Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
ENTERCOM LICENSE, LLC Doing Business As: ENTERCOM LICENSE, LLC |
2400 MARKET STREET 4TH FLOOR PHILADELPHIA, PA 19103 United States |
+1 (610) 660-5610 | ANDREW.SUTOR@ENTERCOM.COM | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
John D. Kennedy Entercom Communications Corp |
2400 Market Street 4th Foor Philadelphia, PA 19103 United States |
+1 (484) 270-6320 | john.kennedy@entercom.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | See Attached |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels | 3 | |
Design power capacity in use | 70.0 % | |
Lower Limit | 101.10 MHz | |
Upper Limit | 101.10 MHz | |
ERP: | 100.0 kW | |
Manufacturer | ||
Model | 757 502 | |
Year | 1984 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 3 | |
Lower Limit | 101.10 MHz | |
Upper Limit | 101.10 MHz | |
Design power capacity in use | 71.0 % | |
ERP: | 100.0 kW | |
Manufacturer | ||
Model | 1083-4CP | |
Year | 2018 | |
Justification for New Antenna | 34 year old Alan Dick antenna was removed for construction. Due to obsolescence of antenna and inability to find replacement parts, returning the antenna onto the tower at a different level and mounting configuration was not an option. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
FM Band Pass Filters | Do you require an FM band pass filter? | No |
Notch Filter | Do you require a Notch filter? | No |
De-Icers | Do you require De-Icers? | No |
Radomes | Do you require Radomes? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Air | |
Diameter | 4 inches | |
Number of parallel runs | 1 | |
Length | 1250 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Type | Rigid | |
Diameter | 4 1/16 inches | |
Segment Length | 20 inches | |
Number of parallel runs | 1 | |
Length | 1220 feet per run | |
Justification for New Transmission Line | Previous line had to be repurposed for auxiliary antenna at lower height. New line necessary to reestablish run to new antenna | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | Yes |
Does the Installation of the Transmission Line require additional or replacement Inside RF system elbows, fitting, hangers, etc.? | Yes |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Prepare engineering section of Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
Prepare and file Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | No | |
Form 399 assistance or other program management costs | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 1 | |
Justification | New Antenna and line confirmation of proper operation |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No | |
1 pair IP-only Codecs for fiber, internet or IP microwave systems | No |
Name | Description |
---|---|
WROQ Main Antenna Ancillary Cost |
Antenna and line installation costs, additional tech labor, structural analysis |
WROQ Main Antenna Ancillary Cost |
Antenna and line installation costs, additional tech labor, structural analysis |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $33,350.00 | $217,817.28 | N/A | $0.00 | N/A |
Total for all systems | $252,189.84 | $372,857.19 | N/A | $0.00 | N/A |
Primary Antenna 1083-4CP | $33,350.00 | $217,817.28 | $0.00 | ||
High Power 51 - 100 kW Panel (three panels per bay) | $33,350.00 | $217,817.28 | See Attached | $0.00 | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $160,428.53 | $95,783.60 | N/A | $0.00 | N/A |
Total for all systems | $252,189.84 | $372,857.19 | N/A | $0.00 | N/A |
Primary Transmission Line | $160,428.53 | $95,783.60 | $0.00 | ||
Interior RF Systems: Elbows, fitting, hangers, etc. | $0.00 | $0.00 | Included in Transmission LIne Costs | N/A | N/A |
Interior RF Systems: Inside RF system including switching, patch panels and dehydrators | $10,368.53 | $10,368.53 | See Attached | N/A | N/A |
Rigid Transmission Line - copper, 4 1/16" | $150,060.00 | $85,415.07 | See Attached | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $7,655.00 | $8,500.00 | N/A | $0.00 | N/A |
Total for all systems | $252,189.84 | $372,857.19 | N/A | $0.00 | N/A |
Outside Professional Services | $7,655.00 | $8,500.00 | $0.00 | ||
Additional Field Engineering Service, 1 Days | $4,500.00 | $4,500.00 | Service for antenna system and line installation checkout | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,500.00 | Additional cost due to design of DA facility | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,500.00 | Additional work by consultant to revise application due to modified heights and DA patterns | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $50,756.31 | $50,756.31 | N/A | $0.00 | N/A |
Total for all systems | $252,189.84 | $372,857.19 | N/A | $0.00 | N/A |
Other Expenses | $50,756.31 | $50,756.31 | $0.00 | ||
WROQ Main Antenna Ancillary Cost | $50,221.31 | $50,221.31 | Ancillary costs; see attached | $0.00 | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $200.00 | $200.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $252,189.84 | $372,857.19 | $0.00 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | John D Kennedy VP of Technical Operations 10/15/2019 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | John D Kennedy VP of Technical Operations 10/15/2019 |