Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
35213
Service:
FM
Call Sign:
WZJZ
File Number:
0000086319
FRN:
0014042816
Eligibility Status:
Eligible
Date Submitted:
10/15/2019

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

CLEAR CHANNEL BROADCASTING LICENSES, INC.

Doing Business As: CLEAR CHANNEL BROADCASTING LICENSES, INC.

Troy Langham

7136 S. YALE AVENUE

SUITE 501

TULSA, OK 74136

United States

+1 (918) 664-4581 FCCCONTACT@IHEARTMEDIA.COM Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

The Preparer is same as the reimbursement contact.

 

 

 

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan Will be forced to abandon use of main antenna to facilitate installation of temporary TV antenna and line. Moved to aux where we installed a new hybrid transmitter to preserve HD operation.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Ownership Owned
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? No
Existing Transmitter Manufacturer and Type Manufacturer
Model HT35CD
Year 1996
Type Other Type
Other Transmitter Type Tube
Power Capacity 30.1 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model GV10
Transmitter Type Solid State
Solid State Cooling Air Cooled
Model Type Analog
Solid State Power capacity 10 kW
Justification for New Transmitter Provide for HD/Digital from Aux facility
Does the transmitter require the purchase of a new HD Importer? Yes
Does the transmitter require the purchase of a new HD Exporter? Yes

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Other Transmitter Costs Does the transmitter installation require an Additional Exciter? No
Does the transmitter installation require any additional transmitter installation costs? Yes
Does the transmitter installation require a Transmitter Building Site Survey/Installation? No
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Rigid Conduit and Wiring No
Other Electrical Service Yes
Description UPS
HVAC Service Does the replacement transmitter require HVAC Service? No
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Other Transmitter-Related Expenses Does the replacement transmitter require a Remote Control? No
Does the replacement transmitter require an RDS Encoder? Yes
Does the replacement transmitter require Audio Processing? Yes
Audio Processing Analog/HD Upgraded

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Equipment Rack

Rack

Indoor Transmission Line

LIne and elbows

Data Switch

Data Switch

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? No

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? No

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? No

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? No
Outside RF consulting Engineering Services Prepare engineering section of Form FCC Construction Permit Application No
Prepare engineering section of Form FCC License to Cover Application No
Prepare request for Special Temporary Authority No
Prepare Form 601 No
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application No
Prepare and file Form FCC License to Cover Application No
Prepare request for Special Temporary Authority No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement No
Form 399 assistance or other program management costs No
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service No

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Information not provided.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Permit and Filing Costs FCC Construction Permit Major Change No
FCC Construction Permit Minor Change No
FCC License to Cover Application No
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? No
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? No
Does this relocation require Equipment Storage? No
Point to Point Microwave (STL/ICR) Frequency Coordination for Unidirection System No
Frequency Coordination for Bi-Direction System No
New Point to Point Microwave System No
1 pair IP-only Codecs for fiber, internet or IP microwave systems Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $156,778.86 $121,339.88 N/A $0.00 N/A
Total for all systems $162,628.86 $127,426.74 N/A $0.00 N/A
Primary Transmitter GV10 $156,778.86 $121,339.88 $0.00
Other Transmitter-Related Expenses RDS Encoder $1,750.00 $2,403.71 Worldcast Audemat RDS N/A N/A
Data Switch $495.00 $495.00 N/A N/A N/A
Equipment Rack $797.42 $797.42 N/A N/A N/A
Indoor Transmission Line $8,402.45 $8,402.45 N/A N/A N/A
Air Cooled Solid State FM Transmitter 7 - 10 kW Analog $58,175.00 $57,609.65 N/A N/A N/A
HD Exporter $2,550.00 $5,036.33 GatesAir FMXI-4G N/A N/A
HD Importer $2,550.00 $5,036.33 Gates FMXI-4g N/A N/A
Other Electrical Service: UPS $558.99 $558.99 N/A N/A N/A
Transmitter Installation $70,500.00 $30,000.00 N/A N/A N/A
Audio Processing - Analog /HD upgraded $11,000.00 $11,000.00 N/A N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Antennas

Information not provided.

Cost Information

Back to Top

Transmission Line

Information not provided.

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Information not provided.

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $0.00 $0.00 N/A $0.00 N/A
Total for all systems $162,628.86 $127,426.74 N/A $0.00 N/A
Outside Professional Services $0.00 $0.00 $0.00

Components

Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $5,850.00 $6,086.86 N/A $0.00 N/A
Total for all systems $162,628.86 $127,426.74 N/A $0.00 N/A
Other Expenses $5,850.00 $6,086.86 $0.00
Point to Point Microwave (STL/ICR): 1 pair IP-only Codecs for fiber, internet or IP microwave systems $5,850.00 $6,086.86 GatesAir IX-IPL-100P-DPKG N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $162,628.86 $127,426.74 $0.00

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel.
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Stephen G Davis

SVP, RE, Facilities and Corp Development


10/15/2019

Attachments

Back to Top
Information not provided.