $812.50 N/A
Non-Catalog legal expenses $20,000.00 $20,000.00 Non-Catalog expenses for legal advice and services, including financial/reimbursement review, transition reporting, transition procedures, and other transition-related issues $6,102.22 N/A

Components

Actual Information Description File Name
Transmitter Site Survey

Component Description:
WKCF GatesAir Site survey
Amount:
$20,600.00
Site Coordination Meeting

Component Description:
WKCF site coordination mtng milestone 2
Amount:
$500.00

Component Description:
WKCF site coordination mtng milestone 1
Amount:
$250.00
RF System Test

Component Description:
WKCF interim RF system test milestone 1
Amount:
$833.25

Component Description:
WKCF interim RF system test milestone 2
Amount:
$1,666.50
RF Exposure Measurements Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees - Negotiation of lease and other matters for shared locations

Component Description:
WKCF legal for lease negotiations 1
Amount:
$8,783.55

Component Description:
WKCF legal for lease negotiations 3
Amount:
$6,835.50

Component Description:
WKCF legal for lease negotiations 2
Amount:
$348.75
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
WKCF Prepare and File FCC Form 2100, Construction Permit Application
Amount:
$837.10

Component Description:
WKCF Prepare and File FCC Form 2100, Construction Permit Application 2
Amount:
$1,054.52
Project management of the transition Information not provided.
Prepare and or review reimbursement form

Component Description:
WKCF Prepare and/or review reimbursement Form 399 2
Amount:
$300.07

Component Description:
WKCF Prepare and/or review reimbursement Form 399
Amount:
$947.10
Address transition timing and coordination issues w/ other stations and wireless

Component Description:
WKCF transition coordination milestone 2
Amount:
$1,250.00

Component Description:
WKCF transition coordination milestone 1
Amount:
$625.00
Perform engineering study for new channel assignment and antenna development

Component Description:
engineering study for new channel assignment
Amount:
$1,375.00

Component Description:
WKCF interim antenna development milestone 2
Amount:
$2,500.00

Component Description:
WKCF interim antenna development milestone 1
Amount:
$1,250.00

Component Description:
WKCF engineering study for new channel assignment
Amount:
$125.00

Component Description:
engineering study for new channel assignment
Amount:
$800.00
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Prepare engineering section of FCC Form 2100, Construction Permit Application
Amount:
$2,012.50
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application Information not provided.
Prepare request for Special Temporary Authorization

Component Description:
WKCF RF consulting for interim antenna STA
Amount:
$812.50
Non-Catalog legal expenses

Component Description:
WKCF non-catalog legal 2
Amount:
$3,690.02

Component Description:
WKCF non-catalog legal 1
Amount:
$2,412.20

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $144,639.46 $143,074.46 N/A $89,865.81 N/A
Total for all systems $4,111,774.14 $3,576,942.76 N/A $2,782,932.87 N/A
Other Expenses $144,639.46 $143,074.46 $89,865.81
DTV Medical Facility Notification $11,550.00 $10,000.00 N/A $5,131.20 N/A
Contract Labor $4,209.46 $4,209.46 accounting labor directly related to the Spectrum Repack project $4,209.46 N/A
ATC one-time tower rental $57,600.00 $57,600.00 ATC one-time tower rental during market repack period per attached ATC documentation. $57,600.00 N/A
ATC Tax $30,000.00 $30,000.00 estimate based on current and expected future ATC invoices $19,550.15 N/A
MVPD Notification of Channel Change $2,500.00 $2,500.00 Attorney assistance in coordinating MVPD notification N/A N/A
Develop and air announcement of upcoming channel change $2,500.00 $2,500.00 Attorney review to ensure FCC compliance N/A N/A
Equipment Storage $30,500.00 $30,500.00 Estimate for 1 year of antenna storage. See attached Dielectric document. N/A N/A
Equipment Delivery and Handling Charges $4,500.00 $4,500.00 per attached ATC documentation: WKCF Orlando Bithlo 282644 Repack Cost Estimates 6-19-20181.pdf $3,375.00 N/A
Local Zoning $750.00 $750.00 per attached ATC documentation N/A N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $190.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 N/A N/A N/A

Components

Actual Information Description File Name
DTV Medical Facility Notification

Component Description:
WKCF medical notification
Amount:
$5,131.20
Contract Labor

Component Description:
WKCF accounting labor
Amount:
$4,209.46
ATC one-time tower rental

Component Description:
WKCF interim antenna rental 2
Amount:
$51,587.81

Component Description:
WKCF interim antenna rental 1
Amount:
$6,012.19
ATC Tax

Component Description:
WKCF sales tax for ATC invoice milestone 1
Amount:
$6,586.41

Component Description:
WKCF sales tax for ATC invoice milestone 2
Amount:
$12,963.74
MVPD Notification of Channel Change Information not provided.
Develop and air announcement of upcoming channel change Information not provided.
Equipment Storage Information not provided.
Equipment Delivery and Handling Charges

Component Description:
WKCF interim delivery and handling milestone 2
Amount:
$2,250.00

Component Description:
WKCF interim delivery and handling milestone 1
Amount:
$1,125.00
Local Zoning Information not provided.
FCC Filing Fees - Special Temporary Authorization request Information not provided.
FCC Filing Fees - Form 2100 license to cover application Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $4,111,774.14 $3,576,942.76 $2,782,932.87

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

John Drain

Hearst Television SVP Chief Financial Officer


10/18/2019

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Douglas Durkee

Hearst Television Manager of Spectrum Repack


10/18/2019