Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
SARKES TARZIAN, INC. Doing Business As: SARKES TARZIAN, INC. |
Jamie Till 205 NORTH COLLEGE AVE. SUITE 800 BLOOMINGTON, IN 47402 United States |
+1 (812) 332-7251 | JTILL@STFORTWAYNE.COM | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Nancy A Ory Member Lerman Senter PLLC |
Nancy Ory 2001 L Street, NW, Suite 400 Washington, DC 20036 United States |
+1 (202) 416-6791 | NORY@LERMANSENTER.COM |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Station WTTS was required to install a switch that would enable WTTS to switch between its main and auxiliary antenna remotely several times per day during the four week period required for the construction of WTTV's post-transition facilities. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 3 | |
Explanation | Professional services to manage 399 reimbursement process. | |
Outside RF consulting Engineering Services | Prepare engineering section of Form FCC Construction Permit Application | No |
Prepare engineering section of Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
Prepare and file Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No | |
1 pair IP-only Codecs for fiber, internet or IP microwave systems | No |
Name | Description |
---|---|
Dielectric Control Cable and Switch |
WTTS had to purchase and install a control cable and switch to enable it to remotely switch between its main and auxiliary antenna during the construction of the co-located television station WTTV. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $3,526.50 | $3,737.50 | N/A | $0.00 | N/A |
Total for all systems | $7,111.33 | $7,322.33 | N/A | $0.00 | N/A |
Outside Professional Services | $3,526.50 | $3,737.50 | $0.00 | ||
Project management of the transition | $316.50 | $527.50 | N/A | N/A | N/A |
Form 399 assistance or other Program Management costs | $1,500.00 | $1,500.00 | Additional professional services to manage 399 reimbursement process. | N/A | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $3,584.83 | $3,584.83 | N/A | $0.00 | N/A |
Total for all systems | $7,111.33 | $7,322.33 | N/A | $0.00 | N/A |
Other Expenses | $3,584.83 | $3,584.83 | $0.00 | ||
Dielectric Control Cable and Switch | $3,584.83 | $3,584.83 | Dielectric 25' Control Cable for 60000 switch and Dielectric/SPX Dual Universal Coax Switch Control Panel/3RU | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $7,111.33 | $7,322.33 | $0.00 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Brad Holtz Vice President/GM 10/15/2019 |